Fig. 1 Earthworks construction planning stage
Fig. 2 Earthquake risk case
Fig. 3 Deriving influence factors of earthworks work plan
Fig. 4 Filter TLS data and MMS data and save them as one file
Fig. 5 Mapping of geotechnical survey results to 3D geospatial model
Fig. 6 Create and calculate main system cells
Fig. 7 Analysis cell based soil properties and influence factor management data example
Fig. 8 Linking 3D geospatial information model and influence factor management technology
Fig. 9 Earthwork influence factor management process
Fig. 10 Impact Factor Management Application Example
참고문헌
- Y. S. OH, S. K, LEE, Y. S. KIM, "A Review of the Role of Spatial Information and Demonstration Proposal for Smart Construction", Proceedings of the Korean Society for Geospatial Information Science, pp. 31-32, (2018).
- J. P. Park, "Designing and Utilizing a Smart Factory Roadmap for CEOs: Leveraging from University-Industry Research Collaboration", Journal of The Korean Society of Industry Convergence 21(6), pp .285-299, (2018). https://doi.org/10.21289/KSIC.2018.21.6.285
- H. Y. Park, Y. H. Tae, S. K. Woo, "A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation", Korean Journal of Construction Engineering and Management, KICEM, 8(3), pp. 97-105, (2007).
- K. B, Lee, Y. S. Kim, "Development of a Subsurface Exploration Analysis System Using Clustering Technique on Bore - hole Information ". Proceedings of KOREA INFORMATION SCIENCE SOCIETY, 27(1B), pp. 93-95, (2000).
- Hugenholtz, C. H., Walker, J., Brown, O. and Myshak, S., "Earthwork Volumetrics with an Unmanned Aerial Vehicle and Softcopy Photogrammetry", Journal of Surveying Engineering, Vol. 141, Issue 1, (2015).
- Sebastian, S., Jochen, T., "Mobile 3D mapping for surveying earthwork project using an Unmanned Aerial Vehicle (UAV) system", Automation in Construction, 41, pp. 1-14, (2014). https://doi.org/10.1016/j.autcon.2014.01.004
- S. B. Lim, C. W. Seo, H. C. Yun, "Earthwork Management for Dredged Soil Dumping Area by using Drone", Proceedings of the Korean Society of Civil Engineers, KSCE, pp.99-100, (2015).
- S. W. Moon, C. G. Moon, "Utilization of a Smart Glass for Improving Data Interface During the Earthwork Operation", Journal of the Korean Society of Civil Engineers, 37(1), pp.167-174, (2017). https://doi.org/10.12652/Ksce.2017.37.1.0167
- S. Y. Lim, S. K. Kim, "A Study on the Real-time Earthwork with Optimal Operation System of Construction Equipment", Proceedings of the conference on Korean Society of Civil Engineers, KSCE, pp. 1253-1254, (2017).
- D. H. Lee, J. W. Park, "System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology", Journal of the Korea Contents Association, 18(6), pp. 303-313, (2018). https://doi.org/10.5392/JKCA.2018.18.06.303
- S. S. Lee, K. N. Kim, J. W. Seo, "Analyzing effect factor in earthwork and skillful excavator operator's behavior", Proceedings of the Korean Society of Civil Engineers, KSCE, pp. 1867-1870, (2008).
- Korea Occupational Safety & Health Agency (KOSHA), Education Materail for Construction Industry 91(2008-11), Safety for Excavation, (2008).
- KOREA INSTITUTE of CIVIL ENGINEERING and BUILDING TECHNOLOGY(KICT), Standard of Construction Estimate, (2019).