Fig. 1. Research Process
Fig. 2. Historical Hanok DB Repository
Fig. 4. Distributions of Work Section Cost by Reference Area
Fig. 5. Directions for Modernized Hanok
Table 1. Classifications for Analyses
Table 2. Outline of Modernized Hanok Test-bed Projects
Table 3. Comparisons of Unit Cost based on Work Section (Six Test-bed Projects)
Table 5. Cost Variations by Methods
Table 6. Construction Cost Formulae by Unit Cost and Regression based on Hanok Test-bed Projects
Table 7. Accuracy Comparisons between Cost Formulae for Hanok
Table 4. Change of Modernized Hanok Techniques by cases
References
- Cho, H.J., Kim, S.H., and Kim, W.J. (2012). "Development of Hanok Modeling." Proceedings of 2012 Winter Conference of Society for Computational Design and Engineering, pp. 696-701.
- Jung, Y.S., Kim, W.J., and Ha, J.W. (2012). "Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok)." Transactions of the Society of CAD/CAM Engineers, 17(4), pp. 225-233. https://doi.org/10.7315/CADCAM.2012.225
- Kim, M., Kim, Y.S., Lee, Y.S., and Jung, Y. (2013). "Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 107-114. https://doi.org/10.6106/kJCEM.2013.14.3.107
- Kim, M., Kim, H.S., Ryu, J.S., and Jung, Y. (2014). "New Building Materials and Methods for Modernized Korean Housing (Hanok)." Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 23-32. https://doi.org/10.6106/KJCEM.2014.15.2.023
- Seo, N.R., Lee, Y.S., Kang, S.H., and Jung, Y.S. (2017). "Defining Hanok Elements for Modernized Hanok." Proceedings of the 2017 KICEM Annual Conference, Seoul, Korea, pp. 95-96.