Fig. 1. Research methodology
Fig. 2. IPA Result of main category factors
Fig. 3. IPA result of main contractors
Fig. 4. IPA result of sub-contractors
Fig. 5. IPA results of the sub-category factors
Table 1. Major mgmt. factors for time management of RC works
Table 2. Factors decreasing construction productivity in housing project
Table 3. Factors decreasing construction productivity in building project
Table 4. Management factors of crew-productivity
Table 5. General information of the survey respondents
Table 6. IPA results of sub-category factors
References
- Ahn, S.H., and Yu, J.H. (2009). "Management of work efficiency and work condition in construction site." Journal of Excellent Graduation Thesis of the Architectural Institute of Korea, AIK, 5, pp. 381-384.
- Baek, K.G., Kang, S.H., Baek H.G., and Seo J.W. (2009). "A Study on the factors of haul routes planning for earthmoving." Journal of Conference Korea Institute of Construction Engineering and Management, KICEM. pp. 899-903.
- H. Randolph Thomas (1991). "Labor productivity and work sampling: the bottom line." Journal of Construction Engineering and Management, ASCE, 117(3), pp. 423-444. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:3(423)
- Kim, B.S., and Kwon, S.H. (2009). "The conceptual cost estimate model on preliminary design phase for RC rahmen bridge." Korean Journal of Construction Engineering and Management, KICEM, 10(2), pp. 111-120.
- Kim, J.W., Kim, Y.S., Kim, Y.S., and Kim, S.B. (2008). "WBS development for acquisition and analysis of public housing productivity data." Korean Journal of Construction Engineering and Management, KICEM, 9(5), pp. 86-94.
- Lee, D.W., Cho, H.J., Lee, K.J., and Kim, N.S. (2011). "Productivity analysis on the standard quantity-per-unit costing method and work crew combination method : focused on non-vibration mass excavation method." Journal of Korean Society of Civil Engineers, KSCE, 31(3), pp. 457-468.
- Lee, K.J., and Kim, Y.S. (2010). "An importance analysis for the major schedule management factors classified by construction participants in high-rise building reinforced concrete work." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 26(12), pp. 185-192.
- Kim, J.Y., Choi, J.H., and Lee, S.H. (2011). "Factors affecting the losses of domestic construction productivity and strategies for avoiding them." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 27(2), pp. 113-124.
- Lee, S.B., and Pyo, Y.M. (2007). "A study on the analysis of factors decreasing construction labor-productivity using AHP method." Journal of the Architectural Institute of Korea Structure & Construction, AIKRA, 9(1), pp. 179-187.
- Lee, S.H. (2004). "The measurement and analysis techniques of total project productivity on transportation projects." Journal of Conference Korea Institute of Construction Engineering and Management, KICEM. pp. 95-100.
- Lee, S.H., and Hong, S.H. (2005). "An evaluation method for the impact of disruptive events on road construction projects using total project productivity." Journal of Korean Society of Civil Engineers, KSCE, 25(5), pp. 747-756.
- O'Connor, James T., and Huh, Y.K. (2005). "Crew production rates for contract time estimation: bent footing, column, and cap of highway bridges." Journal of Construction Engineering and Management, ASCE, 131(9), pp. 1013-1020. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(1013)
- O'Connor, James T., and Huh, Y.K. (2006). "Crew production rates for contract time estimation: beam, erection, deck, and rail of highway bridges." Journal of Construction Engineering and Management, ASCE, 132(4), pp. 408-415. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:4(408)
- Ohn, S.W., Woo, S.K., and Kim, O.K. (2007). "An application of simulation method to planning of road pavement operation." Korean Journal of Construction Engineering and Management, KICEM, 8(1), pp. 124-131.
- Park, S. M., Park, T. E., and Kim, H. K. (2013). "Checklist for the application of concurrent engineering in bridge construction." Korean Journal of Construction Engineering and Management, KICEM, 14(1), pp. 3-11. https://doi.org/10.6106/KJCEM.2013.14.1.003
- Seo, J.H., and Park, H.K. (2011). "A study on the development of standard of estimate of representative construction type of road project." Journal of Conference Korea Institute of Construction Engineering and Management. KICEM. pp. 97-98.
- Son, C.B., and Lee, D.C. (2002). "An analysis on the factors decreasing productivity of building construction." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 18(12), pp. 125-132.
- Yoo, D.Y., Park, H.K., and Lim, H.M. (2013). "A study on the development of work-crew based daily-productivity for representative B.O.Q item in river conservation project." Journal of the Korean Society of Civil Engineers, KSCE, 33(6), pp. 2519-2528. https://doi.org/10.12652/Ksce.2013.33.6.2519
- Yoon, B.S., Yu, J.H., and Kim, C.D. (2010). "An analysis on the influence of work management type on work condition." Korean Journal of Construction Engineering and Management, KICEM, 11(5), pp. 76-84.