A Study on the Effective Calculation of Rebar QTO in the Early Design Phase through the Application of BIM Model

BIM 모델 활용을 통한 초기설계단계에서의 효율적인 철근물량 산출 방안 연구

  • Lee, Jae-Cheol (Department of Architectural Engineering, Tongmyong University)
  • Received : 2019.03.03
  • Accepted : 2019.05.07
  • Published : 2019.05.30

Abstract

In this study, rebar QTO(Quantity Take-Off) was quickly produced from the BIM model prepared by Revit in the early design phase, and the available premium rates were quantitatively presented. For this purpose, the amount of rebar calculated using the BuilderHub, which specializes in calculating rebar QTO, was analyzed according to various factors such as member type, rebar diameter, building size, item type, and order length, and the effect of each factor on the rebar QTO was determined. In addition, the BIM model generated on Revit was used to establish parameters and processes required to produce rebar QTO, and proposed a rebar premium rate and a stirrup/hoop premium rate based on the BuilderHub output results. Through this study, it is expected that a rapid and efficient comparative evaluation of rebar QTO will be possible according to various structural design alternatives in the early design phase.

Keywords

Acknowledgement

Supported by : 동명대학교

References

  1. Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM Handbook-A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, John Wiley & Sons, Inc.
  2. Ham, N., & Kim, J. (2016). Perception Analysis on Practical BIM Application : Myths and Truths, KIBIM Annual Conference, 9-10.
  3. Kim, C. (2016). Review the usability rebar quantity take-off function of reinforcement concrete frame using BuilderHub, KCI Annual Conference, 555-556.
  4. Kim., J., Lee, M., Seo, J., Lee, K., & Lim, J. (2013). Ideality and Reality of BIM -A General Contractor's Perspective-, KIBIM Annual Conference, 9-10.
  5. Kim, J., & Yoon, S. (2013). A Verification of the Accuracy in BIM-based Quantity Taking-Off - Focusing on Finishing Work, Journal of KIBIM, 3(2), 1-9. https://doi.org/10.13161/kibim.2013.3.2.001
  6. Lee, J., Jung, J., & Oh, H. (2013). Work Efficiency Analysis of BIM based Structural Drawing, Journal of Architectural Institute of Korea, 29(6), 21-28.
  7. Ministry of Land, Transport and Maritime Affairs(2010), BIM Guideline for Architectural Field
  8. Public Procurement Service(2015), BIM Guideline for Facilities, V1.3
  9. Virtual Construction Research Group(2010), BIM Guideline for 3D Architectural Design, Volume 1, V2.0