DOI QR코드

DOI QR Code

A Study on Comparison Analysis for Calculating of Weapon System Operation Cost at the Development Stage

개발단계에서 무기체계 운영유지비 예측을 위한 비교분석 연구

  • Received : 2018.12.03
  • Accepted : 2019.02.01
  • Published : 2019.02.28

Abstract

Recently, the importance of Total Life Cycle System Management (TLCSM) and LIFE-CYCLE COSTS management is increasing in the development of weapon systems. In cost management, cost forecasting is important from the initial development stage, but it is difficult to predict the total life cycle cost at the development stage. In this study, we propose efficient management cost calculation and management at the development stage of the weapon system by comparison analysis between the PRICE-HL model and NemoSIM to calculate the maintenance cost under the CAIV concept. Based on the study results, further in-depth analyzes of the PRICE-HL model and NemoSIM input values / results are performed. In addition, we provide a more accurate method of calculating the cost of maintaining and operating the weapon system and a plan to utilize the result of NemoSIM in the ILS element development.

최근 무기체계 개발 시 총수명주기체계관리(TLCSM) 및 전체 순기 간 비용 관리의 중요성이 점차 커지고 있다. 비용 관리 시 사업초기 개발단계부터 비용 예측이 중요하지만 개발단계에서 총수명주기비용을 예측하는 것은 어렵다. 총수명주기 비용은 연구/개발비, 획득투자비, 운영유지비 및 폐기비 등으로 구성되어 있는데, 운용유지비(폐기비 포함)가 가장 큰 부분을 차지하고 있기 때문에, 총수명주기비용 예측 시 운용유지비에 대한 정확한 예측이 필요하다. 본 연구에서는 CAIV 기법을 활용, 운영유지비를 예측하기 위해 상용 비용분석 도구인 PRICE-HL 모델과 RAM 기반 무기체계 운영유지비 예측 도구인 NemoSIM 간의 비교 분석을 통하여, 무기체계 개발단계에서 효율적인 운영유지비 예측 방안 및 분석 결과값을 보급, 정비관련 ILS 요소 개발 시 활용할 수 있는 방안을 제시하고자 한다. 또한, 본 연구를 통해 도출된 결과를 바탕으로, 후속 연구에서는 PRICE-HL 모델과 NemoSIM 입력값/결과값에 대한 심층적 추가 분석을 수행하고 그 결과로 NemoSIM에서 고려하지 않은 비용 항목 및 발전 방향을 도출하여 개발초기 단계에서, 보다 정확한 무기체계 운영유지비용을 산출하는 방안과 NemoSIM의 결과를 ILS 요소개발에 활용 할 수 있는 방안을 구체적으로 제시 할 예정이다.

Keywords

SHGSCZ_2019_v20n2_83_f0001.png 이미지

Fig. 1. NOMINAL LIFE-CYCLE COSTS

SHGSCZ_2019_v20n2_83_f0002.png 이미지

Fig. 2. Research Process

SHGSCZ_2019_v20n2_83_f0003.png 이미지

Fig. 3. Engineering Cost Estimating Method Process

SHGSCZ_2019_v20n2_83_f0004.png 이미지

Fig. 4. Parametric Cost Estimating Method Process

SHGSCZ_2019_v20n2_83_f0005.png 이미지

Fig. 5. PRICE Model Life-Cycle Cost Analysis System

SHGSCZ_2019_v20n2_83_f0006.png 이미지

Fig. 6. System Time Table

SHGSCZ_2019_v20n2_83_f0007.png 이미지

Fig. 7. NemoSIM concept

SHGSCZ_2019_v20n2_83_f0008.png 이미지

Fig. 8. Application System Structure

SHGSCZ_2019_v20n2_83_f0009.png 이미지

Fig. 9. Set Operation Time

SHGSCZ_2019_v20n2_83_f0010.png 이미지

Fig. 10. PRICE-HL Result

SHGSCZ_2019_v20n2_83_f0011.png 이미지

Fig. 11. NemoSIM Result-1

SHGSCZ_2019_v20n2_83_f0012.png 이미지

Fig. 12. NemoSIM Result-2

SHGSCZ_2019_v20n2_83_f0013.png 이미지

Fig. 13. NemoSIM Supply Status - A part

SHGSCZ_2019_v20n2_83_f0014.png 이미지

Fig. 14. Ao, Operation Cost by Supply Policies

SHGSCZ_2019_v20n2_83_f0015.png 이미지

Fig. 15. NemoSIM Human Resourse Status

SHGSCZ_2019_v20n2_83_f0016.png 이미지

Fig. 16. Ao, Operation Cost by Maintenance People

SHGSCZ_2019_v20n2_83_f0017.png 이미지

Fig. 17. Relation of Result Category

SHGSCZ_2019_v20n2_83_f0018.png 이미지

Fig. 18. Example – Result Sensitivity Analysis

SHGSCZ_2019_v20n2_83_f0019.png 이미지

Fig. 19. Graph - Operation Cost per month

SHGSCZ_2019_v20n2_83_f0020.png 이미지

Fig. 20. Example – Set a Optimal Supply Policy

SHGSCZ_2019_v20n2_83_f0021.png 이미지

Fig. 21. Example – Set a Optimal People Policy

Table 1. Costs of NemoSIM

SHGSCZ_2019_v20n2_83_t0001.png 이미지

Table 2. PRICE-HL – NemoSIM Function Comparison

SHGSCZ_2019_v20n2_83_t0002.png 이미지

Table 3. Input Factor Comparison

SHGSCZ_2019_v20n2_83_t0003.png 이미지

Table 4. PRICE-HL model Operation&Support Cost Result

SHGSCZ_2019_v20n2_83_t0004.png 이미지

Table 5. NemoSIM Operation&Support Cost Result

SHGSCZ_2019_v20n2_83_t0005.png 이미지

Table 6. Result comparison

SHGSCZ_2019_v20n2_83_t0006.png 이미지

References

  1. Junghee Hwang, Suhwan Kim, "A study on method to improve cost estimation result of weapon system by using variable transformation", Journal of Korean Institute Of Industrial Engineers, pp. 1392-1398, 2014 Available From : http://www.dbpia.co.kr/Journal/ArticleDetail/NODE02511265
  2. Capt. Gary Jones, USAF, Edward White, Lt Col Erin T. Ryan, USAF, and Lt Col Jonathan D. Ritschel, USAF, "Investigation into the Ratio of Operating and Support Costs to Life-Cycle Costs for DoD Weapon Systems", Defense ARJ,Vol. 21 No. 1 pp 443, A Publication of the Defense Acquisition University, 2014 Available From : http://www.dtic.mil/get-tr-doc/pdf?AD=ADA580758
  3. LEE Pil Jung, Choi Chi Won, "A Study on a Way of CAIV Application to the R&D Project for the Force Support System", Journal of Korea Association of Defense Industry Studies, Vol.21, No.2, pp. 51-68, 2014 Available From : http://www.kadis.or.kr/down.php?tbl_name=board_thesis&tbl_serial=202&no=1
  4. Sung Man Rhee, Chan Sun Lee, Jongyoul-On "Cost Analysis Method for CAIV of Missile Defense R&D with Activity Based Costing", The Korean Society For Aeronautical And Space Sciences, pp. 533-534, 2017 Available From : http://www.dbpia.co.kr/Article/NODE07367064
  5. Hyung-Kyun Byun, Sang-Woo Lee, Moon-Won Kwon, Joo-Kyun Kim, Young-Hwan Choi, "A Case Study on Sensitivity Analysis of KHP Total Ownership Cost", The Korean Reliability Society, pp. 187-212, 2011 Available From : http://www.dbpia.co.kr/Article/NODE02202988
  6. Editor Part, "scientific buisness management technique (EVM/CAIV) application expansion", pp. 13-14, 2012 Available From : http://www.dbpia.co.kr/Article/NODE02283362
  7. Acquisition Logistics Guide, 1997, DSMC(Defense System Management College) Available From : http://www.dtic.mil/dtic/tr/fulltext/u2/a332714.pdf
  8. Seo Mu Kyung, Ju Jin Chol, "Analysis of the effects of use of management on the battle readiness posture rating", Journal of Korean Institute Of Industrial Engineers, pp. 961-967, 2011 Available From : http://www.dbpia.co.kr/Article/NODE01960396
  9. Seok-Youn Han, Soon-Ki Hong, Chen-Soo Ha, "Analysis of Life-Cycle Cost for Urban Transit System using RAM", Journal of Korean Institute Of Industrial Engineers, pp. 477-484, 2005 Available From : http://www.dbpia.co.kr/Article/NODE01939433 https://doi.org/10.7232/JKIIE.2014.40.5.477
  10. Suk Ho Kim, Soo Choong Park, Kwang Woo Jung, "Rollingstock life-cycle cost analysis based on the RAM", Journal of The Korean Society For Railway, pp. 803-808, 2016 Available From : http://www.dbpia.co.kr/Article/NODE06691529