References
- Alonso, V., Abreu, O., Cuesta, A. and Alvear, D. (2014), "An Evacuation model for risk analysis in Spanish Road Tunnels", Procedia-Social and Behavioral Sciences, 162, 208-2017. https://doi.org/10.1016/j.sbspro.2014.12.201
- Alvear, D., Abreu, O., Cuesta, A. and Alonso, V. (2013), "Decission support systém for emergency management: Road tunnels", Tunn. Undergr. Sp. Tech., 4, 13-21.
- Aven, T. and Heide, B. (2009), "Reliability and validity of risk analysis", Reliab. Eng. Syst. Safe., 94, 1862-1868. https://doi.org/10.1016/j.ress.2009.06.003
- Bari, S. and Nasser, J. (2005), "Simulation of smoke from a burning vehicle and pollution levels caused by traffic jam in a road tunnel", Tunn. Undergr. Sp. Tech., 20, 281-290. https://doi.org/10.1016/j.tust.2004.09.002
- Beard, A.N. (2010), "Tunnel safety, risk assessment and decision-making", Tunn. Undergr. Sp. Tech., 25, 91-94. https://doi.org/10.1016/j.tust.2009.07.006
- Bjelland, H. and Aven, T. (2013), "Treatment of uncertainty in risk assessment in the Rogfast road tunnel project", Safety Sci., 55, 34-44. https://doi.org/10.1016/j.ssci.2012.12.012
- Boer, L.C. (2003), "Behaviour of drivers during tunnel evacuation", Claim. Undergr. Sp., 213-217.
- Borg, A., Bjelland, H. and Nja, O. (2014), "Reflections on Bayesian Network models for road tunnel safety design. A case study from Norway", Tunn.Undergr. Sp. Tech., 43, 300-314. https://doi.org/10.1016/j.tust.2014.05.004
- Caliendo, C., Ciambelli, P., Gugluielmo, M.L., Meo, M.G. and Russo, P. (2013), "Simulation of fire scenarios due to different vehicle types with and without traffic in bi-directional road tunnel", Tunn.Undergr. Sp. Tech., 37, 22-36. https://doi.org/10.1016/j.tust.2013.03.004
- Capote, J.A., Alvear, D., Abreu, O., Cuesta, A. and Alonso, V. (2013), "A real-time stochastic evacuation model for road tunnels", Safety Sci., 52, 73-80. https://doi.org/10.1016/j.ssci.2012.02.006
- Cheliyan, A.S. and Bhattacharyya, S.K. (2018), "Fuzzy event tree analysis for quantified risk assessment due to oil and gas leakage in offshore installations", Ocean Syst. Eng., 8(1), 41-55. https://doi.org/10.12989/OSE.2018.8.1.041
- Fellendorf, M. (1994), VISSIM: A microscopic Simulation Tool to Evaluate Actuated Signal Control including Bus Priority, 64th ITE Annual Meeting, Dallas, Technical paper.
- Ferdous, R., Khan, F.I., Veitch, B. and Amyotte, P.R. (2007), "Methodology for computer-aided fault tree analysis", Trans IChemE, Part B, Process safety and environmental protection, 85 (1), 70-80. https://doi.org/10.1205/psep06002
- Fouladgar, M.M., Yazdani-Chamzini, A. and Zavadskas, E.K. (2012), "Risk evaluation of tunneling projects", Arch. Civil Mech. Eng., 12(1), 1-12. https://doi.org/10.1016/j.acme.2012.03.008
- FSV (Forschungsgesellschaft StraBe - Schiene - Verkehr) (2008), Tunnel Safety - Tunnel Risk Model, FSV (O sterreichische Forschungsgesellschaft StraBe - Schiene - Verkehr), RVS 09.03.11.
- Goerland, F. and Reniers G. (2018), "Prediction in a risk analysis context: Implications for selecting a risk perspective in practical applications", Safety Sci., 101, 344-351. https://doi.org/10.1016/j.ssci.2017.09.007
- Hua, G.Y., Wang, W., Zhao, Y.H. and Li, L. (2011), "A study of an optimal smoke control strategy for an Urban Traffic Link Tunnel fire", Tunn. Undergr. Sp. Tech., 26, 336-344. https://doi.org/10.1016/j.tust.2010.11.004
- Jin, N.G., Tang, L., Fu , C.Q. and Jin, X.Y. (2009), "Risk analysis of tunnel lining using fault tree theory and entropy measurement", Proceedings of the 2009 WRI World Congress on Computer Science and Information Engineering,.
- Kazaras, K., Kirytopoulos, K. and Rentizelas, A. (2012), "Introducing the STAMP method in road tunnel safety assessment", Safety Sci., 50(9), 1806-1817. https://doi.org/10.1016/j.ssci.2012.04.013
- Kohl, B. et al. (2010), Current practice for risk evaluation for road tunnel users, Technical report "Risk Evaluation", WG2, PIARC,, 72.
- Li, H.N., Yi, T.H., Ren, L., Li, D.S. and Huo, L.S. (2014), "Reviews on innovations and applications in structural health monitoring for infrastructures", Struct. Monit. Maint., 1(1), 1-45. https://doi.org/10.12989/SMM.2014.1.1.001
- Migoya, E., Crespo, A., Garecia, J. and Hernandez, J. (2009), "A simplified model of fires in road tunnels. Comparison with three-dimensional models and full-scale measurements", Tunn. Undergr. Sp. Tech., 24, 37-52. https://doi.org/10.1016/j.tust.2008.01.006
- Nepal, J. and Chen, H.P. (2015), "Risk-based optimum repair planning of corroded reinforced concrete structures", Struct. Monit. Maint., 2 (2), 133-143. https://doi.org/10.12989/smm.2015.2.2.133
- Nilson D., Johansson M. and Frantzich, H. (2009), "Evaluation experiment in road tunnel: A study of human behavior and technical installation", Fire Safety J., 44, 458-468. https://doi.org/10.1016/j.firesaf.2008.09.009
- Pate-Cornell, M.E. (1996), "Uncertainities in risk analysis: Six levels of treatment", Reliab. Eng. Syst. Safe., 54, 95-111. https://doi.org/10.1016/S0951-8320(96)00067-1
- Persson, M. (2002), "Quantitative risk analysis procedure for the fire evacuation of the road tunnel", Department of Fire Safety Engineering, Lund University, Report 5096.
- Persson, M. (2002), "Quantitative risk analysis procedures for the fire evacuation of the road tunnel", Department of Fire Safety Engineering, Lund University, Report 5096, Lund 2002.
- PIARC, 2012. Risk evaluation, current practice for risk evaluation for road tunnels, PIARC, Technical committee C.4.
- Pribyl, O., Pribyl, P. and THorak, T. (2017), "System for deterministic risk assessment in road tunnels", Procedia Eng., 192, 336-341. https://doi.org/10.1016/j.proeng.2017.06.058
- Pribyl, P. and Pribyl, O. (2017), "Calibration of fuzzy model estimating fire response time in a tunnel", Tunn. Undergr. Sp. Tech., 69, 28-36. https://doi.org/10.1016/j.tust.2017.06.009
- Pribyl, P., and Pribyl, O. (2014), "Effect of tunnel technological systems on evacuation time", Tunn. Undergr. Sp. Tech., 44, 88-96. https://doi.org/10.1016/j.tust.2014.07.014
- Qu, X., Meng, Q., Yuanita, V. and Wong, Y.H. (2011), "Design and implementation of a quantitative risk assessment software tool for Singapore road tunnels", Expert Syst. Appl., 38 (11), 13827-13834.
- Radu, L.D. (2009), Qualitative, Semi-Quantitative And, Quantitative Methods For Risk Assessment: Case Of The Financial Audit, Analele Stiintifice ale Universitatii "Alexandru Ioan Cuza", din Iasi - Stiinte Economice, Alexandru Ioan Cuza University, Faculty of Economics and Business Administration, 56, 643-657.
- Ronchi, E. and Colona, P. (2012), "The evaluation of different evacuation models for assessing road tunnel safety measures", Tunn. Undergr. Sp. Tech., 30, 74-84. https://doi.org/10.1016/j.tust.2012.02.008
- Ronchi, E., Pasquale, C. et al. (2012), "The evaluation of different evacuation models for assessing road tunnel safety analysis", Tunn. Undergr. Sp. Tech., 30, 74-84. https://doi.org/10.1016/j.tust.2012.02.008
- Saidallah, M., Fergougui, A. and Elalaoui, A. (2016), "A comparative study of urban road traffic simulators", MATEC Web of Conferences, 81.
- Sjoberg, L. (2000), "Factors in risk perception", Risk Anal., 20(1), 1-11. https://doi.org/10.1111/0272-4332.00001
- Sousa, N., Coutinho-Rodrigues, J. and Natividade-Jesus, E. (2017), "Sidewalk infrastructure assessment using a multicriteria methodology for maintenance planning", J. Infrastruct. Syst., 23(4).
- Weidmann, U. (1992), Transporttechnik der FuBganger, Schriftenreihe des IVT 90, Zurich.
- Wijngaarden, S.J. and Verhave, J.A. (2006), "Prediction of speech intelligibility for public adress systems in traffic tunnels", Appl. Acoust., 67, 306-323. https://doi.org/10.1016/j.apacoust.2005.07.001
- Xu, Z.S (2011), "Analysis of road tunnel fire risk based on fuzzy fault tree method", Proceedings of the 2011 International Conference on Electric Information and Control Engineering, IEEE.