Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -

소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 -

  • Received : 2018.06.01
  • Accepted : 2018.06.04
  • Published : 2018.06.30

Abstract

The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.

Keywords

References

  1. AEC Magazine (2013), Tekla Structure 19, http://www.aecmag.com/software-mainmenu-32/563-tekla-structures-19.
  2. Bae, K. J. (2001), A Study on the Criterion Establishment of LOD (Level of Detail) for BIM Model, pp.1-6.
  3. Building Construction Technology, Kimoondang, 2010, pp.530-535.
  4. Clive, Robinson. (2007), Structural BIM: Discussion, Case Studies And Latest Developments, pp.526-530.
  5. Joo, S. U., Kim, C. K., Kim, S. U., & Noh, J. O. (2017), BIM- Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures, pp.567-568.
  6. Kang, T. W., Kim. J. E., & Jung. T. S. (2016), Study on 3D Reverse Engineering-based MEP Facility Management Improvement Method, pp.40-41.
  7. Kim, K. S., Hyun, C. T., Hong, T. H., Jo, S. M., & Mun, H. S. (2010), Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects, pp.81-83.
  8. Kim, M, J., Lee, K. H., Kwon, S. H., Park, S. I. & Lee, S. C. (2014), BIM application case study of civil infrastructure Industry, pp.6-8.
  9. Kim, S. H., Mun, K. J., Woo, Y. M., Koo, K. J., & Hyun, C. T. (2006), Application of Selective Construction Management Services to Private Small-Medium Construction Projects, pp.306-400.
  10. Kim, W. G., (2018), A Case Study on the Effect of Direct Labor Costs by Work Type on Construction Cost in Small-Scale Construction Project, pp.9.
  11. Kim, Y, H., Lee, J. H., Oh, J. K., & Kim, J. J. (2013), A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM, pp.23-25.
  12. Lee, D. U., & Yun. S. H. (2017), Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project, pp.81-82.
  13. Lee, H. J. (2015), A Case Study on Effective Ways to Apply BIM(Building Information Modeling) CM(Construction Management) of Mega Project Sizing-International Airport Construction, pp.3-6.
  14. Lee, J. C. (2014), Implementation of customized 4D and 5D System based on BIM, pp.55-61.
  15. Lim, C. H. (2017), Application of 3D Information to Reduce Rework in a Steel Structure Construction, pp.1-6.
  16. Park, C. S., & Kim, J. W. (2003), A Study on the Success Factors Impacting on the Small Construction Projects, pp.67-70.
  17. Park, C. S., & Park, H. T. (2010), Improving Contractibility Analysis Tasks by Applying BIM Technology, pp.141.
  18. Shim, S. H., & Yoo, S. R. (2001), A Study on the Potentials and Prospects of Steel Framed Building Industry in Korea, pp.3-4.
  19. Song, J. W., Pyo, Y. M., Park, S. H., & Lee, S. B. (2004), A Study on Estimating the Contingency Cost of Small Construct Project, pp.113-115.
  20. Syed Firoz, S. Kanakambara Rao. (2012), Modelling Concept of Sustainable Steel Building by Tekla Software, pp.19-23.
  21. U.S. Construction Industry Institute, CII. (1991), Manual for Special Project Management.
  22. Yo, J. E., Korea Construction News, 2014. 03. 24, http://www.conslove.co.kr/news/articleView.html?idxno=35828.
  23. Yoon, Y, S. (2005), Development of the Schedule Risk Management System for Building Construction Processes, pp.37-38.

Cited by

  1. Productivity Analysis of Documentation Based on 3D Model in Plant Facility Construction Project vol.10, pp.3, 2018, https://doi.org/10.3390/app10031126