과제정보
연구 과제 주관 기관 : 중소기업청
참고문헌
- Jang, G. (2014). Improvement of Cost-Schedule integration using BIM based on Progress Management through PMIS, Thesis, Gachon University.
- Kim, H., Choi, J., & Kim, I. (2013). A Methodology of Open BIM-Based Quantity Take-off for Schematic Estimation of Frame Work in Super-Tall Buildings. Journal of Architectural Institute of Korea, 29(5), 31-38
- Lee, J.(2016). Implementation of Customized 4D and 5D System based on BIM. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 55-61 https://doi.org/10.5762/KAIS.2016.17.8.55
- Kim, H., & Kang, I.(2016). Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost. Journal of Construction Engineering and Management, 17(5), 54-61
- Oh, K., Park, S., & Song, J. (2016). A Study on the Using of BIM Data and Template for Construction Progress Management. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 157-163 https://doi.org/10.5762/KAIS.2016.17.8.157
- Park, S., Oh, K., & Song, J. (2015). A study on the Information for the Schedule Management of the Construction based BIM. Journal of Digital Contents Society, 16(4), 555-564 https://doi.org/10.9728/dcs.2015.16.4.555
- Lee, D., Cha, H., Kim, K., & Shin, D. (2015). Development of BIM-based Construction Document Information Database Information Database Structure through the Link to the BIM Model and Construction Document Information. Journal of Construction Engineering and Management, 16(5), 42-53
- Yoon, Y., Suh, S., Jang, G., & Choi, J. (2013). Improvement of Cost-Schedule integration based Progress Management through PMIS. Journal of Construction Engineering and Management, 14(5), 144-152
- Jung, J., & Chin, S. (2011). A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase. Journal of Construction Engineering and Management, 12(5), 23-34
- Lee, M., Lee, S., & Ock, J. (2011). A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information. Transaction of the Society of CAD/CAM Engineers, 16(2), 114-125
- Yoon, Y., Suk, S., Park, M., & Jang, M., (2008). Construction Process based Schedule Risk Management System. Journal of Construction Engineering and Management, 9(4), 101-110
- Lee, J., & Lee, G., (2013). About RTS-SAREK Program works through the BIM data extraction. The magazine of the Society of Air-conditioning Refrigeration Engineer of Korea, 42(4), 50-58
- Wang, X., Yung, P., Luo, H., & Truijens, M.(2014). "An innovative method for project control in LNG porject through 5D CAD:A case study." Automation in Constuction 45, pp.126-135 https://doi.org/10.1016/j.autcon.2014.05.011
- Ding, L., Zhou, Y., & Akinci, R.(2014). "Building Information Modeling(BIM) application framework:The process of expanding from 3D to computable nD." Automation in Constuction 46, pp.82-93 https://doi.org/10.1016/j.autcon.2014.04.009