References
- J. H. Lee, J. M. Yu and D. H. Lee, "A tabu search algorithm for unrelated parallel machine scheduling with sequenceand machine-dependent setups: minimizing total tardiness, " Intl. J. of Adv. Manuf. Tech., 2013.
- K. Lee, J. Y.-T. Leung and M. L. Pinedo, " Makespan minimization in online scheduling with machine eligibility," Ann. Ope. res., vol. 204, pp. 189-222, 2013. https://doi.org/10.1007/s10479-012-1271-6
- X. Xie, H. Zhou, Y. Li, and Y. Zheng, "Scheduling Parallel Machines with a Single Server,"IEEE Intl. Conf. on MIC, pp. 453-456, 2012.
- K. Chong, "An efficient algorithm for scheduling parallel machines with multiple servers," Journal of the Korea Society of Computer Information, vol. 19, no. 6, pp. 101-108, 2014. https://doi.org/10.9708/JKSCI.2014.19.6.101
- A. H. Abdekhodaee and A. Wirth, "Scheduling parallel machines with a single server: some solvable cases and heuristics," Computers and Operation Research 29, pp. 295-315, 2002. https://doi.org/10.1016/S0305-0548(00)00074-5
- A. H. Abdekhodaee, A. Wirth and H. S. Gan, "Equal processing and equal setup time cases of scheduling parallel machines with a single server," Computers and Operation Research 31, pp. 1867-1889, 2004. https://doi.org/10.1016/S0305-0548(03)00144-8
- A. H. Abdekhodaee, A. Wirth and H. S. Gan, "Scheduling parallel machines with a single server: the general case," Computers and Operation Research 33, pp. 994-1009, 2006. https://doi.org/10.1016/j.cor.2004.08.013
- H. S. Gan, A. Wirth and A. H. Abdekhodaee, "A branch-and-price algorithm for scheduling parallel machines with a single server," Computers and Operation Research 39, pp. 2242-2247, 2012. https://doi.org/10.1016/j.cor.2011.11.007
- F. Werner and S. A. Kravchenko, "Parallel Machine Scheduling with a Single Server," Mathematics and Computer Modelling, vol. 26, pp. 1-11, 1997.
- N. G. Hall, C. N. Potts and C. Sriskandarajah, "Parallel machine scheduling with a common server,"Discrete Applied Mathematics, vol. 102, pp. 223-243, 2000. https://doi.org/10.1016/S0166-218X(99)00206-1
- P. Brucker, C. Dhaenens-Flipo, S. Knust, S. A. Kravchchenko, and F. Werner, "Complexity results for parallel machine problems with a single server," J. of Scheduling, vol. 5, pp. 429-457, 2002. https://doi.org/10.1002/jos.120
- J. Hu, Q. Jhang, J. Dong, and Y. Jiang, "Parallel Machine Scheduling with a Single Server: Loading and Unloading," LNCS 8287, pp. 106-116, 2013.
- X. Xie, Y. Li, and Y. Zheng, "Scheduling Parallel Machines with a Single Server: a Dedicated Case," Fifth Intl. Joint Conf. on Computational Science and Optimization, pp. 146-149, 2012.
- J. Ou, X. Qi, and C. Y. Lee, "Parallel Machine Scheduling with Multiple Unloading Servers," J. of Scheduling, vol. 13, no. 3 pp. 213-226, 2009. https://doi.org/10.1007/s10951-009-0104-1
- F. Werner and S. A. Kravchenko, "Scheduling with Multiple Servers," Automation and Remote Control, vol. 71, no. 10, pp. 2109-2121, 2010. https://doi.org/10.1134/S0005117910100103
- C. Wu, L. Wang and X. Zheng, "An effective estimation of distribution algorithm for solving uniform parallel machine scheduling problem with precedence constraints," 2016 IEEE Congress on Evolutionary Computation (CEC), pp. 2626 - 2632, 2016.
- M.-A. Hassan, I. Kacem, S. Martin and I. M. Osman, "Valid inequalities for unrelated parallel machines scheduling with precedence constraints," International Conference on Control, Decision and Information Technologies (CoDIT) pp. 677-682, 2016.
- K. Abdellafou and Q. Korbaa, "Makespan minimization for two parallel machines with unavailability constraints," IEEE International Conference on Systems, Man, and Cybernetics (SMC), pp. 601-606, 2016.
- Z. Xu, A. Liu and Q. Wang, "Mixed 0-1 programming model for three parallel machines scheduling problem with machine-dependent unavailable constraints," 13th International Conference on Service Systems and Service Management (ICSSSM), pp. 1-4, 2016.
- J. He, Q. Li and D. Xu, "Scheduling two parallel machines with maintenance-dependent availabilities," Computer and Operation Research 72, pp. 13-42, 2016.
- L. Y. Wang, X. Huang, P. Ji and E. M. Feng, "Unrelated parallel machine scheduling with deteriorating maintenance activities to minimize the total completion time ," Optim. Letters, 2012.
- C. W. Lin, Y. K. Lin and H. T. Hsieh, "Ant colony optimization for unrelated parallel machine scheduling," Intl. J. of Adv. Manuf. Tech., 2013.
- V. Kayvanfar, E. Teymourian and K. Alizadeh, " Intelligent water drops algorithm on parallel machines scheduling," International Conference on Industrial Engineering and Operations Management (IEOM) pp. 1-5, 2015.
- C. P. Koulamas, "Scheduling two parallel semiautomatic machines to minimize machine interference," Computers and operation Research, vol. 23, no. 10, pp.945-956, 1996. https://doi.org/10.1016/0305-0548(96)00011-1