참고문헌
- AIA, AIA TAP BIM AWARDS, 2005- 2016, http://www.aia.org/aia-architects (Oct, 05, 2016)
- AIA California Council, Integrated Project Deliver: A Guide 2007 version 1, 2007.
- AIA, AIA Document E202TM-2008, 2008, http://www.durhamnc.gov/agendas_new/2015/cm20150302/10290_CONTRACT_E202_CONTRACT_ATTACHMENT__365760_627078.PDF, (Feb, 12, 2017)
- Autodesk BIM Awards, 2014, http://www.autodeskbimaward. com/winnders.jsp (Oct, 21, 2016)
- Bedrick, J. (2008). Organizing the Development of a Building Information Model, The American Institute of Architects, 9.
- BIM in Practice, 2013, pp. 162-172.
- Bryde, D., Broquetas, M., Volm, J. M. (2013). The Project Benefits of Building Information Modeling (BIM), International Journal of Project Management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
- BuildingSmart Korea BIM Award Gallery, 2005-2015, http://www. buildingsmart.or.kr/Awards/Gallery/Gallery.aspx?select=102 &idx=5, (Sep, 02, 2016)
- BuildingSmart Korea, The BIM spring 2009, Vol. 2, pp. 26-31.
- BuildingSmart Korea, The BIM winter 2009-2010, Vol. 3, pp. 24-36.
- BuildingSmart Korea, The BIM autumn 2010, Vol. 4, pp. 27-29.
- BuildingSmart Korea, The BIM summer 2011, Vol. 5, pp. 30-32., 37-39.
- BuildingSmart Korea, The BIM summer 2012, Vol. 6, pp. 36-37.
- BuildingSmart Korea, The BIM winter 2012, Vol. 7, pp. 38-40., 44-47.
- BuildingSmart Korea, The BIM winter 2013, Vol. 10, pp. 12-17., 20-22., 25-29., 32-33.
- BuildingSmart Korea, The BIM winter 2014, Vol. 12, pp. 32-33., 38-41.
- BuildingSmart Korea, The BIM winter 2014, Vol. 12, pp. 48-51.
- BuildingSmart Korea, The BIM spring 2015, Vol. 13, pp. 28-31.
- BuildingSmart Korea, The BIM winter 2015, Vol. 14, pp. 24-27.
- Cho, S., Cho, Y., Lee, K. H., Paek, J. H. (2009). Application of BIM in Public Construction Project : Focused on Delivery System, The Korea Institute of Building Construction, 15(4), pp. 93-99.
- Cho, H. J., Kim, Y. S., Ma, Y. K. (2013). A Study of LOD(Level of Detail) for BIM Model Applied the Design Process, Journal of KIBIM, 3(1), pp. 1-10. https://doi.org/10.13161/KIBIM.2013.3.1.001
- Computer Integrated Construction Research Program. "BIM Project Execution Planning Guide - Version 2.1." May, The Pennsylvania State University, University Park, PA, USA., 2011.
- Fallon, K. K., Palmer, M. E. (2008). General Buildings Information Handover Quide, Principles, Methodology and Case Studies (NISTIR 7417), August.
- Halttula, H., Aapaoja, A., Haapasalo, H. (2015). The Contemporaneous Use of Building Information Modeling and Relational Project Delivery Arrangements, Procedia Economics and Finance, 21, pp. 532-539. https://doi.org/10.1016/S2212-5671(15)00209-9
- Hergunsel, M. F. (2011). Benefits of Building Information Modeling for Construction Managers and BIM based Scheduling, Diss. Worcester Polytechnic Institute, pp. 1-95.
- Jang, C. G., Lee, B. N., Choi, S. I., Lee, D. G. (2006). Understanding CM at Risk and Diagnose Introduction Possibility, Construction Economy Research Institute of Korea, 2006(5), pp. 1-130.
- Jang, M. W., Shim, U. J., Ahn, Y. S. (2013). A Study on the Solution of Focused Restraints for Introduction of IPD for BIM Efficient Utilization in Domestic Construction Industry, The Korea Institute of Building Construction, 9(1), pp. 203-207.
- Jo, Y. H., Lee, J. S., H, N. H. (2016). BIM Strategy Plan through Domestic Construction Companies BIM Project Case Analysis ; foucsed on the BIM Use of the project from 2009 to 2015, Journal of KIBIM, 6(2), pp. 1-11. https://doi.org/10.13161/KIBIM.2016.6.2.001
- KIBIM Magazine, Vol. 1 First Issue spring 2011, Vol. 1, pp. 24-26.
- KIBIM Magazine, Vol. 1 Second Issue winter 2011, Vol. 1, pp. 52-60., 66-71.
- KIBIM Magazine, Vol. 3 First Issue spring 2013, Vol. 3, pp. 34-37.
- KIBIM Magazine, Vol.3 Second Issue summer 2013, Vol. 3, pp. 32-37.
- KIBIM Magazine, Vol.3 Third Issue autumn 2013, Vol. 3, pp. 19-23.
- KIBIM Magazine, Vol. 3 Fourth Issue winter 2013, Vol. 3, pp. 20-26., 38-43.
- KIBIM Magazine, Vol. 4 First Issue spring 2014, Vol. 4, pp. 48-63.
- KIBIM Magazine, Vol. 4 Second Issue summer 2014, Vol. 4, pp. 36-42.
- KIBIM Magazine, Vol.4 Fourth Issue winter 2014, Vol. 4, pp. 47-57.
- KIBIM Magazine, Vol.5 First Issue spring 2015, Vol. 5, pp. 23-34.
- KIBIM Magazine, Vol. 5 Second Issue sumer 2015, Vol. 5, pp. 49-58.
- KIBIM Magazine, Vol. 6 First Issue spring 2016, Vol. 6, pp. 38-44.
- Kim, Y. S. (2010). New Paradigm of Project Delivery System for BIM Based Construction Projects ; Integrated Project Delivery (IPD) System, Journal of the Architecture Institute of Korea, 54(1), pp. 37-40.
- Kim, U. Y. (2017). CM at Risk Introduction Plan to Domestic Public Sector, Journal of the Architecture Institute of Korea, 61(5), pp. 34-38.
- Korean Institute of Building Information Modeling, http://www.kibim.or.kr/Board/board.asp?b_code=393&Action =content&GotoPage=1&B_CATE=BBS1 (2017. 03. 24).
- Kreider, R., Messner, J., Dubler, C. (2010). Determining the Frequency and Impact of applying BIM for Different Purposes on Projects, Proceedings 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), pp. 1-10.
- Lee, J. S., Ham, N. H., K, J. J. (2015). A Study about BIM Execution Plan for Specialty Contractors at Construction Phase ; focused on Specialty Contractors in Reinforced Concrete Works, Journal of KIBIM, 5(3), pp. 19-32. https://doi.org/10.13161/KIBIM.2015.5.3.019
- McCuen, T. L., Suermann, P. C., Krogulecki, M. J. (2011). Evaluating Award-winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model, Journal of Management in Engineering, 28(2), pp. 224-230. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000062
- Messner J., 2009. "BIM Project Execution Planning" May, AGC BIM Forum Presentation, http://bimforum.org/wp-content/uploads/presentations/philly-october-2009/Messner_AGC_BIMForum_Presentation.pdf
- Ministry of Land, Infrastructure and Transport, http://www.molit.go.kr/USR/NEWS/m_71/dtl.jsp?id=95077914 (2016. 08. 23).
- Yoon, S. W., Kim, S. A., Choi, J. M., Keum, D. Y., Jo, C. W. (2015). A Proposal for Using BIM Model Created in Design to Construction Phase ; Case Study on preconstruction adopting BIM, Journal of KIBIM, 5(4), pp. 1-10. https://doi.org/10.13161/KIBIM.2015.5.4.001
피인용 문헌
- BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea vol.2019, pp.None, 2017, https://doi.org/10.1155/2019/4163625
- BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 - vol.9, pp.4, 2017, https://doi.org/10.13161/kibim.2019.9.4.010