참고문헌
- Barlow, R. and Hunter, L. (1960). "Optimum Preventive Maintenance Policies." Operations Research, Vol. 8, No. 1, pp. 90-100. https://doi.org/10.1287/opre.8.1.90
- Beichelt, F. (1993). "A Unifying Treatment of Replacement Policies with Minimal Repair." Naval Research Logistics, Vol. 40, No. 1, pp. 51-67. https://doi.org/10.1002/1520-6750(199302)40:1<51::AID-NAV3220400104>3.0.CO;2-V
- Gibbons, D. I. and Vance, L. C. (1981). "A Simulation Study of Estimators for the 2-parameter Weibull Distribution." IEEE Transactions on Reliability, Vol. 30, No. 1, pp. 61-66.
- Sinha, S. K. and Sloan, J. A. (1988). "Bayes Estimation of the Parameters and Reliability Function for the 3 parameter Weibull Distribution." IEEE Transactions on Reliability, Vol. 37, No. 4, pp. 364-369. https://doi.org/10.1109/24.9840
- Wilson, J. G. and Benmerzouga, A. (1995). "Bayesian Group Replacement Policies." Operations Research, Vol. 43, No. 3, pp. 471-476. https://doi.org/10.1287/opre.43.3.471
- Bassin, W. (1973). "A Bayesian Optimal Overhaul Interval Model for the Weibull Restoration process." Journal of the American Statistical Association, Vol. 68, No. 343, pp. 575-578. https://doi.org/10.1080/01621459.1973.10481384
- Boland, P. J. (1982). "Periodic Replacement When Minimal Repair Costs Vary with Time." Naval Research Logistics, Vol. 29, No. 4, pp. 541-546. https://doi.org/10.1002/nav.3800290402
- Mazzuchi, T. A. and Soyer, R. (1996). "A Bayesian Perspective on Some Replacement Strategies." Reliability Engineering and System Safety, Vol. 51, No. 3, pp. 295-303. https://doi.org/10.1016/0951-8320(95)00077-1
- Sheu et al. (1999). "A Bayesian Perspective on Age Replacement with Minimal Repair." Reliability Engineering and System Safety, Vol. 65, No. 1, pp. 55-64. https://doi.org/10.1016/S0951-8320(98)00087-8
- Jung, K. M. and Han, S. S. (2006). "A Bayesian Approach to Replacement Policy Based on Cost and Downtime." Journal of Korean Data & Information Science Society, Vol. 17, No. 3, pp. 743-752.
- Soland, R. M. (1969). "Bayesian Analysis of the Weibull Process with Unknown Scale and Shape Parameters." IEEE Transactions on Reliability, Vol. 18, No. 4, pp. 181-184.
- Sathe, P. T. and Hancock, W. M. (1973). "A Bayesian Approach to the Scheduling of Preventive Maintenance." IIE Transactions, Vol. 5, No. 2, pp. 172-179.
- Jiang, R. and Ji, P. (2002). "Age Replacement Policy: a Multi-attribute Value Model." Reliability Engineering and System Safety, Vol. 76, No. 3, pp. 311-318. https://doi.org/10.1016/S0951-8320(02)00021-2
- Soliman et al. (2012). "Modified Weibull model: A Bayes Study Using MCMC Approach Based on Progressive Censoring Data." Reliability Engineering and System Safety, Vol. 100, pp. 48-57. https://doi.org/10.1016/j.ress.2011.12.013