DOI QR코드

DOI QR Code

내역항목 구성체계의 개선을 위한 교육시설 내역서 분석 사례 연구

A Case Study on the Educational Facility Project for the Improvement of Work Item's Structure in BoQ

  • 투고 : 2017.02.24
  • 심사 : 2017.07.14
  • 발행 : 2017.08.30

초록

BoQ(Bill of Quantities) has been commonly used for the cost estimation in construction project. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

키워드

과제정보

연구 과제 주관 기관 : 한국연구재단

참고문헌

  1. Cho, H., Kang, T., Lee, Y., & Cho, M. (1999). A Study on the Reformation of the BoQ Structure for Public Building Projects in Korea, Journal of the Architectural Institute of Korea, Structure & Construction Section, 15(9), 123-131.
  2. Choi, S., Song, B., & Kim, Y. (2004). An Assessment and Improvement scheme of a New Cost Estimation System in Korean Public Construction Industry, Construction & Economy Research Institute of Korea.
  3. Hyun, S., Kim, G., Park, M., & Choi, S. (2012). A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field, The Transaction of the Korean Institute of Electrical Engineers, 61(1), 173-178. https://doi.org/10.5370/KIEE.2012.61.1.173
  4. Jeong, S. (2010). A Study on the Construction of Text Recognition System for Accumulating Unit Cost of Construction Statement in the Construction Field, Dept. of Computer Software, Master Dissertation, Chung-Ang University.
  5. Jun, K. (2013). A study on Improvement of BIM based preliminary estimate using combination DB of the building element types, Dept. of Architectural Engineering, Master Dissertation, Gyeongsang National University.
  6. Lee, Y. (2002). A Time and Cost Interation Planning Model in Building Construction through the Analysis of Significant Items, Dept. of Architectural Engineering, Ph. D. Dissertation, Kyung-Hee University.
  7. Lee, Y. (2015). Budget Price Policy, The Magazine of the Korean Society of Civil Engineers, 63(1), 78-84.
  8. Li, Q., & Tian, Z. (2014). Construction project cost management under the mode of bill of quantities, In Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, 769-780.
  9. Martinez-Rojas, M., Marin, N., & Miranda, M. A. V. (2016). An intelligent system for the acquisition and management of information from bill of quantities in building projects, Expert Systems with Applications, 63, 284-294. https://doi.org/10.1016/j.eswa.2016.07.011
  10. Song, A., Kang, K., & Yun, S. (2015). Improvement of Quantity Take-Off and BOQ Information through the PBS based QDB System, Journal of the Architectural Institute of Korea, Structure & Construction Section, 31(2), 73-78.
  11. Yun, S. (2010). A Study on the Standardized Cost Code System for BoQ for Efficiency of Cost Management in Public Construction, Journal of the Architectural Institute of Korea, Structure & Construction Section, 26(12), 167-174.
  12. Zhang, H. Q., & Zhang, X. J. (2008). Analysis on price adjustment coefficient of unbalanced bid model under the pricing pattern of Bill of Quantities, In Management Science and Engineering, 15th Annual Conference Proceedings, 1720-1725.