• 제목/요약/키워드: Bill of Quantities(BoQ)

검색결과 5건 처리시간 0.017초

건축공사 내역서 세부항목 구성에 대한 사례연구 (A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities)

  • 노혜라;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구 (Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models)

  • 최현준;윤석헌
    • 한국건설관리학회논문집
    • /
    • 제20권6호
    • /
    • pp.89-97
    • /
    • 2019
  • 최근 건설프로젝트에서 BIM의 도입이 활발히 이루어지고 있다. 특히 견적단계에서의 BIM의 도입은 공사비 예측의 정확성 향상 및 견적자의 업무를 절감할 수 있는 효과가 기대된다. 하지만 현재의 물량산출 과정과 내역서 작성과정은 상당부분 수작업으로 이루어지고 있다. 또 현행 내역서의 내역항목을 만족시키기 위해서는 BIM 모델이 매우 상세해져야 하는 문제점이 있다. 이에 본 연구는 LOD기준을 분석하여 BIM 모델의 표현 수준에 따라 산출될 수 있는 내역항목을 도출함으로써 현행 내역서의 개선방향을 BIM 모델의 LOD 측면에서 도모하고자 한다. LOD기반 내역항목 분석을 위해 내역항목 등급을 A,B,C등급으로 나누었다. 따라서 본 연구에서는 실시설계 단계에서 LOD 수준 따라 산출될 수 있는 내역항목의 수와 해당항목이 차지하는 금액 비율을 각 공종별로 검토하였다. 실시설계 단계에서 주요 개선 등급인 B등급에서 가장 많은 항목을 차지한 공종은 창호 및 유리공사이며, 가장 많은 금액을 차지한 공종은 철근콘크리트 공사로 분석되었다. 추후 항목비율이 높은항목과 금액비율이 높은항목별 적절한 개선방안제시가 필요할 것으로 판단된다. 본 연구의 결과는 BIM 견적이나 현행 내역서 체계 개선을 위한 기초자료로서의 역할을 기대 할 수 있을 것으로 판단된다.

코스트 중요항목 분석을 통한 공사비 예측모델 연구 (Development of Construction Cost Model through the Analysis of Critical Work Items)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.212-219
    • /
    • 2003
  • 건설공사에서 공사비 계획 및 관리를 위한 코스트 모델은 공사입찰$\cdot$계약단계에서 도급공사비 결정에 중요한 기능을 담당할 뿐만 아니라 건설사업 수행 전 단계에 걸쳐 건설공사에 소요될 비용을 추적, 관리하여 주어진 예산범위 내에서 최적의 목적물을 설계 시공하여 궁극적으로 발주자의 투자비용에 대한 가치를 극대화하고 비용관리업무의 적정성을 도모하는 기능을 담당하고 있다. 그동안 내역입찰방식을 널리 채택하고 있는 건설공사에서 내역서는 공사비 예측 및 계획 등 공사관리에 있어서 중요한 수단으로 활용하여 왔으나, 현행 내역모델은 공사비의 예측 및 비용관리 측면에서 지나치게 상세하며, 공사계획 및 관리 업무와 연계시키는데도 한계가 있는 것으로 지적되고 있다. 건설공사를 구성하는 세부 단위작업에 소요되는 비용은 모두 중요한 관리대상이지만, 단위작업의 내용에 따라 비용이 차지하는 비중과 코스트 결정에 미치는 영향력에는 차이가 있다. 이러한 비용결정의 구조적 메커니즘에 착안하여 본 연구에서는 건설공사 비용결정에 중요한 영향을 미치는 작업내용을 규명하여 정확성을 유지하면서 단순 간결한 코스트 예측모델을 제안 및 검증하는 것을 목적으로 하고 있다.