Abstract
In order to develop test and performance analysis techniques for a CRP propulsion, a CRP dynamometer which can be installed inside the model ship was designed and manufactured. The object ship was the 16000TEU container carrier, which has test results for the single propeller. The design concept of the present CRP is that forward & after propellers have the same power ratio and their RPM ratio is 0.75:1. To begin with, we checked the performance of the CRP dynamometer through the calibration and then installed it inside the model ship. After the model ship setup including the design CRP and the rudder in the Large Cavitation Tunnel(LCT), a series of model tests composed of power ratio check, propeller behind wake(PBW) test, cavitation observation and pressure fluctuation tests was conducted. Through the model test and data analysis for CRP, the experimental technique was established and the improved method for CRP design was suggested.