초록

Machines are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. Under the process mean shift, production cost, failure cost and quality loss function cost are increasing continuously. Therefore a periodic preventive resetting the process is necessary. We suppose that the wear level is observable. In this case, process mean shift problem has similar characteristics to the maintenance policy model. In the previous studies, process mean shift problem has been studied in several fields such as 'Tool wear limit', 'Canning Process' and 'Quality Loss Function' separately or partially integrated form. This paper proposes an integrated cost model which involves production cost by the material, failure cost by the nonconforming items, quality loss function cost by the deviation between the quality characteristics from the target value and resetting the process cost. We expand this process mean shift problem a little more by dealing the process variance as a function, not a constant value. We suggested a multiplier function model to the process variance according to the analysis result with practical data. We adopted two-side specification to our model. The initial process mean is generally set somewhat above the lower specification. The objective function is total integrated costs per unit wear and independent variables are wear limit and initial setting process mean. The optimum is derived from numerical analysis because the integral form of the objective function is not possible. A numerical example is presented.

키워드

참고문헌

  1. Ahn G.H. and Jang J.S., Determination of Starting Value and the Resetting Time for a Production Process with Linear Shift in a Process Mean, Journal of the Korean Society for Quality Management, 1998, Vol. 26, No. 4, pp. 51-64.
  2. Arcelus, F.J., Banerjee, P.K., and Chandra, R., Optimal Production Run for a Normally Distributed Quality Characteristics Exhibiting Non-Negative Shifts in Process Mean and Variance, IIE Transactions, 1982, Vol. 14, No. 2, pp. 90-98. https://doi.org/10.1080/05695558208974587
  3. Barlow, R.E. and Hunter, L.C., Optimum Preventive Maintenance Policies, Operations Research, 1960, Vol. 8, No. 1, pp. 90-100. https://doi.org/10.1287/opre.8.1.90
  4. Boyles, R.A., The Taguchi Capability Index, Journal of Quality Technology, 1991, Vol. 23, No. 1, pp. 17-26. https://doi.org/10.1080/00224065.1991.11979279
  5. Chen, C.H., Determining the optimum process mean based on Asymmetric Quality Loss Function and Rectifying Inspection Plan, IEEE : Industrial Engineering Management Conference, 2004, pp. 1080-1084.
  6. Gibra, I.N., Optimal Control Processes Subject to Linear Trends, The Journal of Industrial Engineering, 1967, Vol. 18, pp. 35-41.
  7. Golhar, D.Y., Determination of the Best Mean Contents for a Canning problem, Journal of Quality Technology, 1987, Vol. 19, pp. 82-84. https://doi.org/10.1080/00224065.1987.11979042
  8. Hunter, W.G. and Kartha, C.D., Determining the Most Profitable Target Value for a Production Process, Journal of Quality Technology, 1977, Vol. 9, pp. 176-180. https://doi.org/10.1080/00224065.1977.11980794
  9. Kamat, S.J., A Smoothed Bayes Control of a Variable Quality Characteristic with Linear Shift, Journal of Quality Technology, 1976, Vol. 8, pp. 98-104. https://doi.org/10.1080/00224065.1976.11980724
  10. Kim, D.H. and Chung, Y.B., A Development of Expected Loss Control Chart Using Reflected Normal Loss Function, Journal of the Society of Korea Industrial and Systems Engineering, 2016, Vol. 39, No. 2, pp. 91-98. https://doi.org/10.11627/jkise.2016.39.1.091
  11. Lee, D.K., Determination of Wear Limit and the Initial Setting Position of Tool for a Machining Process, Journal of the Society of Korea Industrial and Systems Engineering, 1994, Vol. 17, pp. 91-98.
  12. Lee, J.H., Park, T.H., Kwon, H.M., Hong, S.H., and Lee, M.K., Optimum target values for manufacturing processes when drifting rate in the process mean is normally distributed, Journal of the Korean Society for Quality Management, 2010, Vol. 38, No. 4, pp. 98-104.
  13. Lee, M.K. and Bai, D.S., Determination of the Optimal Target Values for a Canning Process with Linear Shift in the Mean, Journal of the Korean Institute of Industrial Engineers, 1994, Vol. 20, No. 1, pp. 3-13.
  14. Makis, V., Optimal tool replacement with asymmetric quadratic loss, IIIE Transaction, 1996, Vol. 28, No. 6, pp. 463-466. https://doi.org/10.1080/07408179608966292
  15. Manuele, J., Control Chart for Determining Tool Wear, Industrial Quality Control, 1945, Vol. 1, pp. 7-10.
  16. Mun, H.J. and Chung, Y.B., A Study on Multivariate Process Capability Index using Quality Loss Function, Journal of the Society of Korea Industrial and Systems Engineering, 2001, Vol. 25, No. 2, pp.1-10.
  17. Pandit, S.M. and Wu, S.M., Time Series and System Analysis with Applications, John Wiely & Sons, 1983, pp. 307, 490-491.
  18. Park, K.S., Optimal Wear-Limit Replacement with Wear Dependent Failures, IEEE Transactions on Reliability, 1988, Vol. 37, No. 3, pp. 293-294. https://doi.org/10.1109/24.3757
  19. Quesenberry, C.P., A SPG Approach to Compensating a Tool-Wear Process, Journal of Quality Technology, 1988, Vol. 20, No. 4, pp. 220-229. https://doi.org/10.1080/00224065.1988.11979114
  20. Rahim, M.A. and Tuffaha F., Integrated Model for Determining the Optimal Initial Settings of the Process Mean and the Optimal Production Run Assuming Quadratic Loss Functions, International Journal of Production Research, 2004, Vol. 42, No. 16, pp. 3281-3300. https://doi.org/10.1080/00207540410001666233
  21. Schneider, H., Colm O'Cinneide, and Tang, K., Optimal Production Process Subject to AOQL Constraint, Naval Research Logistics Quarterly, 1988, Vol. 35, No. 3, pp. 383-396. https://doi.org/10.1002/1520-6750(198806)35:3<383::AID-NAV3220350307>3.0.CO;2-8
  22. Springer, C.H., A Method for Determining the Most Economic Position of a Process Mean, Industrial Quality Control, 1951, Vol. 8, pp. 36-39.
  23. Sule, D.R. and Harmon, B., Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines, AIIE Transactions, 1979, Vol. 11, No. 1, pp. 540-548.

피인용 문헌

  1. 생산량과 공정분산이 변하는 공정평균이동 문제의 마모한계 결정 vol.43, pp.3, 2020, https://doi.org/10.11627/jkise.2020.43.3.095
  2. 생산량이 감소하는 공정평균이동 문제에서 Cpm+ 기준의 손실함수를 적용한 보전모형 vol.44, pp.1, 2021, https://doi.org/10.11627/jkise.2021.44.1.045