Analysis on the submittal process for a small local environmental construction company: a case study

지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구

  • Lee, Do Gyun (Dept. of Civil and Environmental Engineering, Incheon National University)
  • Received : 2017.11.30
  • Accepted : 2017.12.31
  • Published : 2017.12.31

Abstract

A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

Keywords

References

  1. Damelio, R. (1996). The Basics of Process Mapping. Productivity. ISBN 0-527-76316-0
  2. East, W. E., Love, D. R. (2011). Value-added analysis of the construction submittal process, In Automation in Construction, Vol. 20, No. 8, pp.1070-1078. https://doi.org/10.1016/j.autcon.2011.04.008
  3. Mead, S. P. (2001). Developing benchmarks for construction information flows. Journal of Construction Education, Vol. , No. 3, pp.155-166.
  4. Lean Construction Institute. (October 1999). The Last Planner: Improving Reliability in Planning and Work Flow. T4 Workbook-Version 1.0, San Francisco, California, USA
  5. Gransberg, D., Molenaar, K. (2004). Analysis of owner's design and construction quality management approaches in design/build projects. Journal of Management in Engineering, Vol. 20, No. 4, pp.162-169. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(162)
  6. Chase, G. W. (1998). Improving construction methods: A story about quality. Journal of Management in Engineering, Vol. 14, No. 3, pp.30-33. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(30)
  7. Klinger, M., Susong, M. The construction project: phases, people, terms, paperwork, processes.