Acknowledgement
Supported by : Natural Science Foundation of China
References
- Avramidis, A.N., L'Ecuyer, P. and Tremblay, P.A. (2003), "Efficient simulation of gamma and variance-gamma processes", Proceedings of the 2003 Winter Simulation Conference, Piscataway, NJ, USA.
- Beck, A.T. and de Santana Gomes, W.J. (2013), "Stochastic fracture mechanics using polynomial chaos", Probabilist. Eng. Mech., 34, 26-39. https://doi.org/10.1016/j.probengmech.2013.04.002
- Berens, A. and Hovey, P. (1981), "Evaluation of NDE reliability Characterization", Report No AFWAL-TR-81-4160, Vol. 1. University of Dayton Research Institute.
- Casciati, F., Colombi, P. and Faravelli, L. (2007), "Inherent variability of an experimental crack growth curve", Struct. Saf., 29(1), 66-76. https://doi.org/10.1016/j.strusafe.2006.02.001
- Chen, H.P. and Alani, A.M. (2012), "Reliability and optimised maintenance for sea defences", Proc. ICE-Maritime Eng., 165(2), 51-64.
- Chen, H.P. and Alani, A.M. (2013), "Optimized maintenance strategy for concrete structures affected by cracking due to reinforcement corrosion", ACI Struct. J., 110(2), 229-238.
- Chen, H.P. and Huang, T.L. (2012), "Updating finite element model using dynamic perturbation method and regularization algorithm", Smart Struct. Syst., 10(4-5), 427-442. https://doi.org/10.12989/sss.2012.10.4_5.427
- Chen, H.P. and Nepal, J. (2015), "Stochastic modelling and lifecycle performance assessment of bond strength of corroded reinforcement in concrete", Struct. Eng. Mech., 54(2), 319-336. https://doi.org/10.12989/sem.2015.54.2.319
- Chen, H.P. and Xiao, N. (2015), "Symptom-based reliability analyses and performance assessment of corroded reinforced concrete structures", Struct. Eng. Mech., 53(6), 1183-1200. https://doi.org/10.12989/sem.2015.53.6.1183
- Chiquet, J., Limnios, N. and Eid, M. (2009), "Piecewise deterministic Markov processes applied to fatigue crack growth modeling", J. Stat. Plan. Infer., 139(5), 1657-1667. https://doi.org/10.1016/j.jspi.2008.05.034
- Chung, H.Y., Manuel, L. and Frank, K.H. (2006), "Optimal inspection scheduling of steel bridges using nondestructive testing techniques", J. Bridge Eng. -ASCE, 11(3), 305-319. https://doi.org/10.1061/(ASCE)1084-0702(2006)11:3(305)
- Deng, L., Wang, W. and Yu, Y. (2015), "State-of-the-art review on the causes and mechanisms of bridge collapse", J. Perform. Constr. Fac., 04015005.
- Fisher, J.W. (1984), Fatigue and fracture in steel bridges: case studies, John Wiley, New York.
- Fisher, J.W. and Roy, S. (2011), "Fatigue of steel bridge infrastructure", Struct. Infrastruct. Eng., 7(7-8), 457-475. https://doi.org/10.1080/15732479.2010.493304
- Fisher, J.W. and Roy, S. (2015), "Fatigue damage in steel bridges and extending their life", Adv. Steel Constr., 11(3), 250-268.
- Forman, R.G., Kearney, V.E. and Engle, R.M. (1967), "Numerical analysis of crack propagation in cyclic-loaded structures", J. Basic Eng., 89(3), 459-464. https://doi.org/10.1115/1.3609637
- Forsyth, D.S. and Fahr, A. (1998), "An evaluation of probability of detection statistics", RTO AVT Workshop on Airframe Inspection Reliability under Field/Depot Conditions, RTO MP-10, Brussels, Belgium.
- Frangopol, D.M. (2011), "Life-cycle performance, management, and optimisation of structural systems under uncertainty: accomplishments and challenges", Struct. Infrastruct. Eng., 7(6), 389-413. https://doi.org/10.1080/15732471003594427
- Ghonem, H. and Dore, S. (1987), "Experimental study of the constant-probability crack growth curves under constant amplitude loading", Eng. Fract. Mech., 27(1), 1-25. https://doi.org/10.1016/0013-7944(87)90002-6
- Gomes, W.J. and Beck, A.T. (2014), "Optimal inspection planning and repair under random crack propagation", Eng. Struct., 69, 285-296. https://doi.org/10.1016/j.engstruct.2014.03.021
- Guida, M. and Penta, F. (2015), "A gamma process model for the analysis of fatigue crack growth data", Eng. Fract. Mech., 142, 21-49. https://doi.org/10.1016/j.engfracmech.2015.05.027
- Huang, T.L., Zhou, H., Ren, W.X. and Chen, H.P. (2014), "Gamma process modelling and repair planning of fatigue damaged of steel bridge members", Proceedings of the 12th International Conference on Computational Structures Technology (CST 2014), Naples, Italy.
- Huang, T.L., Zhou, H., Wang, C., Ren, W.X. and Chen, H.P. (2015), "Optimization inspection and maintenance strategy for corrosive reinforced concrete girder bridges based on Gamma process", J. Central South Univ. (Natural Science), 46(5),1851-1861. (In Chinese)
- Jandu, A.S. (2008), "Inspection and maintenance of highway structures in England", Pro. ICE, Bridge Eng., 161(3), 111-114.
- Kim, S. and Frangopol, D.M. (2013), "Generalized probabilistic framework for optimum inspection and maintenance planning", J. Struct. Eng. - ASCE, 139(3), 435-447. https://doi.org/10.1061/(ASCE)ST.1943-541X.0000676
- Kwon, K. and Frangopol, D.M. (2011), "Bridge fatigue assessment and management using reliability-based crack growth and probability of detection models", Probabilist. Eng. Mech., 26(3), 471-480. https://doi.org/10.1016/j.probengmech.2011.02.001
- Lovejoy, S.C. (2003), "Determining appropriate fatigue inspection intervals for steel bridge members", J. Bridge Eng. - ASCE, 8(2), 66-72. https://doi.org/10.1061/(ASCE)1084-0702(2003)8:2(66)
- MathWorks. (2012), "Optimization toolbox Version 6.2 user's guide", MathWorks, Natick, MA.
- Mertz, D. (2012), "Steel Bridge Design Handbook: Design for Fatigue", Report No. FHWA-IF-12-052-Vol. 12.
- Miki, C. (2007), "Retrofitting engineering for steel bridge structures", International Institute of Welding.
- Paris, P.C. and Erdogan, F. (1963), "A critical analysis of crack propagation laws", J. Basic Eng., 85(4), 528-534. https://doi.org/10.1115/1.3656900
- Sobczyk, K. and Spencer, Jr, B.F. (1992), Random fatigue: from data to theory, Academic Press, New York.
- Soliman, M., Frangopol, D.M. and Kim, S. (2013), "Probabilistic optimum inspection planning of steel bridges with multiple fatigue sensitive details", Eng. Struct., 49, 996-1006. https://doi.org/10.1016/j.engstruct.2012.12.044
- Soliman, S. and Frangopol, D. (2014), "Life-Cycle Management of Fatigue-Sensitive Structures Integrating Inspection Information", J. Infrastruct. Syst., 20(2), 04014001. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000169
- Spencer, Jr. B.F., Tang, J. and Artley, M. E. (1989), "Stochastic approach to modeling fatigue crack growth", AIAA J., 27(11), 1628-1635. https://doi.org/10.2514/3.10311
- Tang, M.C. (2011), "A new concept of orthotropic steel bridge deck", Struct. Infrastruct. Eng., 7(7-8), 587-595. https://doi.org/10.1080/15732479.2010.496996
- Valdebenito, M.A. and Schueller, G.I. (2010), "Design of maintenance schedules for fatigue-prone metallic components using reliability-based optimization", Comput. Method. Appl. Mech., 199(33), 2305-2318. https://doi.org/10.1016/j.cma.2010.03.028
- Van Noortwijk, J.M. (2009), "A survey of the application of Gamma processes in maintenance", Reliab. Eng. Syst. Safe., 94(1), 2-21. https://doi.org/10.1016/j.ress.2007.03.019
- Van Noortwijk, J.M. and Frangopol, D.M. (2004), "Two probabilistic life-cycle maintenance models for deteriorating civil infrastructres", Probabilist. Eng. Mech., 19(4), 345-359. https://doi.org/10.1016/j.probengmech.2004.03.002
- Virkler, D.A., Hillberry, B. and Goel, P.K. (1979), "The statistical nature of fatigue crack propagation", J. Eng. Mater. Technol. - ASME, 101(2), 148-153. https://doi.org/10.1115/1.3443666
- Wu, W.F. and Ni, C.C. (2004), "Probabilistic models of fatigue crack propagation and their experimental verification", Probabilist. Eng. Mech., 19(3), 247-257. https://doi.org/10.1016/j.probengmech.2004.02.008
- Yang, J.N. and Manning, S.D. (1996), "A simple second order approximation for stochastic crack growth analysis", Eng. Fract. Mech., 53(5), 677-686. https://doi.org/10.1016/0013-7944(95)00130-1
- Zeng, Y., Tan, H., Sun, S., Gan, L., Liu, G. and Qu, M. (2013), "Probability-based optimization method for the fatigue maintenance strategies of steel bridge welded components", China Railway Science, 34(1), 29-34. (In Chinese)
Cited by
- Stochastic modelling fatigue crack evolution and optimum maintenance strategy for composite blades of wind turbines vol.63, pp.6, 2016, https://doi.org/10.12989/sem.2017.63.6.703
- Fatigue study on additional cutout between U shaped rib and floorbeam in orthotropic bridge deck vol.28, pp.3, 2016, https://doi.org/10.12989/scs.2018.28.3.319
- On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system vol.22, pp.2, 2018, https://doi.org/10.12989/sss.2018.22.2.151
- Reliability Based Life Cycle Management of Bridge Subjected to Fatigue Damage vol.6, pp.None, 2016, https://doi.org/10.3389/fbuil.2020.00100
- Reliability-Based Lifetime Fatigue Damage Assessment of Offshore Composite Wind Turbine Blades vol.34, pp.3, 2021, https://doi.org/10.1061/(asce)as.1943-5525.0001260