References
- Baykasoglu, A., Ozbakir, L., and SOnmez, A. I. (2004), Using multiple objective tabu search and grammars to model and solve multi-objective flexible jobshop scheduling problems, Journal of Intelligent Manufacturing, 15(6), 777-785. https://doi.org/10.1023/B:JIMS.0000042663.16199.84
- Bi, Z. M., Lang, S. Y. Y., Shen, W., and Wang, L. (2008), Recnfigurable manufacturing systems: the state of the art, International Journal of Production Research, 46(4), 967-992. https://doi.org/10.1080/00207540600905646
- Chakravarty, A. K. and Shtub, A. (1990), Production scheduling during the phased implementation of flexible manufacturing cells, IIE Transactions, 22(4), 292-298. https://doi.org/10.1080/07408179008964184
- Doh, H.-H., Yu, J.-M., Kim, J.-S., Lee, D.-H., and Nam, S.-H. (2013), A priority scheduling approach for flexible job shops with multiple process plans, International Journal of Production Research, 51(12), 3748-3764. https://doi.org/10.1080/00207543.2013.765074
- Gao, J., Sun, L., and Gen, M. (2008), A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems, Computers and Operation Research, 35(9), 2892-2907. https://doi.org/10.1016/j.cor.2007.01.001
- Gao, J., Gen, M. and Sun, L. (2006), Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm, Journal of Intelligent Manufacturing, 17(4), 493-507. https://doi.org/10.1007/s10845-005-0021-x
- He, Y. and Smith, M. L. (2007), A dynamic heuristic based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability, International Journal of Flexible Manufacturing Systems, 19(4), 392-409. https://doi.org/10.1007/s10696-008-9045-9
- Ho, Y. C. and Moodie, C. L. (1996), Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities, International Journal of Production Research, 34(10), 2901-2923. https://doi.org/10.1080/00207549608905065
- Kim, H.-W., Yu, J.-M., Kim, J.-S., Doh, H.-H., Lee, D.-H., and Nam, S.-H. (2012), Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints, International Journal of Advanced Manufacturing Technology, 58(5-8), 683-691. https://doi.org/10.1007/s00170-011-3417-0
- Kim, Y.-D., Lee, D.-H., and Yoon, C.-M. (2001), Twostage heuristic algorithms for part input sequencing in flexible manufacturing systems, European Journal of Opeartion Research, 133(3), 624-634. https://doi.org/10.1016/S0377-2217(00)00210-1
- Kim, Y.-K., Park, K., and Ko, J. (2003), A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling, Computers and Operations Research, 30(8), 1151-1171. https://doi.org/10.1016/S0305-0548(02)00063-1
- Koren, Y., Heisel, U., Jovane, F., Moriwaki, T., Pritschow, G., Ulsoy, G., and Brussel, H. (1999), Reconfigurable manufacturing systems, Annals of the CIRP, 48(2), 527-540. https://doi.org/10.1016/S0007-8506(07)63232-6
- Lee, D.-H. and Kim, Y.-D. (1996), Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a convention al jobshop, International Journal of Production Research, 34(5), 1347-1360. https://doi.org/10.1080/00207549608904969
- Lee, D.-H. and Kim, Y.-D. (1999), Scheduling algorithms for flexible manufacturing systems with partially grouped machines, Journal of Manufacturing Systems, 18(4), 301-309. https://doi.org/10.1016/S0278-6125(00)86632-7
- Liang, M. and Dutta, S. P. (1992), Combined part selection, loading sharing and machine loading problems in hybrid manufacturing systems, International Journal of Production Research, 30(10), 2335-2349. https://doi.org/10.1080/00207549208948158
- Lim, S.-K. and Kim, Y.-D. (1998), Capacity planning for phased im-plementation of flexible manufacturing system under budget constraints, European Journal of Operational Research, 104(1), 175-186. https://doi.org/10.1016/S0377-2217(96)00328-1
- Loukil, T., Teghem, J., and Fortemps, P. (2007), A multiobjective production scheduling case study solved by simulated annealing, European Journal of Operation Research, 179(3), 709-722. https://doi.org/10.1016/j.ejor.2005.03.073
- Mehrabi, M. G., Ulsoy, A. G., and Koren, Y. (2000), Reconfigurable manufacturing systems: key to future manufacturing, Journal of Intelligent Manufacturing, 11(4), 403-419. https://doi.org/10.1023/A:1008930403506
- Mehrabi, M. G., Ulsoy, A. G., Koren, Y., and Heytler, P. (2002), Trends and perspectives in flexible and reconfigurable manufacturing systems, Journal of Intelligent Manufacturing, 13(2),135-146. https://doi.org/10.1023/A:1014536330551
- Ozguven, C., Ozbakir, L., and Yavuz, Y. (2010), Mathematical models for job-shop scheduling problems with routing and process plan flexibility, Applied Mathematical Modelling, 34(6), 1539-1548. https://doi.org/10.1016/j.apm.2009.09.002
- Rachamadugu, R. V. and Morton, T. E. (1981), Myopic heuristics for the single machine weighted tardiness problem, Working paper No. 28-81-82, Graduate school of Industrial Administration, Carnegie-Mellon University.
- Scrich, C. R., Armentano, V. A., and Laguna, M. (2004), Tardiness minimization in a flexible job shop: a tabu search approach, Journal of Intelligent Manufacturing, 15(1), 103-115. https://doi.org/10.1023/B:JIMS.0000010078.30713.e9
- Suresh, N. C. and Sarkis, J. (1989), An MIP formulation for the phased implementation of FMS modules, Proceedings of the Second ORSA/TIMS Conference of Flexible Manufacturing System: Operations Research Models and Applications, 41-46.
- Vilcot, G. and Billaut, J.-C. (2008), A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem, European Journal of Operations Research, 190(2), 398-411. https://doi.org/10.1016/j.ejor.2007.06.039
- Xia, W. and Wu, Z. (2005), An effective hybrid optimization approach for multi-objective flexible job shop scheduling problems, Computers and Industrial Engineering, 48(2), 409-425. https://doi.org/10.1016/j.cie.2005.01.018
- Yu, J.-M., Doh, H.-H., Kim, J.-S., Kwon, Y.-J., Lee, D.-H., and Nam, S.-H. (2013), Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures, International Journal of Advanced Manufacturing Technology, 67(1-4), 157-169. https://doi.org/10.1007/s00170-013-4761-z
Cited by
- Loading and scheduling for flexible manufacturing systems with controllable processing times pp.1029-0273, 2018, https://doi.org/10.1080/0305215X.2018.1469134
- Batching and scheduling for a single-machine flexible machining cell with multi-fixturing pallets and controllable processing times vol.58, pp.3, 2016, https://doi.org/10.1080/00207543.2019.1602742