References
- Bolat, A. (1997), Efficient Methods for Sequencing Minimum Job Sets on Mixed Model Assembly Lines, Naval Research Logistics, 44, 419-437. https://doi.org/10.1002/(SICI)1520-6750(199708)44:5<419::AID-NAV2>3.0.CO;2-7
- Bolat, A. (1994), Sequencing jobs on an automobile assembly line: objectives and procedures, International Journal of Prod. Res., 32(5), 1219-1236. https://doi.org/10.1080/00207549408956996
- Bolat, A. and Yano, C. (1992a), Scheduling Algorithms to minimize Utility Work at a Single Station on a Paced Assembly, Production Planning and Control, 3(4), 393-405. https://doi.org/10.1080/09537289208919409
- Bolat, A. and Yano, C. (1992b), A surrogate Objective for Utility Work in Paced Assembly Lines, Production Planning and Control, 3(4), 406-412. https://doi.org/10.1080/09537289208919410
- Duplaga, E. A. and Bragg, D. J. (1998), Mixed-model assembly line sequencing heuristics for smoothing component parts usage: a comparative analysis, International Journal of Production Research, 36(8), 2209-2224. https://doi.org/10.1080/002075498192850
- Kim, T., Ji, B., and Cho, H. (2015), Heuristics-Based Algrithm for Production Planning Considering Allocation Rate Conformance to Prevent Unstable Production Chain, Industrial Engineering and Management Systems, 14(4), 413-419. https://doi.org/10.7232/iems.2015.14.4.413
- Kim, Y., Choi, W., and Park, C. (2001), A Quick Sequencing Algorithm for a Mixed Model Assembly Line with Multiple Stations, KORMS Spring Proceedings, 300-303.
- Korkmazel, T. and Meral, S. (2001), Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems, European Journal of Operational Research, 131, 188-207. https://doi.org/10.1016/S0377-2217(00)00061-8
- Kotani, S., Ito, T. and Ohno, K. (2004), Sequencing problem for a mixed-model assembly line in the Toyota production system, International Journal of Production Research, 42(23), 4955-4974. https://doi.org/10.1080/0020754042000270377
- Kurashige, K., Yanagawa, Y., Miyazaki, S., and Kameyana, Y. (2002), Time-based goal chasing method for mixed-model assembly line problem with multiple work stations, Production Planning and Control, 13(8), 735-745. https://doi.org/10.1080/0953728031000057325
- Macaskill, J. L. C. (1972), Production-Line Balances for Mixed-Model Lines, Management Science, 19(4), 423-434. https://doi.org/10.1287/mnsc.19.4.423
- McMullen, P. R. and Frazier, G. V. (2000), A Simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line, IIE Transactions, 32, 679-686.
- Okamura, K. and Yamashina, H. (1979), A Heuristic Algorithm for the Assembly Line Model-Mix Sequencing Problem to Minimize the Risk of Stopping the Conveyor, International J. of Production Research, 17(3), 233-247. https://doi.org/10.1080/00207547908919611
- Thomopolos, N. T. (1967), Line Balancing-Sequencing for Mixed-Model Assembly, Management Science, 14(2), 59-75. https://doi.org/10.1287/mnsc.14.2.B59
- Tsai, L. (1995), Mixed-model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage, Management Science, 41(3), 485-495. https://doi.org/10.1287/mnsc.41.3.485
- Xiaobo, Z. and Ohno, K. (2000), Properties of a sequencing problem for a mixed model assembly line with conveyor stoppage, European Journal of Operational Research, 124, 560-570. https://doi.org/10.1016/S0377-2217(99)00198-8
- Yano, C. A. and Racchamadugu, R. (1991), Sequencing to Minimize Work Overload in Assembly Lines with Product Options, Management Science, 37(5), 572-586. https://doi.org/10.1287/mnsc.37.5.572
- Zeramdini, W., Aigbedo, H. and Moden, Y. (2000), Bicriteria sequencing for just-in-time mixed-model assembly lines, International Journal of Production Research, 38(15), 3451-3470. https://doi.org/10.1080/002075400422743