Abstract
This paper presents the structural analysis of two-span structures constructed by incremental launching method to traverse the existing facilities. The structure with a relatively short launching span can not be secure the structural stability caused by excessive deflection and overturning prior to reaching the maximum strength, because the length of the other span is different or the rear structure is not continuous. In order to estimate the stability of the construction stages of deflection and the overturning, the structural analysis was carried out. The parameters of the analysis is launching span ratio of the launching nose and the upper structure, weight ratio and so on. From the analysis result, the effects of parameters were investigated and a deflection formula of the launching nose and the condition of the overturning of structure were proposed.
본 연구는 기존의 시설물을 횡단하기 위한 목적으로 시공된 지간장이 다른 2경간 연속 구조물을 대한 압출공법을 적용에 관한 것이다. 압출구간이 비교적 짧은 구조물은 인접 경간의 길이가 다른 경우가 많고 압출시 후방 구조물이 연속되지 않는 경우가 많기 때문에 부재 단면력이 최대 내력에 도달하기 이전에 과도한 처짐과 전도가 발생하여 구조적 안정성이 확보되지 못하는 경우가 있다. 이러한 구조물의 시공단계별 구조물의 처짐과 전도에 대한 안정성을 예측하기 위해서 해석적 연구를 수행하였다. 해석에서의 매개변수는 압출추진코와 상부구조물의 길이비, 지간비, 중량비 등이다.해석결과로부터 매개변수의 영향을 분석하였고 압출추진코에서의 구조물의 처짐과 전도 발생 조건식을 제시하였다.