DOI QR코드

DOI QR Code

An Evaluation Model of Transition PMO Competencies Using RGT and AHP

RGT와 AHP을 활용한 이행 PMO 역량평가 모형

  • 차환주 (서울과학기술대학교 IT정책전문대학원, SK C&C) ;
  • 김자희 (서울과학기술대학교 IT정책전문대학원)
  • Received : 2014.10.28
  • Accepted : 2015.03.27
  • Published : 2015.06.30

Abstract

The IT outsourcing industry has been widespread for decades since the growth of the system integration industry stagnates and companies need to curtail expenses and improve the quality of IT services. According to previous studies on the success factors of the IT outsourcing, its transition phase is significant because of continuity of business and the handover of knowledge. Since a transition phase consists of several projects, but its goal is different from general projects, it needs special and professional management. Therefore, recent IT outsourcing business starts to introduce PMO (project management offices), of which success strongly depends on the competencies of the PMO. However, there are only few studies on which competencies of the PMO are important. In this paper, we suggest an evaluation model of transition PMO competencies derived using the repertory grid technique and the analytic hierarchy process. Additionally, we compare the differences between the views of several stakeholders on the importance of the competencies.

Keywords

References

  1. Bates W.S., "Improving Project Management : Better Project Management Begings With a Project Management Office", Indust Eng, 1998, 42.
  2. Beulen, E., V. Tiwari, and E. Heck. "Understanding Transition Performance during Offshore IT Outsourcing", Strategic Outsourcing : An International Journal, Vol.4, No.3, 2011, 204-227. https://doi.org/10.1108/17538291111185449
  3. CGI, "Business Process Services : A Successful Transition is the Foundation of World-Class Outsourcing", CGI Group Inc., 2013, (Downloaded October 27, 2014).
  4. Chalvin, S., "There is No IT Outsourcing without a Transition : An Introduction to ITO Transitions", PMI Virtual Library, 2014, 1-9, (Downloaded October 24, 2014).
  5. Cho, H.G. and W.J. Kim, "Development of Evaluation Method for Performance of Weapon System using Axiomatic Design based Inner Dependence AHP", Korean Management Science Review, Vol.29, No.3, 2012, 45-65. (조현기, 김우제, "공리적설계 기반의 내부종속 AHP를 이용한 국방무기 해외 구매사업의 무기성능 평가방법 개발", 한국경영과학회, 제29권, 제3호, 2012, 45-65.) https://doi.org/10.7737/KMSR.2012.29.3.045
  6. Dai, C.X. and W.G. Wells, "An Exploration of Project Management Office Features and Their Relationship to Project Performance", International Journal of Project Management, Vol.22, No.7, 2004, 523-532. https://doi.org/10.1016/j.ijproman.2004.04.001
  7. Djavanshir, G.R., "Surveying the Risks and Benefits of IT Outsourcing", IT Professional, Vol.7, No.6, 2005, 32-37. https://doi.org/10.1109/MITP.2005.153
  8. Fransella, F., R. Bell, and D. Bannister, A manual for repertory grid technique, John Wiley and Sons, 2004, (Downloaded October 24, 2014).
  9. Hill, G.M., "Evolving the Project Management Office : a Competency Continuum", Information Systems Management, Vol.21, No.4, 2004, 45-51. https://doi.org/10.1201/1078/44705.21.4.20040901/84187.6
  10. HP, HP Services Transition and Transformation Methodology, HP, doi : 5982-4937EN, 2004, (Downloaded October 27, 2014).
  11. IBM, Transition and Transformation, IBM, Sydney, 2007(Downloaded October 27, 2014).
  12. Jun, J.M., S.G. Yi, "Influence Factors and the Introducing Outcomes over IT Outsourcing in the Government Offices", Journal of the Korea Contents Asociation, Vol.13, No.3, 2013, 339-351. (전제만, 이승규, "공공기관의 정보시스템 아웃소싱에 미치는 영향 요인과 도입 성과", 한국콘텐츠학회, 제13호, 제3호, 2013, 339-351.)
  13. Jung, C. and D. Son, "An Exploratory Study for the Evaluation of Risk Factors in Information System Development Using AHP", The Journal of information systems, Vol.15, No.2, 2006, 77-93. (정철용, 손용기, "AHP 기법을 활용한 정보시스템 개발 프로젝트 위험요인 평가에 관한 탐색적 연구", 한국정보시스템학회, 제15권, 제2호, 2006, 77-93.)
  14. Kang, S.B and J.S Woo, "Statistical Estimation and Hypothesis Testing", Kyungmoon-sa, 2002, (Downloaded October 24, 2014). (강석복, 우정수, 통계적 추정과 가설검정, 경문사, 서울, 2002, (Downloaded October 24, 2014).)
  15. Kelly, G., "The Psychology of Personal Constructs. Vol. 1. A Theory of Personality. Vol. 2. Clinical Diagnosis and Psychotherapy", Oxford, England, 1955, (Downloaded October 24, 2014).
  16. Kerzner, H.R., "Project Management Best practices : Achieving Global Excellence", International Institute for Learning, Hoboken, NJ : Wiley, 2010
  17. Kim, M.S., B.W. Lim, and J.B. Lee, "A Study on the Project Governance and the Project Performance", Journal of the Korea Industrial Information System Research, Vol.13, No.4, 2008, 115-131. (김민선, 임병우, 이재범, "PMO의 프로젝트 거버너스 역할이 프로젝트 성과에 미치는 영향에 관한 연구", 한국산업정보학회, 제13권, 제4호, 2008, 115-131.
  18. Kim, S.B., J.T Kim, and B.M. Chang, "A Comparative Study on Critical Competence Importance of PMO Professional : Using the Fuzzy AHP", Journal of KIIT, Vol.12, No.7, 2014, 179-198. (김상복, 김진태, 장병만, "PMO 수행 인력의 핵심 역량 중요도 비교 연구 : Fuzzy-AHP 기법 활용", 한국정보기술학회, 제12권, 제7호, 2014, 179-198.)
  19. Koo, B.M, K.H Kim, and J.G Kim, "Study on Competency and Competency Model : Current State of Competency Model", Korean Journal of Human Resource Development, Vol.13, No.1, 2010, 131-154. (구병모, 김기호, 김종규, "역량과 역량모형의 연구 : 역량모형 연구의 현 주소", 인적자원개발연구, 제13권, 제1호, 2010, 131-154.)
  20. Lacity, M.C., S.A. Khan, and L.P. Willcoks, "A Review of the IT Outsourcing literature : Insights for Practice", Journal of Strategic Information Systems, Vol 18, No.3, 2009, 13-146.
  21. Lee, K.H. and C.Z. Lim, "A Study on the Extraction Structures of Gallery Environment Affecting Viewing Behavior in Art Museums-Focusing on Psychological Experiments Applied to the Repertory Grid Development Method", Journal of the Architectural Institute of Korea (Planning and Design), Vol.24, No.9, 2008, 113-121. (이규황, 임채진, "미술관 관람에 영향을 미치는 전시실환경 평가구조에 관한 연구-레퍼토리그리드 발전수법을 적용한 심리실험을 중심으로", 한국건축학회, 제24권, 제9호, 2008, 113-121.)
  22. Lee, J.N., "The Impact of Knowledge Sharing, Organizational Capability and Partnership Quality on IS Outsourcing Success", Journal of Information and Management, Vol.38, No.5, 2001, 323-335. https://doi.org/10.1016/S0378-7206(00)00074-4
  23. Lee, B.W., J.H. Kim, and W.J. Kim, "A Study on Core Competencies of ITS Project Managers using QFD and AHP", Journal of the Korea Society of IT Services, Vol.10, No.1, 2011, 89-103. (이봉우, 김자희, 김우제, "QFD와 AHP를 이용한 ITS 프로젝트관리자 핵심역량 연구", 한국IT서비스학회, 제10권, 제1호, 2011, 89-103.)
  24. Lee, H.M. and J.I. Kim, "Core Competencies Key Person", Readlead, 2003. (이홍민, 김종인, "핵심역량 핵심인력", 리더리더출판, 2003.
  25. Lee, J.N., "Clients' Strategic Choices to Mitigate Their Dependence on Vendors in IT Outsourcing : Resource Dependence and Opportunism Prospects, Journal of the Korea Society of IT Services, Vol.7, No.1, 2008, 167-193. (이재남, "정보기술 아웃소싱에서 고객이 전문업체에 대한 의존도를 줄이기 위한 전략적 선택에 관한 연구 : 자원의존 및 기회주의 이론 관점에서", 한국IT서비스학회, 제7권, 제1호, 2008, 167-193.)
  26. Lee, J.S. and S.K. Kim, "An Empirical Study on Effects of PMO Governance and Its Influencing Factors", Journal of Information Technology Applications and Management, Vol. 19, No.1, 2012, 61-83. (이진실, 김성근, "PMO 수행체계 적절성의 효과와 영향 요인에 관한 실증연구", 한국데이타베이스학회, 제19권, 제1호, 2012, 61-83.)
  27. Lee, J.S and H.N Kim, "A Study on Image Analysis Model for Exterior Color of Apartments using Multidimensional Scaling Method", Journal of Korean Society of Color Studies, Vol.27, No.1, 2013, 133-141. (이진숙, 김한나, "다차원척도법을 활용한 아파트 외장색채의 이미지분석모델에 관한 연구", 한국색채학회, 제27권, 제1호, 2013, 133-141.) https://doi.org/10.17289/jkscs.27.1.201302.133
  28. Lee, M.S., J.H., Lee, and J.S., Park, "A Descriptive Study of IT Outsourcing Risk Factors in the Korean Financial Industry", Journal of the Korea Society of IT Services, Vol.7, No.1, 2008, 151-166. (이무석, 이정훈, 박종성, "국내 금융업 IT 아웃소싱 수행의사에 영향을 미치는 위험요인에 관한 연구", 한국IT서비스학회, 제7권, 제1호, 2008, 151-166.)
  29. Lee, S.M., E.H. Kim, and S.C. Moon, "The Effect of PMO Service and Capability on Project Performance", Journal of Information Technology Applications and Management, Vol.20, No.1, 2013, 107-132. (이성몽, 김은홍, 문송철, "PMO 서비스와 PMO 역량이 프로젝트 성과에 미치는 영향", 한국데이타베이스학회, 제20권, 제1호, 2013, 107-132.)
  30. Leimeister, S., P. Yetton, K. Wullenweber, and H. Krcmar, "Relational Governance Mediates the Effect of Formal Contracts on BPO Performance", Proceedings of 18th European Conference on Information Systems, Available at http://aisel.aisnet.org/cgi/viewcontent.cgi. 2010, 1-13.
  31. Liu, L. and P. Yetton, "The Contingent Effects on Project Performance of Conducting Project Reviews and Deploying Project Management Offices", IEEE Transactions on Engineering Management, Vol.54, No.4, 2007, 789-799. https://doi.org/10.1109/TEM.2007.906852
  32. Mair, J.M.M., "Prediction of Grid Scores", British Journal of Psychology, Vol. 57, 1966, 187-192. https://doi.org/10.1111/j.2044-8295.1966.tb01018.x
  33. Nguyen, A., "Two-thirds of CIOs Plan to Change Suppliers in Next 24 Months", Computerworld UK, Available at http://www.computerworlduk.com/news/it-business/two-thirds-of-cios-plan-change-suppliers-innext-24-months-3496843/. 14 January, 2014.
  34. NIA, "IT Outsourcing Operation Management Guideline", Ministry of Security and Public Administration, 2011.
  35. NIA, "The Guideline for Introduction and Operation of Project Management Office for e-Government", 2013.
  36. PMS, "The State of the Project Management office", A PM Soutions Research Report Inc., 2014.
  37. Preiss, K.J., "A Two-stage Process for Eliciting and Prioritising Critical Knowledge", Journal of knowledge management, Vol.4, No.4, 2000, 328-336. https://doi.org/10.1108/13673270010379885
  38. Saaty, T.L., "Decision-Making with the AHP : Why is the Principal Eigenvector Necessary", European Journal of Operational Research, Vol.145, No.1, 2003, 85-91. https://doi.org/10.1016/S0377-2217(02)00227-8
  39. Tiwary, V., "Transition Process and Performance in IT Outsourcing-Evidence from a Field Study and Laboratory Experiments", PhD Thesis, Erasmus University Rotterdam, 2010.
  40. Tweardy, J., S. Tarsh, M. Wilton, G. Blauer, M. Mancher, and P. Lowes, "Making an Effective Transition to Outsourcing-Avoiding the ditch", Deloitte, 2012(Downloaded October 27, 2014).