References
- Bates W.S., "Improving Project Management : Better Project Management Begings With a Project Management Office", Indust Eng, 1998, 42.
- Beulen, E., V. Tiwari, and E. Heck. "Understanding Transition Performance during Offshore IT Outsourcing", Strategic Outsourcing : An International Journal, Vol.4, No.3, 2011, 204-227. https://doi.org/10.1108/17538291111185449
- CGI, "Business Process Services : A Successful Transition is the Foundation of World-Class Outsourcing", CGI Group Inc., 2013, (Downloaded October 27, 2014).
- Chalvin, S., "There is No IT Outsourcing without a Transition : An Introduction to ITO Transitions", PMI Virtual Library, 2014, 1-9, (Downloaded October 24, 2014).
- Cho, H.G. and W.J. Kim, "Development of Evaluation Method for Performance of Weapon System using Axiomatic Design based Inner Dependence AHP", Korean Management Science Review, Vol.29, No.3, 2012, 45-65. (조현기, 김우제, "공리적설계 기반의 내부종속 AHP를 이용한 국방무기 해외 구매사업의 무기성능 평가방법 개발", 한국경영과학회, 제29권, 제3호, 2012, 45-65.) https://doi.org/10.7737/KMSR.2012.29.3.045
- Dai, C.X. and W.G. Wells, "An Exploration of Project Management Office Features and Their Relationship to Project Performance", International Journal of Project Management, Vol.22, No.7, 2004, 523-532. https://doi.org/10.1016/j.ijproman.2004.04.001
- Djavanshir, G.R., "Surveying the Risks and Benefits of IT Outsourcing", IT Professional, Vol.7, No.6, 2005, 32-37. https://doi.org/10.1109/MITP.2005.153
- Fransella, F., R. Bell, and D. Bannister, A manual for repertory grid technique, John Wiley and Sons, 2004, (Downloaded October 24, 2014).
- Hill, G.M., "Evolving the Project Management Office : a Competency Continuum", Information Systems Management, Vol.21, No.4, 2004, 45-51. https://doi.org/10.1201/1078/44705.21.4.20040901/84187.6
- HP, HP Services Transition and Transformation Methodology, HP, doi : 5982-4937EN, 2004, (Downloaded October 27, 2014).
- IBM, Transition and Transformation, IBM, Sydney, 2007(Downloaded October 27, 2014).
- Jun, J.M., S.G. Yi, "Influence Factors and the Introducing Outcomes over IT Outsourcing in the Government Offices", Journal of the Korea Contents Asociation, Vol.13, No.3, 2013, 339-351. (전제만, 이승규, "공공기관의 정보시스템 아웃소싱에 미치는 영향 요인과 도입 성과", 한국콘텐츠학회, 제13호, 제3호, 2013, 339-351.)
- Jung, C. and D. Son, "An Exploratory Study for the Evaluation of Risk Factors in Information System Development Using AHP", The Journal of information systems, Vol.15, No.2, 2006, 77-93. (정철용, 손용기, "AHP 기법을 활용한 정보시스템 개발 프로젝트 위험요인 평가에 관한 탐색적 연구", 한국정보시스템학회, 제15권, 제2호, 2006, 77-93.)
- Kang, S.B and J.S Woo, "Statistical Estimation and Hypothesis Testing", Kyungmoon-sa, 2002, (Downloaded October 24, 2014). (강석복, 우정수, 통계적 추정과 가설검정, 경문사, 서울, 2002, (Downloaded October 24, 2014).)
- Kelly, G., "The Psychology of Personal Constructs. Vol. 1. A Theory of Personality. Vol. 2. Clinical Diagnosis and Psychotherapy", Oxford, England, 1955, (Downloaded October 24, 2014).
- Kerzner, H.R., "Project Management Best practices : Achieving Global Excellence", International Institute for Learning, Hoboken, NJ : Wiley, 2010
- Kim, M.S., B.W. Lim, and J.B. Lee, "A Study on the Project Governance and the Project Performance", Journal of the Korea Industrial Information System Research, Vol.13, No.4, 2008, 115-131. (김민선, 임병우, 이재범, "PMO의 프로젝트 거버너스 역할이 프로젝트 성과에 미치는 영향에 관한 연구", 한국산업정보학회, 제13권, 제4호, 2008, 115-131.
- Kim, S.B., J.T Kim, and B.M. Chang, "A Comparative Study on Critical Competence Importance of PMO Professional : Using the Fuzzy AHP", Journal of KIIT, Vol.12, No.7, 2014, 179-198. (김상복, 김진태, 장병만, "PMO 수행 인력의 핵심 역량 중요도 비교 연구 : Fuzzy-AHP 기법 활용", 한국정보기술학회, 제12권, 제7호, 2014, 179-198.)
- Koo, B.M, K.H Kim, and J.G Kim, "Study on Competency and Competency Model : Current State of Competency Model", Korean Journal of Human Resource Development, Vol.13, No.1, 2010, 131-154. (구병모, 김기호, 김종규, "역량과 역량모형의 연구 : 역량모형 연구의 현 주소", 인적자원개발연구, 제13권, 제1호, 2010, 131-154.)
- Lacity, M.C., S.A. Khan, and L.P. Willcoks, "A Review of the IT Outsourcing literature : Insights for Practice", Journal of Strategic Information Systems, Vol 18, No.3, 2009, 13-146.
- Lee, K.H. and C.Z. Lim, "A Study on the Extraction Structures of Gallery Environment Affecting Viewing Behavior in Art Museums-Focusing on Psychological Experiments Applied to the Repertory Grid Development Method", Journal of the Architectural Institute of Korea (Planning and Design), Vol.24, No.9, 2008, 113-121. (이규황, 임채진, "미술관 관람에 영향을 미치는 전시실환경 평가구조에 관한 연구-레퍼토리그리드 발전수법을 적용한 심리실험을 중심으로", 한국건축학회, 제24권, 제9호, 2008, 113-121.)
- Lee, J.N., "The Impact of Knowledge Sharing, Organizational Capability and Partnership Quality on IS Outsourcing Success", Journal of Information and Management, Vol.38, No.5, 2001, 323-335. https://doi.org/10.1016/S0378-7206(00)00074-4
- Lee, B.W., J.H. Kim, and W.J. Kim, "A Study on Core Competencies of ITS Project Managers using QFD and AHP", Journal of the Korea Society of IT Services, Vol.10, No.1, 2011, 89-103. (이봉우, 김자희, 김우제, "QFD와 AHP를 이용한 ITS 프로젝트관리자 핵심역량 연구", 한국IT서비스학회, 제10권, 제1호, 2011, 89-103.)
- Lee, H.M. and J.I. Kim, "Core Competencies Key Person", Readlead, 2003. (이홍민, 김종인, "핵심역량 핵심인력", 리더리더출판, 2003.
- Lee, J.N., "Clients' Strategic Choices to Mitigate Their Dependence on Vendors in IT Outsourcing : Resource Dependence and Opportunism Prospects, Journal of the Korea Society of IT Services, Vol.7, No.1, 2008, 167-193. (이재남, "정보기술 아웃소싱에서 고객이 전문업체에 대한 의존도를 줄이기 위한 전략적 선택에 관한 연구 : 자원의존 및 기회주의 이론 관점에서", 한국IT서비스학회, 제7권, 제1호, 2008, 167-193.)
- Lee, J.S. and S.K. Kim, "An Empirical Study on Effects of PMO Governance and Its Influencing Factors", Journal of Information Technology Applications and Management, Vol. 19, No.1, 2012, 61-83. (이진실, 김성근, "PMO 수행체계 적절성의 효과와 영향 요인에 관한 실증연구", 한국데이타베이스학회, 제19권, 제1호, 2012, 61-83.)
- Lee, J.S and H.N Kim, "A Study on Image Analysis Model for Exterior Color of Apartments using Multidimensional Scaling Method", Journal of Korean Society of Color Studies, Vol.27, No.1, 2013, 133-141. (이진숙, 김한나, "다차원척도법을 활용한 아파트 외장색채의 이미지분석모델에 관한 연구", 한국색채학회, 제27권, 제1호, 2013, 133-141.) https://doi.org/10.17289/jkscs.27.1.201302.133
- Lee, M.S., J.H., Lee, and J.S., Park, "A Descriptive Study of IT Outsourcing Risk Factors in the Korean Financial Industry", Journal of the Korea Society of IT Services, Vol.7, No.1, 2008, 151-166. (이무석, 이정훈, 박종성, "국내 금융업 IT 아웃소싱 수행의사에 영향을 미치는 위험요인에 관한 연구", 한국IT서비스학회, 제7권, 제1호, 2008, 151-166.)
- Lee, S.M., E.H. Kim, and S.C. Moon, "The Effect of PMO Service and Capability on Project Performance", Journal of Information Technology Applications and Management, Vol.20, No.1, 2013, 107-132. (이성몽, 김은홍, 문송철, "PMO 서비스와 PMO 역량이 프로젝트 성과에 미치는 영향", 한국데이타베이스학회, 제20권, 제1호, 2013, 107-132.)
- Leimeister, S., P. Yetton, K. Wullenweber, and H. Krcmar, "Relational Governance Mediates the Effect of Formal Contracts on BPO Performance", Proceedings of 18th European Conference on Information Systems, Available at http://aisel.aisnet.org/cgi/viewcontent.cgi. 2010, 1-13.
- Liu, L. and P. Yetton, "The Contingent Effects on Project Performance of Conducting Project Reviews and Deploying Project Management Offices", IEEE Transactions on Engineering Management, Vol.54, No.4, 2007, 789-799. https://doi.org/10.1109/TEM.2007.906852
- Mair, J.M.M., "Prediction of Grid Scores", British Journal of Psychology, Vol. 57, 1966, 187-192. https://doi.org/10.1111/j.2044-8295.1966.tb01018.x
- Nguyen, A., "Two-thirds of CIOs Plan to Change Suppliers in Next 24 Months", Computerworld UK, Available at http://www.computerworlduk.com/news/it-business/two-thirds-of-cios-plan-change-suppliers-innext-24-months-3496843/. 14 January, 2014.
- NIA, "IT Outsourcing Operation Management Guideline", Ministry of Security and Public Administration, 2011.
- NIA, "The Guideline for Introduction and Operation of Project Management Office for e-Government", 2013.
- PMS, "The State of the Project Management office", A PM Soutions Research Report Inc., 2014.
- Preiss, K.J., "A Two-stage Process for Eliciting and Prioritising Critical Knowledge", Journal of knowledge management, Vol.4, No.4, 2000, 328-336. https://doi.org/10.1108/13673270010379885
- Saaty, T.L., "Decision-Making with the AHP : Why is the Principal Eigenvector Necessary", European Journal of Operational Research, Vol.145, No.1, 2003, 85-91. https://doi.org/10.1016/S0377-2217(02)00227-8
- Tiwary, V., "Transition Process and Performance in IT Outsourcing-Evidence from a Field Study and Laboratory Experiments", PhD Thesis, Erasmus University Rotterdam, 2010.
- Tweardy, J., S. Tarsh, M. Wilton, G. Blauer, M. Mancher, and P. Lowes, "Making an Effective Transition to Outsourcing-Avoiding the ditch", Deloitte, 2012(Downloaded October 27, 2014).