Studies on a parallel system with two types of failure

  • El-Damcese, M.A. (Department of Mathematics, Faculty of Science, Tanta University) ;
  • Alaidi, Sharhabeel (Department of Basic Science, Preparatory Year, King Saudi University) ;
  • Shama, M.S. (Department of Basic Science, Preparatory Year, King Saudi University)
  • Received : 2014.10.26
  • Accepted : 2015.05.24
  • Published : 2015.06.30

Abstract

In this paper, we investigate reliability and availability of repairable systems with two types of failure. The first one is to one unit and the second one is to M units in parallel structure. Let failure rate and repair rate of [type1, type2] components are assumed to be exponentially distributed. The expressions of availability and reliability characteristics such as the system reliability and the mean time to failure are derived for two systems. We used several cases to analyze graphically the effect of various system parameters on the reliability system and availability system.

Keywords

References

  1. Galikowsky, C., Sivazlian, B. D. and Chaovalitwongse, P. (1996). Optimal redundancies for reliability and availability of series systems, Microelectronics and Reliability, 36, 1537-1546. https://doi.org/10.1016/0026-2714(95)00209-X
  2. Wang, K. H. and Sivazlian, B. D. (1989). Reliability of a system with warm standbys and repairmen, Microelectronics and Reliability, 29, 849-860. https://doi.org/10.1016/0026-2714(89)90184-4
  3. ke JB, Chen, JW and Wang, KH. (2011). Reliability measures of a repairable system with standby switching failures and reboot delay, Quality Technology & Quantitative Management, 8, 15-26. https://doi.org/10.1080/16843703.2011.11673243
  4. Wang, KH, Ke, JB and Ke, JC. (2007). Profit analysis of the M/M/R machine repair problem with balking ,reneging, and standby switching failures, Computers and Operations Research, 34, 835-847. https://doi.org/10.1016/j.cor.2005.05.013
  5. Ke, JC, Hsu YL, Liu, TH and Zhang, ZG. (2013). Computational analysis of machine repair problem with unreliable multi-repairmen, Computers & Operations Research, 40, 848-8855. https://doi.org/10.1016/j.cor.2012.10.004
  6. Wang, KH, Chen, WL and Yang, DY. (2009). Optimal management of the machine repair problem with working vacation: New ton's method, Computational and Applied Mathematics, 233, 449-458. https://doi.org/10.1016/j.cam.2009.07.043
  7. Hsu, YL, Ke, JC and Liu, TH. (2011). Standby system with general repair, reboot delay, switching failure and unreliable repair facility a statistical standpoint, Mathematics and Computers in Simulation, 81, 2400-22413. https://doi.org/10.1016/j.matcom.2011.03.003
  8. Jain, M., Rakhee and Singh, M. (2004). Bilevel control of degraded machining system with warm standbys, setup and vacation, Applied Mathematical Modeling, 28, 1015-11026. https://doi.org/10.1016/j.apm.2004.03.009
  9. Wang, KH, Dong, WL and Ke, JB. (2006). Comparison of reliability and the availability between four systems with warm standby components and standby switching failures, Applied Mathematics and Computation, 183, 1310-11322. https://doi.org/10.1016/j.amc.2006.05.161
  10. El-Damcese, M. A. and Shama, M. S. (2015). Reliability and availability analysis of a 2-state repairable system with two types of failure published in Engineering Mathematical Letter, 2.