참고문헌
- Adrian, J. J. (1987). Construction productivity improvement, Elsevier, New York, N.Y.
- Ballard, G., and Howell, G. A. (2003). "Lean project management." Build. Res. Inf., 31(2), pp. 119-133. https://doi.org/10.1080/09613210301997
- Business Roundtable. (1987). Measuring productivity in construction, A Construction Industry Cost Effectiveness Project Report.
- Carr, R. I., and Meyer, W. L. (1974). "Planning construction of repetitive building units." J. Constr. Div., 100(3), pp. 403-412.
- Herbsman, Z., and Ellis, R. (1990). "Research of factors influencing construction productivity." Constr. Manage. Econom., 8(1), pp. 49-61 https://doi.org/10.1080/01446199000000005
- Hwang, H., Kim, K., Seo, S., Kim, C., and Shin, D. (2002). "Analysis of Actual Duration by Effecting Elements to Duration Estimate." Korean Journal of Construction Engineering and Management, KICEM, 3(3), pp. 84-93.
- Hwang, J. (2009). "Business Process Model for Applying TACT Methodology to Finish Work in Apartment House." MS Thesis, Soonsil University.
- Josephson, P. E., and Hammarlund, Y. (1999). "The causes and costs of defects in construction: A study of seven building projects." Autom. Constr., 8, pp. 681-687. https://doi.org/10.1016/S0926-5805(98)00114-9
- Jung, J. (2007). "Improvement of TACT Scheduling Management Process for the Finish Work of Apartment Houses." MS Thesis, Dankook University.
- Kim, B. (2012). "TACT Process Reengineering for Improving the Usability in Construction Sites." MS Thesis, Chungbuk National University.
- Kim, J., Kim, G., and Cho, H. (2006). "The Success Factors of Scheduling using the TACT Technique in Wall Type Apartment House Construction." Journal of the Korea Institute of Building Construction, 6(1), pp. 79-86. https://doi.org/10.5345/JKIC.2006.6.1.079
- Kim, J., Yoon, Y., Jang, M., and Suh, S. (2007). "Workflow-based TACT Planning & Scheduling Process -Focused on the Finish Work of Apartment Building-." Journal of the Architectural Institute of Korea Structure & Construction, 23(6), pp. 153-162.
- Kim, K. (2014). "A Study on Improvement of Repetition Process Management for Finish Works Quality of Construction -Focused on Apartment Housing Projects-." MS Thesis, Yonsei University.
- Kim, O., Park, J., and Kim, B. (2012). "Reengineering of TACT Process Management Analyzed on Task Information." Korean Journal of Construction Engineering and Management, KICEM, 13(5), pp. 113-124. https://doi.org/10.6106/KJCEM.2012.13.5.113
- Kim, S., Na, K., Kim, T., Yu, J., Lee, H., and Kim, C. (2003). "A Study on the TACT Management using a Daily Report Information." Korean Journal of Construction Engineering and Management, KICEM, 4(4), pp. 80-87.
- Kim, S., Son, K., Joo, J., Lee, D., and Lee, S. (2011). " An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings." Journal of the Korea Institute of Building Construction, 11(4), pp. 396-406. https://doi.org/10.5345/JKIBC.2011.11.4.396
- Kim, S., Yoo, J., Kim, D., and Park, J. (2014). "TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique." Korean Journal of Construction Engineering and Management, KICEM, 15(2), pp. 3-11. https://doi.org/10.6106/KJCEM.2014.15.2.003
- Kim, T. (2008). "Improvement of TACT Scheduling Process in Finishing Works of the Residential Housing." MS Thesis, Department of Architecture Graduate School, Ajou University.
- Kim T., Lee, H., Park, M., and Yu, J. (2011). "Productivity Management Methodology using Productivity Achievement Ratio." Journal of Civil Engineering, KSCE, 15(1), pp. 23-31.
- Kim. T., Yu, J., Baek, T., and Lee, H. (2004). "Productivity Achievement Ratio Model through Construction Productivity Reduction Factor Analysis." Journal of the Architectural Institute of Korea Structure & Construction, 24(2), pp. 135-142.
- Kim. T., Yu, J., and Lee, H. (2003). "Productivity Management Methodology using Productivity Achievement Ratio." Journal of the Architectural Institute of Korea Structure & Construction, 19(9), pp. 103-111.
- Kim, Y., Han, J., Shin, D., Kim, K., Kim, C., and Seo, S. (2003). " A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects." Journal of the Architectural Institute of Korea Structure & Construction, 19(1), pp. 161-168.
- Koskela, L. (1992). "Application of The New Production Philosophy to Construction." CIFE Technical Report No. 72, Stanford University.
- Koushki, P. A., Al-Rashid, K., and Kartam, N. (2005). "Delays and cost increases in the construction of private residential projects in Kuwait." Constr. Manage. Econom., 23, pp. 285-294. https://doi.org/10.1080/0144619042000326710
- Lee, H. (2014). "Issues and Improvement Schemes of TACT Process Management Application to Practical sites in Public Housing Finishing Works." MS Thesis, The Graduate School of Construction Engineering, Chung-Ang University.
- Lee, J. (2001). "A Work Interference Management Model for Apartment Building Finish Works." MS Thesis, Chung-Ang University.
- Lee, W. (2011). "The Application of the TACT Method for Finish Works of Apartment Buildings." MS Thesis, KyungHee University.
- Lin, C., and Huang, H. (2010). "Improved Baseline Productivity Analysis Technique." J. Constr. Eng. Manage., 136(3), pp. 367-376. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000129
- Lowe, J. G. (1987). "The measurement of productivity in the construction industry."Constr. Manage. Econom., 5(2), pp. 101-113. https://doi.org/10.1080/01446198700000010
- Neil, J. M., and Knack, L. E. (1984). "Predicting productivity."AACE Transactions, pp. 1-8.
- Oglesby, C., Parker, H., and Howell, G. (1989). Productivity improvement in construction, McGraw-Hill, New York, N.Y.
- Okoil, C., and Pawlowski S. (2004). "The Delphi Method as a Research Tool: An Example, Design Considerations and Applications." Information & Management, 42(1), pp. 15-29. https://doi.org/10.1016/j.im.2003.11.002
- Park, M., Kim, K., Shin, D., and Cha, H. (2006). "Improvement on TACT Scheduling Method Applying Theory of Constraints." Journal of the Architectural Institute of Korea Structure & Construction, 22(6), pp. 139-146.
- Peer, S. (1974). "Network analysis and construction planning." J. Constr. Div., 100(3), pp. 203-210.
- Rendall, F. J., and Wolf, D. M. (1983). Statistical Sources and Techniques, McGraw-Hill, London, pp. 41-52.
- Sacks, R., and Goldin, M. (2007). "Lean Management Model for Construction of High-Rise Apartment Buildings." Journal of Construction Engineering and Management, 133(5), pp. 374-384. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:5(374)
- Shin, D. (2009). "Application Plan of TACT Process for Finish Works in Apartment Housing Projects." MS Thesis, Graduate School of Urban Science, University of Seoul.
- Sink, D. S. (1985). Productivity Management: Planning. Measurement and Evaluation, Control and Improvement, John Wiley & Sons, N.Y.
- Suh, S., Kim, J., Kim, S., Kim, C., and Lee, H. (2003). "Development and Application of TACT Management System." Korean Journal of Construction Engineering and Management, KICEM, 4(4), pp. 145-154.
- Sumanth, D. (1984). Productivity engineering and management, McGraw-Hill, New York, N.Y.
- Thomas, H. R., and Mathews, C. T. (1985). "An analysis of the methods of measuring construction productivity." Construction Industry Institute, Austin, Texas.
- Thomas, H. R., and Zavrski, I. (1999). "Construction baseline productivity: Theory and practice." Journal of Construction Engineering and Management, 125(5), pp. 295-303. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(295)
- Xia, Bo, and Chan, Albert. (2011). "Measuring Complexity for Building Projects : a Delphi Study." Engineering, Construction and Architectural Management, 19(1), pp. 7-24. https://doi.org/10.1108/09699981211192544
- Yoon, Y., Joung, Y., Suh, S., Shin, D., Kim, C., and Kim, K. (2003). "Improvement of Construction Process Management Dividing th Work Area Reasonably in Building Construction." Korean Journal of Construction Engineering and Management, KICEM, 4(2), pp. 59-65.
- Yoon, Y., and Suh, S. (2005). "The Application of TACT Time at Finish Work for Building Construction - Focused on Office Building-." Korean Journal of Construction Engineering and Management, KICEM, 6(6), pp. 90-97.
- Yu, J., Lee, H., Kim, S., Kim, C., and Suh S. (2004). "Effect of Labor Factors on Work Flows." Journal of the Architectural Institute of Korea Structure & Construction, 20(4), pp. 135-142.
- Ziglio E. (1996). The Delphi method and its contribution to decision making. Gazing into the oracle: The Delphi method and its application to social policy and public health, Jessica Kingsley Publisher, London.