References
- Cho, H., Cho, Y. R. and Kim, H. S. (2011). "Application of construction management integrated system based on BIM in civil engineering project." Journal of the Korean Society of Civil Engineering, Vol. 59, No. 2, pp. 36-42.
- Construction Economy News (2012). "Automating construction equipment using GPS." (Newspaper 2012.8.17).
- Electronic News (2012). "GPS information can be used for SOC projects." (Newspaper 2012.10.31).
- Kim, B. H. (2000). "Comprehensive management of construction equipment using GPS." Construction Technology Information, No. 9, pp. 5-10.
- Kim, H. J., Choi, J. S., Kim, H. S. and Kim, I. H. (2013). "The development of data model for open BIM-Based schematic estimates - Focused on construction type for actual cost of public projects." Architectural Research, Vol. 29, No. 3, pp. 61-70.
- Kim, M. J., Lee, K. H., Kwon, S. H., Park, S. I. and Lee, S. C. (2014). "BIM application case study of civil infrastructure Industry." Proceedings of the Korean Society for Railway, pp. 1119-1124.
- Kim, T. H. and Lee, C. S. (2014). "A survey of Building Information modeling in domestic public construction on actual case." Proceedings of Korean Institute of Construction Engineering, pp. 247-251.
-
Lee, B. H., Hong, S. W. and Shin, S. W. (2012). "The development of BIM library for building life cycle
$CO_{2}$ assessment." Journal of the Korean Digital Architecture Interior Association, Vol. 12, No. 2, pp. 67-76. - Lee, G. H., Kim, J. H. and Kim, J. J. (2012). "BIM utilization plan for schedule risk management." Proceedings of Korea Institute of Building Construction, Vol. 12, No. 1, pp. 143-144.
- Lee, H. Y. and Shim, J. H. (2013). GIS Geographic information theory and practice, Beopmoonsa, Seoul, Korea.
- Lee, S. Y., Park, C. S. and Kim, I. H. (2014). "Issues and prospects of BIM-to-BEM (Building Energy Model)." Architectural Research, Vol. 30, No. 4, pp. 199-206.
- National Geographic Information Institute (2015). GNSS Data Service, Available at: http://gnss.ngi.go.kr/ (Accessed: March 15, 2015).
- Park, J. B. (2008). A study on GIS and simulation based process model for earthmoving planning, Master's Thesis, Hanyang University.
- Park, M. S., Cho, J. Y., Lee, H. S., Kwon, S. K. and Ahn, S. J. (2012). "BIM design management process using the dependency structure matrix at the introduction phase." Architectural Research, Vol. 28, No. 1, pp. 37-45.
- Public Procurement Service (2013). A Guideline for applying BIM to facility projects, Daejeon, Korea.
- Seo, M. B., Joo, G. B. and Kim, N. G. (2013). "Analysis of substitutability of 2D electronic drawing using the BIM model - focusing on the electronic delivery system in road field." Journal of the Korea Contents Association, Vol. 13, No. 11, pp. 441-450. https://doi.org/10.5392/JKCA.2013.13.11.441
- Shim, C. H., Lee, K. M., Kang, I. S., Kim, Y. H. and Hwang, K. H. (2011). BIM guideline for civil engineering, Virtual Construction Research Group, Ministry of Land, Infrastructure and Transportation, Sejong, Korea
- Shin, J. C., Back, Y. I. and Park, W. T. (2011). "Technical note : Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D." Journal of the Korean Geotechnical Society, Vol. 27, No. 8, pp. 63-71. https://doi.org/10.7843/kgs.2011.27.8.063
Cited by
- The BIM-enabled geotechnical information management of a construction project 2018, https://doi.org/10.1007/s00607-017-0571-8