DOI QR코드

DOI QR Code

건설 공정모형 기반 품질기록 추적관리 시스템

Developing Quality Record Traceability System using Construction Operation Model

  • 손상혁 (경북대학교 건설환경에너지공학부 대학원) ;
  • 곽한성 (경북대학교 건설환경에너지공학부 대학원) ;
  • 이홍철 (경북대학교 건설환경에너지공학부 대학원) ;
  • 이동은 (경북대학교 건축.토목공학부)
  • 투고 : 2014.08.22
  • 심사 : 2014.10.31
  • 발행 : 2014.11.30

초록

The demand of quality record traceability management increases from various industries in resent years. However, the studies related to traceability management system is lacking in the construction industry. This paper presents a quality record traceability system (QRT) for construction operation which keeps track of the historical quality records to guarantee the quality of construction facilities. An anatomical chart for building was established and used to identify atomic object (e.g., column, beam, wall, etc). In addition, hierarchical breakdown structure was applied to define data collection level. Web-based QRT enables users to access the historical quality records obtained during construction phase. To verify the applicability of the system, a residential house project was used for the case study. Finally, the traceability of the system at the construction operation level is ensured by finding the resources who are responsible for the quality of each and every element of the facility.

키워드

과제정보

연구 과제 주관 기관 : 한국연구재단

참고문헌

  1. Atkin, B. Stereotypes and themes in building designs: Insights for model builders, Construction Management and Economics, 11(2), 119-130, 1993 https://doi.org/10.1080/01446199300000005
  2. Bell, L., and Williams, B. Resources and field technology for sign management system implementation, Bridges, 10(40671), 21, 2003
  3. Bernold, L. E. Bar code-driven equipment and materials tracking for construction, Journal of Computing in Civil Engineering, 4(4), 381-395, 1990 https://doi.org/10.1061/(ASCE)0887-3801(1990)4:4(381)
  4. Bevilacqua, M., Ciarapica, F. E., and Giacchetta, G. Business process reengineering of a supply chain and a traceability system: a case study, Journal of Food Engineering, 93(1), 13-22, 2009 https://doi.org/10.1016/j.jfoodeng.2008.12.020
  5. Blyth, K., Lewis, J. and Kaka, A. Developing a framework for a standardised works programme for building projects in the UK, Construction Innovation, Vol. 14 No. 4, 193-210, 2004
  6. Blyth, K., and Kaka, A. A novel multiple linear regression model for forecasting S-curves, Engineering, Construction and Architectural Management, 13(1), 82-95, 2006 https://doi.org/10.1108/09699980610646511
  7. Brotherton, S. A., Fried, R. T., and Norman, E. S. Applying the work breakdown structure to the project management lifecycle, In Proceeding of the 2008 PMI Global Congress, Denver, USA, 1-15, 2008
  8. Burke, H. E. Handbook of bar coding systems, Van Nostrand Reinhold Co.,Inc., New York, N.Y, 1984
  9. Carriquiry, M., and Babcock, B. A. Reputations, market structure, and the choice of quality assurance systems in the food industry, American Journal of Agricultural Economics, 89(1), 12-23, 2007 https://doi.org/10.1111/j.1467-8276.2007.00959.x
  10. Colenso, K. Creating the work breakdown structure. Artemis Management Systems, 2000
  11. Eldin, N.N. Measurement of work progress: quantitative technique, Journal of Construction Engineering and Management, 115(3), 462-487, 1989 https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(462)
  12. Finch, E. F., Flanagan, R., and Marsh, L. E. Electronic document management in construction using auto-ID. Automation in construction, 5(4), 313-321, 1996 https://doi.org/10.1016/S0926-5805(96)00156-2
  13. Folinas, D., Manikas, I., and Manos, B. Traceability data management for food chains. British Food Journal, 108(8), 622-633, 2006 https://doi.org/10.1108/00070700610682319
  14. Garcia-Fornieles, J. M., Fan, I. S., Perez, A., Wainwright, C., and Sehdev, K. A work breakdown structure that integrates different views in aircraft modification projects, Concurrent Engineering, 11(1), 47-54, 2003 https://doi.org/10.1177/1063293X03011001005
  15. Grau, D., Zeng, L., and Xiao, Y. Automatically tracking engineered components through shipping and receiving processes with passive identification technologies, Automation in Construction, 28, 36-44, 2012 https://doi.org/10.1016/j.autcon.2012.05.016
  16. Gray, C., and Little, J. The classification of work packages to determine the relationship between design and construction, Occasional paper, (18), 1985
  17. Goodrum, P. M., McLaren, M. A., and Durfee, A. The application of active radio frequency identification technology for tool tracking on construction job sites, Automation in Construction, 15(3), 292-302, 2006 https://doi.org/10.1016/j.autcon.2005.06.004
  18. Halpin, D. W., and Riggs, L. S. Planning and Analysis of Construction Operation, John Wiley and Sons Inc., USA, 1992.
  19. Hashemi Golpayegani, S. A., and Emamizadeh, B. Designing work breakdown structures using modular neural networks, Decision Support Systems, 44(1), 202-222, 2007 https://doi.org/10.1016/j.dss.2007.03.013
  20. Haugan, G.T. Effective Work Breakdown Structures, Management Concepts, Vienna, 2002
  21. Ibrahim, Y. M., Kaka, A. P., Trucco, E., Kagioglou, M., and Ghassan, A. Semi-automatic development of the work breakdown structure (WBS) for construction projects, In Proceedings of the 4th International SCRI Research Symposium, Salford, UK, 2007
  22. Ibrahim, Y. M., Kaka, A., Aouad, G., and Kagioglou, M. Framework for a generic work breakdown structure for building projects, Construction Innovation: Information, Process, Management, 9(4), 388-405, 2009 https://doi.org/10.1108/14714170910995930
  23. Ikonen, J., Knutas, A., Hamalainen, H., Ihonen, M., Porras, J., and Kallonen, T. Use of embedded RFID tags in concrete element supply chains, Electron. J. Inf. Technol. Constr.(ITcon), 18, 119-147, 2013
  24. Jansen-Vullers, M. H., van Dorp, C. A., and Beulens, A. J. Managing traceability information in manufacture, International Journal of Information Management, 23(5), 395-413, 2003 https://doi.org/10.1016/S0268-4012(03)00066-5
  25. Jian, M. S., and Wu, J. S. RFID Applications and Challenges, 2013
  26. Jung, Y., and Kang, S. Knowledge-based standard progress measurement for integrated cost and schedule performance control, Journal of Construction Engineering and Management, 133(1), 10-21, 2007 https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
  27. Jung, Y., and Woo, S. Flexible work breakdown structure for integrated cost and schedule control, Journal of construction engineering and management, 130(5), 616-625, 2004 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)
  28. Karkkainen, M, Increasing efficiency in the supply chain for short shelf life goods using RFID tagging, International Journal of Retail & Distribution Management, 31(10), 529-536, 2003 https://doi.org/10.1108/09590550310497058
  29. Kato, H., Chai, D., and Tan, K. T, Barcodes for mobile devices, Cambridge University Press, 2010
  30. Kim, C., Kim, H., Ryu, J., and Kim, C. Ubiquitous sensor network for construction material monitoring, Journal of Construction Engineering and Management, 137(2), 158-165, 2010
  31. Ko, C. H. RFID-based building maintenance system, Automation in Construction, 18(3), 275-284, 2009 https://doi.org/10.1016/j.autcon.2008.09.001
  32. Lee, K. J., Kim, H. W., Lee, J. K., and Kim, T. H. Case-and constraint-based project planning for apartment construction, AI magazine, 19(1), 13, 1998
  33. Lee, H. S., Lee, K. P., Park, M., Baek, Y., and Lee, S. RFID-based real-time locating system for construction safety management, Journal of Computing in Civil Engineering, 26(3), 366-377, 2011
  34. Lee, J. H., Song, J. H., Oh, K. S., and Gu, N. Information lifecycle management with RFID for material control on construction sites, Advanced Engineering Informatics, 27(1), 108-119, 2013 https://doi.org/10.1016/j.aei.2012.11.004
  35. Lin, Y. C., Cheung, W. F., and Siao, F. C. Developing mobile 2D barcode/RFID-based maintenance management system, Automation in Construction, 37, 110-121, 2014 https://doi.org/10.1016/j.autcon.2013.10.004
  36. Lo Bello, L., Mirabella, O., and Torrisi, N. Modelling and Evaluating traceability systems in food manufacturing chains, In Enabling Technologies: Infrastructure for Collaborative Enterprises, 2004, WET ICE 2004, 13th IEEE International Workshops on 173-179, IEEE, 2004
  37. Madec, F., Geers, R., Vesseur, P., Kjeldsen, N., and Blaha, T. Traceability in the pig production chain, Revue Scientifique et Technique-Office International des Epizooties, 20(2), 523-537, 2001
  38. Matsumoto, H., and Uchida, T. Information Provison via Traceability System for Civil Structures, Memoirs of the Faculty of Engineering Osaka City University, 51, 19-26, 2010
  39. McKean, J. D. The importance of traceability for public health and consumer protection, Revue scientifique et technique, 20(2), 363, 2001 https://doi.org/10.20506/rst.20.2.1280
  40. Moe, T. Perspectives on traceability in food manufacture, Trends in Food Science & Technology, 9(5), 211-214, 2005
  41. Navon, R., and Berkovich, O. Development and on-site evaluation of an automated materials management and control model. Journal of construction engineering and management, 131(12), 1328-1336, 2005 https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1328)
  42. Ngai, E. W. T., Cheng, T. C. E., Lai, K. H., Chai, P. Y. F., Choi, Y. S., and Sin, R. K. Y. Development of an RFID based Traceability System: Experiences and Lessons Learned from an Aircraft Engineering Company, Production and Operations Management, 16(5), 554-568, 2007
  43. Nkado, R. N. Construction time information system for the building industry, Construction Management and Economics, 10(6), 489-509, 1992 https://doi.org/10.1080/01446199200000048
  44. Peyret, F., and Tasky, R. A traceability system between plant and work site for asphalt pavements, Computer Aided Civil and Infrastructure Engineering, 19(1), 54-63, 2004 https://doi.org/10.1111/j.1467-8667.2004.00337.x
  45. PMI. Project Management Institute Practice Standard for Work Breakdown Structure, Project Management Institute, Newtown Square, PA, 2001
  46. Poirier, C. C., and McCollum, D. RFID strategic implementation and ROI: a practical roadmap to success. J. Ross Publishing, 2006
  47. Raz, T. and Globerson, S. Effective sizing and content definition of work packages, Project Management Journal, 29(4), 17-23, 1998
  48. Ren, Z., Anumba, C. J., and Tah, J. RFID-facilitated construction materials management (RFID-CMM)A case study of water-supply project, Advanced Engineering Informatics, 25(2), 198-207, 2011 https://doi.org/10.1016/j.aei.2010.02.002
  49. Saeed, G., Brown, A., Knight, M., and Winchester, M. Delivery of pedestrian real-time location and routing information to mobile architectural guide, Automation in Construction, 19(4), 502-517, 2010 https://doi.org/10.1016/j.autcon.2009.11.018
  50. Sahin, E., Dallery, Y., and Gershwin, S. Performance evaluation of a traceability system, An application to the radio frequency identification technology, In Systems, Man and Cybernetics, 2002 IEEE International Conference, IEEE, 3, 6, 2002
  51. Salin, V. Information technology in agri-food supply chains. The International Food and Agribusiness Management Review, 1(3), 329-334, 1998 https://doi.org/10.1016/S1096-7508(99)80003-2
  52. Taylor, M. D. How to Develop Work Breakdown Structures, 2003
  53. Thompson, M., Sylvia, G., and Morrissey, M. T. Seafood traceability in the United States: Current trends, system design, and potential applications, Comprehensive Reviews in Food Science and Food Safety, 4(1), 1-7, 2005 https://doi.org/10.1111/j.1541-4337.2005.tb00067.x
  54. Voivedich Jr, B. E., White, R. E., and Aghili, H. K. Development and implementation of a standard WBS for offshore construction, In Offshore Technology Conference, Offshore Technology Conference, 2001
  55. Wakisaka, T., Furuya, N., Inoue, Y., and Shiokawa, T. Automated construction system for high-rise reinforced concrete buildings, Automation in Construction, 9(3), 229-250, 2000 https://doi.org/10.1016/S0926-5805(99)00039-4
  56. Wang, L. C. Enhancing construction quality inspection and management using RFID technology, Automation in Construction, 17(4), 467-479, 2008 https://doi.org/10.1016/j.autcon.2007.08.005
  57. Wang, S., Shi, J., Jiang, D., and Qi, Z. Research for Traceability Model of Material Supply Quality in Construction Project, In Computational Intelligence and Design (ISCID), 2012 Fifth International Symposium, IEEE, 2, 398-401, 2012
  58. Yin, S. Y., Tserng, H. P., Wang, J. C., and Tsai, S. C. Developing a precast production management system using RFID technology, Automation in Construction, 18(5), 677-691, 2009 https://doi.org/10.1016/j.autcon.2009.02.004