참고문헌
- H. A. Rahman, M. A. Berawi, A.R. Berawi, O. Mohamed, M. Othman, I.A. Yahya, "Delay mitigation in the Malaysian construction industry." Journal of Construction Engineering Management, vol. 132, no. 2, pp.125-133, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
- N.K. Acharya, Y.D. Lee, H.M. Im, "Investigating Delay Factors in Construction Industry: A Korean perspective." Korean Journal of Construction Engineering and Management, vol. 10, no. 6, pp. 177-190, 2006.
- A.A. Aibinu, A. Odeyinka, "Construction Delays and their Causative Factors in Nigeria." Journal of Construction Engineering Management, ASCE, vol. 132, no. 7, pp. 667-677, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
- R.T.M. Akogbe, X. Feng, J. Zhou, "Importance and Ranking Evaluation of Delay Factors for Development Construction Projects in Benin." KSCE Journal of Civil Engineering, vol. 17, no. 6, pp. 1213-1222, 2013. https://doi.org/10.1007/s12205-013-0446-2
- MD. A. Hasan, "Evaluation of Building Construction Management in Sylhet City, Bangladesh" KICEM Journal of Construction Engineering and Project Management, vol. 2, no.2, pp. 40-47, 2012. https://doi.org/10.6106/JCEPM.2012.2.3.040
- A.H. Al-Momani, "Construction Delay: A Quantitative Analysis." International Journal of Project Management, vol. 18, no. 1, pp. 51-59, 2000. https://doi.org/10.1016/S0263-7863(98)00060-X
- S.A. Asaaf, M. Al-Khalil, "Causes of Delay in Large Building Construction Projects." International Journal of Project Management, vol. 11, no. 2, pp. 45-50, 1995.
- S.A. Asaaf, S. Al Hejji, "Causes of Delay in Large Construction Projects." International Journal of Project Management, vol. 24, pp. 349-357, 2006. https://doi.org/10.1016/j.ijproman.2005.11.010
- J.R. Baldwin, J.M. Manthei, "Causes of Delay in the Construction Industry." Journal of Construction Division, ASCE, vol. 97, no. 2, pp. 177-187, 1971.
- D.W. Chan, M.M. Kumaraswamy, "A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects". International Journal of Project Management, vol. 15, no. 1, pp. 55-63, 1997. https://doi.org/10.1016/S0263-7863(96)00039-7
- H. Doloi, A. Sawhney, K.C. Iyer, S. Rentala, "Analyzing Factors Affecting Delays in Indian Construction Projects." International Journal of Project Management, Vol. 30, 479-489, 2012. https://doi.org/10.1016/j.ijproman.2011.10.004
- M.E. El-Razek, H.A. Bassioni, A.M. Mobarak, "Causes of Delay in Building Construction Projects in Egypt." Journal of Construction Engineering and Management, ASCE, vol. 134, no. 11, pp. 831-841, 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)
- A.S. Ezeldin, M. Abdel-Ghany, "Causes of Construction Delays for Engineering Projects in the Middle-East: An Egyptian Perspective." AEI, ASCE, pp. 53-62, 2013.
- A.S. Faridi, S.M. Sayegh, "Significant Factors Causing Delay in the UAE Construction Industry." Construction Management and Economics, vol. 24, no. 11, pp. 1167-1176, 2006. https://doi.org/10.1080/01446190600827033
- Y. Frimpong, J. Oluwoye, L. Crawford, "Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study." International Journal Project Management, vol. 21, pp. 321-326, 2003. https://doi.org/10.1016/S0263-7863(02)00055-8
- M. Ibrahim, A. Bruland, N. Dmaidi, "Causes of Delay in Road Construction Projects." Journal of Management in Engineering, ASCE, vol. 28, no. 3, pp. 300-310, 2012. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000096
- P. Kaming, P. Olomolaiye, G. Holt, F. Harris, "Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia." Construct Management and Economics, vol. 15, pp. 83-94, 1997. https://doi.org/10.1080/014461997373132
- P.A. Koushki, K. Al-Rashid, N. Kartam, "Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait." Construction Management and Economics, Vol. 23, no. 3, pp. 285-294, 2005. https://doi.org/10.1080/0144619042000326710
- L. Le-Hoai, Y.D. Lee, J.Y. Lee, "Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with other Selected Countries." KSCE Journal of Civil Engineering, Vol. 12, no. 6, pp. 367-377, 2008 https://doi.org/10.1007/s12205-008-0367-7
- T.Y. Lo, I.W.H. Fung, K.C.F. Tung, "Construction Delays in Hong Kong Civil Engineering Projects." Journal of Construction Engineering Management, ASCE, vol. 132, no. 6, pp. 636-649, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)
- M.M. Marzouk, T.I. El-Rasas, "Analyzing Delay Causes in Egyptian Construction Projects." Journal of Advanced Research, 2013.
- M. Sambasivan, Y.W. Soon, "Causes and Effects of Delays in Malaysian Construction Industry." International Journal of Project Management, vol. 25, pp. 517-526, 2007. https://doi.org/10.1016/j.ijproman.2006.11.007
- MD.R.R. Shaon, "Investigation of Construction Delay of Real Estate Companies in Dhaka City", Bachelor of Science thesis, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh, 2012.
피인용 문헌
- The top 10 universal delay factors in construction projects vol.11, pp.3, 2018, https://doi.org/10.1108/IJMPB-05-2017-0052