References
- Park, S., Yim, H. and Jee, H., 2009, Digital Fabtory for Virtual Line Simulation and RFID, Proceedings of the Society of CAD/CAM Engineers Conference, pp.489-492.
- Park, D., Yang, J., You, K. and Park, B., 2008, Implementation of an E-BOM Copy Method for an Order-specific Semiconductor Equipment, Transactions of the Society of CAD/CAM Engineers, 13(4), pp.273-285.
- Park, G.M., 2008, Performance Evaluation of Scheduling Rules using Manufacturing Line Simulation, Konkuk University.
- Gurnani, H., Anupindi, R. and Akella, R., 1992, Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing (v5, 1992), pp.319-328. https://doi.org/10.1109/66.175364
- Sarin, S.C., Varadarajan, A. and Wang, L., 2011, A Survey of Dispatching Rules for Operational Control in Wafer Fabrication, Production Planning and Control, 22(1), pp.4-24. https://doi.org/10.1080/09537287.2010.490014
- Zhou, Z. and Rose, O., 2010, A Pull/Push Concept for Tool Group Workload Balance in a Wafer Fab, In Proceedings of the 2010 Winter Simulation Conference, pp.2516-2512.
- Rosenberg, O. and Ziegler, H., 1992, A Comparison of Heuristic Algorithms for Cost-oriented Assembly Line Balancing, Zeitschrift fur Operations Research 36, pp.477-495.
- Zhou, Z. and Rose, O., 2009, A Bottleneck Detection and Dynamic Dispatching Strategy for Semiconductor Wafer Fabrication Facilities, Proc. of the Winter Simulation Conference, December 13-16, Austin, TX, USA, pp.1646-1656.
- Chung, J. and Jang, J., 2009, IEEE Transactions on Semiconductor Manufacturing, 22(3), pp.381-390. https://doi.org/10.1109/TSM.2009.2017666
- Fowler, J. and Robinson, J., 1995, Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report, Technical Report 95062861A-TR, SEMATECH, Austin, TX.
- Zhou, Z. and Rose, O., 2012, WIP Control and Calibration in a Wafer FAB, In Proceedings of the 2012 Winter Simulation Conference, Research46, pp.5515-5529.
- Kim, S., Yea, S. and Kim, B., 2000, Stepper Scheduling in Semiconductor Wafer Fabrication Process, The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing, Arizona, pp.157-167.
- Lee, B., Lee, Y.H., Yang, T. and Ignisio, J., 2008, A Due-date Based Production Control Policy using WIP Balance for Implementation in Semiconductor Fabrications, International Journal of Production.
- Tanjong, Shirley J., 2011, Bottleneck Management Strategies in Semiconductor Wafer Fabrication Facilities, Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22-24.
- Wein, L.M., 1988, Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1, 115-129. https://doi.org/10.1109/66.4384
Cited by
- Considering Alternative Machines in the Manufacturing System for Aircraft Parts vol.25, pp.4, 2016, https://doi.org/10.9709/JKSS.2016.25.4.001