DOI QR코드

DOI QR Code

Bottleneck Detection Framework Using Simulation in a Wafer FAB

시뮬레이션을 이용한 웨이퍼 FAB 공정에서의 병목 공정 탐지 프레임워크

  • Yang, Karam (Department of Industrial Engineering, Ajou University) ;
  • Chung, Yongho (Department of Industrial Engineering, Ajou University) ;
  • Kim, Daewhan (Defense Agency for Technology and Quality) ;
  • Park, Sang Chul (Department of Industrial Engineering, Ajou University)
  • Received : 2014.05.07
  • Accepted : 2014.07.18
  • Published : 2014.09.01

Abstract

This paper presents a bottleneck detection framework using simulation approach in a wafer FAB (Fabrication). In a semiconductor manufacturing industry, wafer FAB facility contains various equipment and dozens kinds of wafer products. The wafer FAB has many characteristics, such as re-entrant processing flow, batch tools. The performance of a complex manufacturing system (i.e. semiconductor wafer FAB) is mainly decided by a bottleneck. This paper defines the problem of a bottleneck process and propose a simulation based framework for bottleneck detection. The bottleneck is not the viewpoint of a machine, but the viewpoint of a step with the highest WIP in its upstream buffer and severe fluctuation. In this paper, focus on the classification of bottleneck steps and then verify the steps are not in a starvation state in last, regardless of dispatching rules. By the proposed framework of this paper, the performance of a wafer FAB is improved in on-time delivery and the mean of minimum of cycle time.

Keywords

References

  1. Park, S., Yim, H. and Jee, H., 2009, Digital Fabtory for Virtual Line Simulation and RFID, Proceedings of the Society of CAD/CAM Engineers Conference, pp.489-492.
  2. Park, D., Yang, J., You, K. and Park, B., 2008, Implementation of an E-BOM Copy Method for an Order-specific Semiconductor Equipment, Transactions of the Society of CAD/CAM Engineers, 13(4), pp.273-285.
  3. Park, G.M., 2008, Performance Evaluation of Scheduling Rules using Manufacturing Line Simulation, Konkuk University.
  4. Gurnani, H., Anupindi, R. and Akella, R., 1992, Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing (v5, 1992), pp.319-328. https://doi.org/10.1109/66.175364
  5. Sarin, S.C., Varadarajan, A. and Wang, L., 2011, A Survey of Dispatching Rules for Operational Control in Wafer Fabrication, Production Planning and Control, 22(1), pp.4-24. https://doi.org/10.1080/09537287.2010.490014
  6. Zhou, Z. and Rose, O., 2010, A Pull/Push Concept for Tool Group Workload Balance in a Wafer Fab, In Proceedings of the 2010 Winter Simulation Conference, pp.2516-2512.
  7. Rosenberg, O. and Ziegler, H., 1992, A Comparison of Heuristic Algorithms for Cost-oriented Assembly Line Balancing, Zeitschrift fur Operations Research 36, pp.477-495.
  8. Zhou, Z. and Rose, O., 2009, A Bottleneck Detection and Dynamic Dispatching Strategy for Semiconductor Wafer Fabrication Facilities, Proc. of the Winter Simulation Conference, December 13-16, Austin, TX, USA, pp.1646-1656.
  9. Chung, J. and Jang, J., 2009, IEEE Transactions on Semiconductor Manufacturing, 22(3), pp.381-390. https://doi.org/10.1109/TSM.2009.2017666
  10. Fowler, J. and Robinson, J., 1995, Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report, Technical Report 95062861A-TR, SEMATECH, Austin, TX.
  11. Zhou, Z. and Rose, O., 2012, WIP Control and Calibration in a Wafer FAB, In Proceedings of the 2012 Winter Simulation Conference, Research46, pp.5515-5529.
  12. Kim, S., Yea, S. and Kim, B., 2000, Stepper Scheduling in Semiconductor Wafer Fabrication Process, The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing, Arizona, pp.157-167.
  13. Lee, B., Lee, Y.H., Yang, T. and Ignisio, J., 2008, A Due-date Based Production Control Policy using WIP Balance for Implementation in Semiconductor Fabrications, International Journal of Production.
  14. Tanjong, Shirley J., 2011, Bottleneck Management Strategies in Semiconductor Wafer Fabrication Facilities, Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22-24.
  15. Wein, L.M., 1988, Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1, 115-129. https://doi.org/10.1109/66.4384

Cited by

  1. Considering Alternative Machines in the Manufacturing System for Aircraft Parts vol.25, pp.4, 2016, https://doi.org/10.9709/JKSS.2016.25.4.001