참고문헌
- Kim, C. H. and Hong, Y. (1996), An Optimal Production Run Length in A Deteriorating Machine, Journal of the Korean Institute of Industrial Engineers, 22(3), 351-364.
- Kim, C. H. and Hong, Y. (1997), An Optimal Production Cycle and Inspection Schedules in A Deteriorating Machine, Journal of the Korean Institute of Industrial Engineers, 23(2), 261-273.
- Kim, C. H. (2005), An EMQ Model with Rework, Journal of the Korean Institute of Industrial Engineers, 31(2), 173-179.
- Jamal, A. M. M., Sarker, B. R., and Mondal S. (2004), Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System, Computers and Industrial Engineering, 47(1), 77-89. https://doi.org/10.1016/j.cie.2004.03.001
- Lawless, J. F. (1982), Statistical Models and Methods for Lifetime Data, John Wiley and Sons.
- Lee, H. L. and Rosenblatt, M. J. (1987), Simultaneous Determination of Production Cycle and Inspection Schedules In a Production System, Management Science, 33(9), 1125-1136. https://doi.org/10.1287/mnsc.33.9.1125
- Lee, H. L. and Rosenblatt, M. J. (1989), A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay, IIE Transactions, 21(4), 368-375. https://doi.org/10.1080/07408178908966243
- Liou, M.-J., Tseng, S.-T., and Lin, T.-M. (1994), The Effects of Inspection Errors to the Imperfect EMQ Model, IIE Transactions, 26(2), 42-51. https://doi.org/10.1080/07408179408966595
- Porteus, E. L. (1986), Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research, 34(1), 137-144. https://doi.org/10.1287/opre.34.1.137
- Rahim, M. A. (1994), Joint Determination of Production Quantity, Inspection Schedule, and Control Chart Design, IIE Transactions, 26(6), 2-11.
- Rosenblatt, M. J. and Lee, H. L. (1986), Economic Production Cycles with Imperfect Production Processes, IIE Transactions, 18(1), 48-55. https://doi.org/10.1080/07408178608975329
- Salameh, M. K. and Jaber, M. Y. (2000), Economic Production Quantity Model for Items with Imperfect Quality, International Journal of Production Economics, 64, 59-64. https://doi.org/10.1016/S0925-5273(99)00044-4
- Sarkar, B. and Moon, I. K. (2011), An EPQ Model with Inflation in an Imperfect Production System, Applied Mathematics and Computation, 217(13), 6159-6167. https://doi.org/10.1016/j.amc.2010.12.098
- Yano, C. A. and Lee, H. L. (1995), Lot Sizing with Random Yields : A Review, Operations Research, 43(2), 311-334. https://doi.org/10.1287/opre.43.2.311
- Zhang, X. and Gerchak, Y. (1990), Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield, IIE Transactions, 22(2), 41-47. https://doi.org/10.1080/07408179008964156
피인용 문헌
- Modeling and Implementation of the Affordance-based Human-Machine Collaborative System vol.41, pp.1, 2015, https://doi.org/10.7232/JKIIE.2015.41.1.034