DOI QR코드

DOI QR Code

A Case Study on Collaborative Activities for Newly Installation of an Engine in a Helicopter

헬기 엔진의 신규장착을 위한 지원 사례 연구

  • Ahn, Ieeki (Rotorcraft System Team, Korea Aerospace Research Institute) ;
  • Kim, Jae-Hwan (Engine System Team, Korea Aerospace Research Institute) ;
  • Sung, Oksuk (Engine System Team, Korea Aerospace Research Institute)
  • 안이기 (한국항공우주연구원 회전익기체계팀) ;
  • 김재환 (한국항공우주연구원 엔진시스템팀) ;
  • 성옥석 (한국항공우주연구원 엔진시스템팀)
  • Received : 2014.06.05
  • Accepted : 2014.06.29
  • Published : 2014.06.30

Abstract

From the flight safety and the performance point of views, a new engine installation impacts an helicopter development or upgrade program significantly. More than a close relationship between an aircraft manufacturer and an engine manufacturer is necessary for the best integration work from the program initiation phase. In this paper, technical cooperation between aircraft and engine companies, and technical supports by the engine manufacturer for the T700/701K engine during the Surion development program are summarized. The applications of official technical program documents, US Mil-spec, France airworthiness regulations as the standard of the engine installation work, and engineering activities at each phase such as contract, design and manufacturing, flight clearance, ground and flight tests are described. This paper would be a cornerstone for the future domestic helicopter development program.

Keywords