반복공구 작업조 동기화 시스템 개발

Developing Crew Synchronization System for Repetitive Units

  • 이홍철 (경북대학교 건설환경에너지공학부 대학원) ;
  • 박상민 (경북대학교 건설환경에너지공학부 대학원) ;
  • 이동은 (경북대학교 건축 토목공학부)
  • 투고 : 2014.08.19
  • 심사 : 2014.10.29
  • 발행 : 2014.12.30

초록

Repetitive project planning and scheduling method requires complementing the disadvantages of the critical path method (CPM) and the line of balance (LOB) method, which are confined in time-driven and graphical analysis, respectively. CPM is lack of capability to handle repetitive projects. LOB is also lack of analytical qualities of schedule information due to its' dependency on graphical technique. Existing studies attempt to combine CPM and LOB techniques in a system. However, they are mostly graphical methods. A new method integrating CPM and LOB techniques is presented so as to schedule repetitive projects using formula computing schedule information of each and every units of a project schedule. The proposed method perform basic LOB calculations to ensure resource employment continuity. Each and every activity durations at all units, floats and project completion time are computed using CPM method. Test cases are conducted to verify the potential of the proposed method.

키워드

과제정보

연구 과제 주관 기관 : 한국연구재단

참고문헌

  1. 류한국, 김태희, 선형 공정계획 모델의 액티비티 관계의 경계조건 분석, 한국건설관리학회논문집, 12(1), 23-32, 2011 https://doi.org/10.6106/KJCEM.2011.12.1.23
  2. 류한국, 장명훈, CPM공정표를 선형 공정표로 변환하기 위한 액티비티 생성 방법, 대한건축학회논문집 - 구조계, 27(10), 161-168, 2011
  3. 이재섭, 선형계획법을 이용한 건설공사 공기지연 분석방법, 대한건축학회논문집 - 구조계, 23(8), 213-220, 2007
  4. 이재섭, 학습효과와 선형계획법을 이용한 건설공사 공기지연 분석방법, 대한건축학회논문집 - 구조계, 24(5), 185-192, 2008
  5. Ammar, M., Float analysis of non-serial repetitive activities, Journal of Construction Management and Economics, 21(5), 535-542, 2003 https://doi.org/10.1080/0144619032000073523
  6. Ammar, M. and Mohieldin, Y., CPM/RSM: CPM-Based repetitive scheduling method III, Middle East Regional Civil Engineering Conference, Egypt Section, ASCE, Reston, VA, 2002
  7. Arditi, D. and Albulak, M., Line-of-balance in pavement construction, Journal of Construction Engineering and Management, 112(3), 411-424, 1986 https://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(411)
  8. Duffy, G., Oberlender, G. and Jeong, D., Linear scheduling model with varying production rates, Journal of Construction Engineering and Management, 137(8), 574-582, 2011 https://doi.org/10.1061/(ASCE)CO.1943-7862.0000320
  9. El-Rayes, K. and Moselhi, O., Resource-driven scheduling of repetitive projects, Construction Management and Economics, 16(4), 433-446, 1998 https://doi.org/10.1080/014461998372213
  10. Fan, S. and Tserng, H., Object-oriented scheduling for repetitive projects with soft logics, Journal of Construction Engineering and Management, 132(1), 35-48, 2006 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(35)
  11. Hegazy, T., Computer-based construction project management, Prentice Hall, Upper Saddle River, NJ, 2002
  12. Hegazy, T. and Kamarah, E., Efficient repetitive scheduling for high-rise construction, Journal of Construction Engineering and Management, 134(4), 253-264, 2008 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:4(253)
  13. Hegazy, T. and Wassef, N., Cost optimization in projects with repetitive nonserial activities, Journal of Construction Engineering and Management, 127(3), 183-191, 2001 https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(183)
  14. Jaafari, A., Criticism of CPM for project planning analysis, Journal of Construction Engineering and Management, 110(2), 222-233, 1984 https://doi.org/10.1061/(ASCE)0733-9364(1984)110:2(222)
  15. Lucko, G., Productivity scheduling method compared to linear and repetitive project scheduling methods, Journal of Construction Engineering and Management, 134(9), 711-720, 2008 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(711)
  16. Lucko, G. and Orozco, A., Float types in linear schedule analysis with singularity functions, Journal of Construction Engineering and Management, 135(5), 368-377, 2009 https://doi.org/10.1061/(ASCE)CO.1943-7862.0000007
  17. Maravas, A. and Pantouvakis, J., A fuzzy repetitive scheduling method for projects with repeating activities, Journal of Construction Engineering and Management, 137(7), 561-564, 2011 https://doi.org/10.1061/(ASCE)CO.1943-7862.0000319
  18. Mattila, K. and Abraham, D., Resource leveling of linear schedules using integer linear programming, Journal of Construction Engineering and Management, 124(3), 232-244, 1998 https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(232)
  19. Reda, R., RPM: Repetitive project modeling, Journal of Construction Engineering and Management, 116(2), 316-330, 1990 https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(316)
  20. Russel, A. and Wong, W., New generation of planning structures, Journal of Construction Engineering and Management, 119(2), 196-214, 1993 https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(196)
  21. Selinger, S., Construction planning for linear projects, Journal of the Construction Division, 106(2), 195-205, 1980
  22. Strdal, O. and Cacha, J., Time space scheduling method, Journal of the Construction Division, 108(3), 445-457, 1982
  23. Suhail, S. and Neale, R., CPM/LOB: New methodology to integrate CPM and line of balance, Journal of Construction Engineering and Management, 120(3), 667-684, 1994 https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(667)
  24. Yang, T. and Ioannou, P., Scheduling system with focus on practical concerns in repetitive projects, Journal of Construction Engineering and Management, 22(6), 619-630, 2004 https://doi.org/10.1080/01446190310001649065