References
- Behzadian, M., Kazemzadeh, R., Albadvi, A., and Aghdasi, M., PROMETHEE : A comprehensive literature review on methodologies and applications. European Journal of Operational Research, 2010, Vol. 200, No. 1, p 198-215. https://doi.org/10.1016/j.ejor.2009.01.021
- Davenport, T.H. and Short, J.E., The new industrial engineering : information technology and business process redesign. Sloan Management Review, 1990, Vol. 31, No. 4, p 11-27.
- El-Sawy, O.A., Redesigning enterprise processes for e-business, McGraw Hill Higher Education, 2001.
- Hammer, M., Reengineering Work : Don't Automate, Obliterate. Harvard business review, 1990, Vol. 68, No. 4, p 104-112.
- Hammer, M. and Hershman L.W., Faster Cheaper Better : The 9 Levers for Transforming How Work Gets Done, Crown Business, 2010.
- Hwang, C., Lai, Y., and Liu, T., A new approach for multiple objective decision making, Computers and Operations Research, 1993, Vol. 20, No. 8, p 889-899. https://doi.org/10.1016/0305-0548(93)90109-V
- Ishikawa, K., Guide to quality control, Asian Productivity Organization, Tokyo, 1982.
- Kang, J. and Lim, S., A Methodology for Business Process Improvement Based on Event-driven Process Chain Model. Proceedings of the 2013 KSIE(Korea Industrial and Systems Engineering) Spring Conference, 2013, p 26-33.
- Korea Post, Annual Report, 2011.
- Lim, S. and Kang, J., Improvement of Registered Mail Service Process, ETRI, 2011,
- Lim, S., Kim, J., and Shin, Y., Presort and Loading of Commercial Bulk Mails for Minimizing Mailing Fees. Journal of the Society of Korea Industrial and Systems Engineering, 2013, Vol. 36, No. 1, p 8-16.
- McDonald, M., Improving business processes, Harvard Business Review Press, 2010.
- Saaty, T.L., The Analytic Hierarchy Process : Planning, Priority Setting, Resource Allocation, McGraw-Hill, New York, 1980.
- Scheer, A.W., ARIS : Vom Geschaftsprozess zum Anwendungssystem, Springer, 2002.
Cited by
- 인과관계체인 기반의 분석 결과를 활용한 비즈니스 프로세스 개선 과제 정의 vol.38, pp.1, 2013, https://doi.org/10.11627/jkise.2014.38.1.101