References
- Cho, H.J. et al., 2011. Development of an Web-Based Process Innovation Supporting System. CAD/CAM review, 17(2), pp.56-63.
- Gong, I.Y. & Hwang, H.J., 2011. A Simulation-Based Production Technology of Ships and Ocean Plants. Bulletin of the Society of Naval Architects of Korea, 48(4), pp.3-3.
- Harward, G. & Harrell, C., 2006. Assessment of the NIST shop data model as a neutral file format. Proceedings of the 2006 Winter Simulation Conference, Monterey, California, U.S.A., 3-6 December 2006, pp.941-946.
- Lee, C.H. Leem, C.S. & Hwang, I.H., 2011. PDM and ERP Integration Methodology using Digital Manufacturing to Support Global Manufacturing. The International Journal of Advanced Manufacturing Technology, 53(1-4), pp.399-409. https://doi.org/10.1007/s00170-010-2833-x
- Lee, J.Y. et al., 2011. NESIS: A Neutral Schema for a Web-Based Simulation Model Exchange Service Across Heterogeneous Simulation Software. International Journal of Computer Integrated Manufacturing, 24(10), pp.948-969. https://doi.org/10.1080/0951192X.2011.608726
- Lee, K.K. et al., 2006. Construction of Scheduling Support System for Panel Lines by Digital Manufacturing Simulation. Journal of the Society of Naval Architects of Korea, 43(2), pp.228-235. https://doi.org/10.3744/SNAK.2006.43.2.228
- Lee, K.K., 2008. Simulation-based ship production execution system for a panel block shop. Ph.D. Seoul National University.
- Lee, P. & Hwang, I.H., 2011. A Cross-Check Simulation and Production Management Platform in Shipyards. Bulletin of the Society of Naval Architects of Korea, 48(4), pp.10-13.
- Lee, T. McLean, C. & Shao, G., 2003. A neutral information model for simulating machine shop operations. Proceedings of the 2003 Winter Simulation Conference. New Orleans, Los Angeles, U.S.A., 7-10 December 2003, pp.1296-1304.
- Lee, Y.T. & McLean, C., 2006. A Neutral Data Interface Specification for Simulating Machine Shop Operations. Production Planning & Control, 17(2), pp.143-154. https://doi.org/10.1080/09537280500223996
- Lu, R.F. Qiao, G. & McLean, C., 2003. Nist XML Simulation Interface Specification at Boeing : A Case Study. Proceedings of the 2003 Winter Simulation Conference. New Orleans, Los Angeles, U.S.A., 7-10 December 2003, pp.1230-1237.
- Song, Y.J. et al., 2009. A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning. Journal of the Society of Naval Architects of Korea, 46(1), pp.78-86. https://doi.org/10.3744/SNAK.2009.46.1.078
- Woo, J.H., 2005. Modeling and simulation of indoor shop system of shipbuilding by integration of the product, process, resource and schedule information. Ph.D. Seoul National University.
- Woo, J.H. et al., 2005. A Framework of Plant Simulation for a Construction of a Digital Shipyard. Journal of the Society of Naval Architects of Korea, 42(2), pp.165-174. https://doi.org/10.3744/SNAK.2005.42.2.165
- Woo, J.H. et al., 2006. Simulation Modeling Methodology and Simulation System Architecture for Shipbuilding Processes. Transactions of the Society of CAD/CAM Engineers, 11(1), pp.11-19.
Cited by
- Production Process Analysis based on Information Strategy Planning with Present Condition Diagnosis of Small FRP Shipyards vol.53, pp.5, 2016, https://doi.org/10.3744/SNAK.2016.53.5.353