Abstract
Tower crane hoisting plan is one of the key element for the success of entire High-Rise Building construction. Hoisting time is the basic factor to appropriate hoisting plan which need to the hoisting load estimate and tower crane selection. With this reason, accurate hoisting time is needed to the proper hoisting plan. The current hoisting time estimation for High-Rise Building focus on the hoisting cycle time estimation with historical data. However, this method underestimated the external influences like environmental factor. Thus, this paper aims to develop the hoisting time estimation model with discrete event simulation which include the wind influences with certain height. According to the simulation result, the hoisting time which applied wind influence is increasing with height growth. Because of the high speed wind, the upper area of building has more operation delay time than the mechanical operation time. Seoul, the research area, has the most fastest wind speed on April and the least on October. Due to these differences of wind speed, the hoisting time is estimated with significant differences between April and October. This hosting time estimation model would be used for estimating the influence of wind. Moreover, this could apply to make the realistic hoisting plan.
초고층 건물공사에서 타워크레인의 양중계획은 전체 공사의 성패를 좌우할 수 있는 매우 중요한 요소 중 하나이다. 타워크레인의 양중계획에 있어 양중시간은 기본적인 요소 중 하나로 이를 바탕으로 양중부하 및 타워크레인을 선정하기 때문에 양중계획을 위해서는 정확한 양중시간의 예측이 필요하다고 할 수 있다. 현재 초고층 공사의 양중시간 예측은 기존의 실적자료와 시뮬레이션을 이용하여 수행하고 있지만 양중작업에 영향을 미치는 환경적인 요인에 대해서는 충분히 고려되지 못하고 있다. 따라서 본 연구에서는 양중작업에 영향을 크게 미치는 바람을 시뮬레이션에 반영하여 초고층 공사의 타워크레인 양중시간을 예측하는 시뮬레이션 모델을 개발하였다. 시뮬레이션 분석 결과 바람의 영향을 반영한 양중시간은 높이가 올라갈수록 증가하였으며, 초고층부의 경우 기계적 양중시간보다 바람의 영향에 의한 양중 지연시간이 더 크다는 것을 알 수 있었다. 또한 연구 대상지인 서울의 풍속은 4월이 강하고 10월이 약하게 나타났으며, 양중시간을 예측한 결과 둘 간의 큰 차이가 발생함을 알 수 있었다. 이 같은 결과는 향후 초고층 타워크레인 양중계획 시 바람이 양중에 미치는 영향을 예측하고 이를 고려하여 실제 상황과 동일한 양중계획을 세우는데 활용될 수 있을 것으로 기대된다.