Development of Construction Benchmarking for Oversea Industrial Projects

해외플랜트 공사 벤치마킹 프로그램 개발

  • Received : 2012.07.17
  • Accepted : 2013.02.27
  • Published : 2013.05.30

Abstract

The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

2003년 이후 국내 건설회사의 해외 건설수주액이 급격히 늘어나고 있다. 해외 플랜트 공사는 시공사의 EPC와 사업관리 능력이 성패를 좌우한다. 시공사의 사업관리 능력 제고하기 위해서는 건설성과를 측정하고 평가하는 과정이 필요하다. 따라서 본 논문은 해외 플랜트 참여사들의 건설성과 벤치마킹을 위한 프로그램을 개발하였다. 건설 성과지표는 사업비, 공기, 품질, 안전 등으로 구성되어 있다. 그리고 해외에서 수행된 플랜트 공사 10개의 자료를 입수하여 성과를 분석하였다. 해외 플랜트 공사 벤치마킹 프로그램을 개발하는 과정에서 업계의 피드백과 교훈을 제시하였다. 그리고 본 프로그램이 지속적으로 활용되기 위해 고려해야 할 사항을 제안하였다.

Keywords

References

  1. Ko, Y. S., Yoon, H. S., and Lee, J. H. (2004). Performance management in the public sector, KDI.
  2. Park, H. S. (2007). "Public infrastructure practitioner's recognition on project performance." Construction Management, Vol. 8, No. 2, pp. 93-100 (in Korean).
  3. Lee, K. S., and Moon, H. P. (1995). National budget and policy goals: Government Innovation, KDI (in Korean).
  4. ICAK and HNU (2010). Development of a performance framework for oversea plant projects, MLTM (in Korean).
  5. Atkinson, R. (1999). "Project management: Cost, Time, and Quality, Two Best Guesses and a Phenomenon, It's Time to Accept Other Success Criteria." International Journal of Project Management, Vol. 17, No. 6, pp. 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6
  6. Brown, A., and Adams, J. (2000). "Measuring the effect of project management on construction outputs: a new approach." International Journal of Project Management, Vol. 18, No. 5, pp. 327-335. https://doi.org/10.1016/S0263-7863(99)00026-5
  7. Bubshait, A. A., and Almohawis, S. A. (1994). "Evaluating the general conditions of a construction contract." International Journal of Project Management, Vol. 12, No. 3, pp. 133-135. https://doi.org/10.1016/0263-7863(94)90027-2
  8. Chan, A. P. C. (1996). Determinants of project success in the construction industry of Hong Kong. Ph.D thesis, Univ. of South Australia.
  9. Chan, A. P. C. (2000). "Evaluation of enhanced design and build system-A case study of hospital project." Construction Management and Economics, Vol. 18, No. 8, pp. 863-871. https://doi.org/10.1080/014461900433140
  10. Chan, M., Nizette, M., La Rance, L., Broughton, C., and Russel, D. (2002). "Australia." OECD Journal on budgeting, Vol. 1, No. 4, pp. 35-69. https://doi.org/10.1787/budget-v1-art21-en
  11. Costa, D. B., Formoso, C. T., Kagioglou, M., Alarcon, L. F., and Caldas, C. H. (2006). "Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities." Journal of Management in Engineering, ASCE, Vol. 22, No. 4, pp. 158-167. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:4(158)
  12. Cox, R., Issa, R. A., and Ahrens, D. (2003). "Management's perception of key performance indicators for construction." Journal of Construction Engineering and Management, ASCE, 1292: 142-151.
  13. Fisher, D., Minertschin, S., and Pollock, D. R., (1995). "Benchmarking in construction industry." Journal of Management in Engineering, ASCE, Vol. 11, No. 1, pp. 50-57. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:1(50)
  14. Hatush, Z., and Skitmore, M. (1997). "Criteria for contractor selection." Construction Management and Economics, Vol. 15, No. 1, pp. 19-38. https://doi.org/10.1080/014461997373088
  15. Meade, G., Rankin, J., and Manseau, A. (2006). "Performance of the canadian construction industry - a benchmarking pilot." Canadian Civil Engineer, Vol. 23, No. 4, pp. 8-11.
  16. Naoum, S. G. (1994). "Critical analysis of time and cost of management and traditional contracts." Journal of Construction Engineering and Management, ASCE, Vol. 120, No. 4, pp. 687-705. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(687)
  17. Newcombe, R. (2000). "The anatomy of two projects: A Comparative Analysis Approach." International Journal of Project Management, Vol. 18, No. 3, pp. 189-199. https://doi.org/10.1016/S0263-7863(99)00075-7
  18. OECD (1999). Improving evaluation practices: Best Practice Guidelines for Evaluation and Background Paper, PUMA/PAC (99)1.
  19. Park, H. S. (2002). Development of construction productivity metrics system, Ph.D dissertation, Univ. of Texas, Austin, Tex.
  20. Park, H. S., Thomas, S. R., and Tucker, R. L. (2005). "Benchmarking of construction productivity." Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 7, pp. 772-778. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(772)
  21. Shenhar, A. J., Levy, O., and Dvir, D. (1997). "Mapping the dimensions of project success." Project Management Journal, Vol. 28, No. 2, pp. 5-13.
  22. Songer, A. D., and Molenaar, K. R. (1997). "Project characteristics for successful public-sector design-build." Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 1, pp. 34-40. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(34)