DOI QR코드

DOI QR Code

Construction Technology Roadmapping for Port Offshore Wind Farm

항만해상풍력단지 건설기술 로드맵 수립

  • Received : 2013.01.07
  • Accepted : 2013.02.20
  • Published : 2013.02.28

Abstract

This paper aims to presents a systematic procedure for the development of construction technology roadmap, which can consider the offshore wind farm on port. Then the weight among the large/medium/small classified construction technology has identified through the AHP(Analytical Hierarchy Process) approach using FGI(Focus Group Interview) and questionnaire study. Based on the priority for classified construction technology a construction technology roadmap for port offshore wind farm was also developed. The technology roadmap suggests the time frame(20 years, from 2016 to 2036) to complete R&D work for the classified construction technology of port offshore wind farm. Such construction technology roadmap can be utilized as a milestone in setting up the R&D strategy in the green port construction industry.

본 논문의 목적은 항만해상풍력단지 건설을 위한 기술개발 로드 맵을 제시하는 것이다. FGI(Focus Group Interview)와 설문지를 이용한 AHP(Analytical Hierarchy Process) 방법을 적용해서 대/중/소 분류된 건설기술의 가중치를 도출했고, 분류된 건설기술에 대한 우선순위를 근거로 항만해상풍력단지 건설기술 로드 맵이 수립되었다. 기술 로드 맵은 항만해상풍력단지의 분류된 건설기술에 대한 R&D 사업을 달성하기 위한 20년간(2016년부터 2036년 까지)의 일정을 제시하고 있다. 이러한 건설기술 로드 맵은 녹색항만건설산업의 R&D 전략을 수립하기 위한 이정표로 활용될 수 있다.

Keywords