• Title/Summary/Keyword: construction technology

Search Result 11,711, Processing Time 0.044 seconds

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

What are the Risks of using Smart Technology in the Construction Phase?

  • Lee, Baul;Park, Seung-Kook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.103-110
    • /
    • 2022
  • In the era of the 4th Industrial Revolution, smart technology being considered to improve productivity breakthroughs is in the spotlight as a means to replace traditional construction technology in the construction industry. However, various problems are occurring in construction sites using smart technology and causing negative impacts on construction projects. Therefore, the objective of this study is to identify risk factors that occur when smart technologies are used in construction projects. To achieve this purpose, this study investigated the difficulties at construction projects using smart technology, and risk factors were derived based on site surveys and literature. The risk factors were measured by experts, and then a total of 19 risk factors was derived by exploratory factor analysis. As a result, risks were classified as 5 factors, the institutional factor is the most difficult response, and the government needs anticipative system improvement and a long-term plan. The research findings provide practical implications for construction experts trying to apply smart technology in construction sites and construction policy-makers to revitalize smart technology.

  • PDF

A Study on the Difficult Factor of New Technology Development from a Construction Engineering Firm Perspective (건설엔지니어링 기업 측면에서의 신기술 개발의 애로요인 분석에 관한 연구)

  • Yang, Jin-Kook;Hong, Seong-Wook;Lee, Min-Hyeon;Kang, Mi-Suk;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.189-190
    • /
    • 2017
  • The development and utilization performance of the construction new technology was introduced in 2014 according to the detailed evaluation criteria of the construction project of Ministry of Land, Infrastructure and Transport. In the case of the construction new technology, the current standard is give 3 points in the "technology development and investment performance" evaluation item. However, construction engineering companies is difficult for to invest the capital required for new technology development. Therefore, in this study, we try to extract the difficult factor that occur in the process of construction new technology development in terms of construction engineering companies. The research results are expected to provide with the support policy guideline for new technology development costs to policy makers.

  • PDF

Connection Program of Construction New Technology and Results of Construction Transportation R&D (건설교통R&D성과의 건설신기술 연계방안)

  • Park, Hwan-Pyo;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.17-20
    • /
    • 2010
  • Recent Construction and Transportation R&D projects are larger in size, investment scale has been increasing rapidly. However, the results of Construction and Transportation in R & D are papers, patents and other results. So, the application record of R&D in the construction field is very lacking. In particular, Construction New Technology's ratio in the midst of R&D's results are about 2.29%. Therefore, this study suggested program that R&D's results has been connected Construction New Technology. The introduction of the new system has greatly increased Construction New Technology and the results of excellent &D will be applied in construction field. So, Cost-reduction and technology's improvement are expected.

  • PDF

The Actions by Enterprise along the Reforming Construction Management Regulations (건설사업관리 제도개편에 따른 기업의 대응방안에 관한 연구 - 건설기술진흥법 시행과 관련하여 -)

  • Shin, Hyun-Jung;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.54-55
    • /
    • 2014
  • The structure of construction management service in the Construction Technology Management Act has changed recently. The new Construction Technology Promotion Act becomes effective to support and promote the development of related construction industries and construction technology for domestic and overseas markets. The purpose of research is to analyze the main contents of Construction Technology Promotion Act and to investigate corporate status, problems, and issues. The research is conducted to improve as reorganization of the CM service system based on the interviews with experts. Accordingly the research is to derive countermeasures of CM enterprises. The research results are presented in the following categories of contract awarding, project management, human resource management, general administration and staff education management as countermeasures of enterprises.

  • PDF

A Development direction of the building structural system based on the 3D virtual construction (3차원 가상건설기반 건축구조시스템의 개발방향)

  • Shin, Tae-Song;Cho, Young-Sang;Cheon, Jin-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.346-351
    • /
    • 2007
  • As the construction technology is rapidly advancing internationally, the necessity of virtual construction technology development is drastically demanded in the construction industry together with a fusion technology with information technology(IT). The construction technology will be changed as the paradigm of construction technology in the future. The establishment of building structural system in the virtual construction basis is necessary for the integration of construction process, and it will be expected to produce the effect of reduction of construction period and quality improvement through the environment of integration. This study is to present the analysis of the existing process of structural design, the content of research & development as per the building structural system on virtual construction basis and the direction of research.

  • PDF

Task-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.117-121
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. Despite the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the tasks expected to be performed by schedulers has been an on-going concern in the construction industry. This study proposes a task-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A task-technology fit model that aims to measure the extent to which a construction scheduling method functionally matches the tasks expected to be performed by the scheduling staff. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF

Staffing-Technology Fit in Construction Scheduling

  • Yang, Juneseok;Arditi, David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.631-635
    • /
    • 2015
  • Construction managers use scheduling methods to improve the outcome of their project. In spite of the many obvious advantages of the critical path method (CPM), its use in construction has been limited. Understanding the reasons why CPM is not used as extensively as expected could improve its level of acceptance in the construction industry. The link between construction scheduling methods and the capabilities of the scheduling staff has been an on-going concern in the construction industry. This study proposes a staffing-technology fit model to understand why CPM is not used as extensively as expected in construction scheduling. A staffing-technology fit model that aims to measure the extent to which a construction scheduling method matches the staff's experience, know-how and capabilities. The model that is proposed is an answer to the lack of proper instruments for evaluating the extent to which scheduling methods are used in the industry.

  • PDF