Economic Analysis on Repowering Plans for a Outworn Anthracite Power Plant

노후 무연탄발전소의 리파워링 방안에 대한 경제성 분석

  • Kim, Su-Man (Power Generation Division of Korea South-East Power Company) ;
  • Lee, Jae-Heon (School of Mechanical Engineering, Hanyang University)
  • Received : 2013.01.15
  • Published : 2013.03.01

Abstract

In this study, repowering scenarios are analyzed and evaluated from the economical point of view on a case by case basis. Based on the result of evaluation, the IRR indicates 2.34% on single 750 MW LNG combined cycle unit, 3.56% on 500 MW sub-bituminous PC units and 2.31% on 200 MW circulating fluidized bed combustion units, resulting in not reaching 7% rate of discount rate and being concluded uneconomical. However, proposes that it is most economical and feasible to repower power plant into 750 MW LNG combined cycle unit as long as the economic feasibility can be improved and it is necessary for old anthracite power plant to be repowered than rebuilt under the circumstances of lacking power supply.

노후 무연탄발전소를 리파워링함에 있어 현실적인 대안이 되는 시나리오별로 경제성 분석을 시행한 결과 내부수익률은 750 MW급 LNG 복합화력으로 하였을 때 2.34%, 500 MW급 유연탄 석탄화력으로 하였을 때 3.56%, 200 MW급 유동층 석탄화력으로 하였을 때 2.31%로 나타나 경제성 분석 기준으로 삼았던 할인율 7%보다 낮게 평가되어 경제적 타당성을 확보하지 못하는 것으로 평가되었다. 그러나, 현재의 전력거래시장제도가 규제위주에서 시장위주로 변화되어 경제적 타당성이 현재보다 개선되고, 전력수요 대비 공급이 부족한 상황에서 수명이 소진된 노후 무연탄발전소의 리파워링이 불가피하다면 연구된 경제성을 기초로 초기투자비가 적으며, 유휴부지 활용과 연료수급이 수월하고, $CO_2$ 배출량이 상대적으로 적은 750 MW급 LNG 복합화력으로의 리파워링이 가장 효과적인 방안이라고 제시하고자 한다.

Keywords