DOI QR코드

DOI QR Code

해외 가스 플랜트 시공단계의 위험요인 모델을 통한 비용 항목별 확률적 비용 변동범위 분석

An Analysis on the Probability Costs Variation Ranges of the Cost Items from the Risk Factor Model for Construction Phase of Overseas Gas Plant Projects

  • 강현욱 (중앙대학교 일반대학원 건축공학과) ;
  • 원유만 (중앙대학교 일반대학원 건축공학과) ;
  • 강민구 (중앙대학교 일반대학원 건축공학과) ;
  • 김용수 (중앙대학교 건축학부)
  • 투고 : 2011.10.25
  • 발행 : 2012.01.25

초록

The purpose of this study is to analyze the Probability Costs variation ranges of the cost items from the risk factor model for construction phase of overseas gas plant projects. For this purpose, the risk factors were first examined through literature reviews and the main risk factors were selected according to its level of significance and occurrence rate through interviews with professionals. The percentage changes in the total construction cost for each main risk factors were computed and applied to the example case from the past. Monte-Carlo Simulation was employed on these results to analyze the probabilistic variation range. The results obtained from the above procedure are as follows. First, there were a total of ten risk factors including the schedule changes for materials procurement, the prolonged construction schedule, the modifications in design, and the changes in materials costs. Second, the variation ranges of the cost items affected by the above risk factors are as follows. The labor costs varied from 7,702 to 7,815 million KRW; the subcontracting costs varied from 83,688 to 85,495 million KRW; the contingency allowances varied from 7,330 to 7,468 million KRW.

키워드

과제정보

연구 과제번호 : 시나리오 기반의 사업계획 전문가 시스템 개발

연구 과제 주관 기관 : 한국건설교통기술평가원

참고문헌

  1. 강진규, AHP의 이론과 실제, 2010.
  2. 강현욱, 해외 플랜트 건설사업 위험요인을 통한 비용 변동범위 분석, 대한건축학회논문집, 제7호, 2010
  3. 김인호, 건설사업의 위험관리 , 기문당
  4. 김현규, 확률적 기법을 이용한 해외 LNG 플랜트 건설사업의 위험요인에 따른 비용 변동범위 분석, 중앙대학교 일반대학원 석사학위논문, 2010
  5. 이현영, 해외 플랜트 위험 분석 사례 , 한국건설관리학회 학회지 제10권, 2009
  6. 한승현, 해외 LNG플랜트 위험 요인 도출 및 우선순위 평가 : 설계단계를 중심으로 , 한국건설관리학회 제12권 제5호, 2011