이산사건 시뮬레이션을 이용한 고층건축공사의 타워크레인 양중시간 예측모델

Prediction Model for Hoisting Times of Tower Crane using Discrete-Event Simulation in High-rise Building Construction

  • 투고 : 2011.09.01
  • 발행 : 2012.01.25

초록

The selection of appropriate tower crane is a critical for successful project completion in high-rise building construction. It is because the higher buildings are the more resources they need and the longer transportation distance they have. The prediction of hoisting time, which is one of the most important task for selecting the appropriated tower crane, mainly depends on the experience of practitioners and/or historical data. However, with this method, it is difficult to predict the accurate result considering site condition such as the increase of the transportation distance, the layout of stockyard, the specification of various tower cranes, and so on. Therefore, the purpose of this paper is to propose a prediction model for hoisting times of tower crane using discrete-event simulation technique in high-rise building construction. To validate the proposed model, it was applied to actual cases of hoisting time using tower crane in high-rise building projects. As a result, it is a well-constructed model similar to actual transportation using tower crane on-site. The model can support the planner to make a plan of tower crane selection in the future project.

키워드

과제정보

연구 과제 주관 기관 : 국토해양부

참고문헌

  1. 김경민, 서형범, 황호정, 김경주, 터널 버력처리 공정의 시뮬레이션 적용성에 관한 연구, 한국건설관리학회논문집, 8(1), 2007.
  2. 김경주, 건설 공정 시뮬레이션을 위한 독립 자원모델 구축방안 연구, 대한토목학회논문집, 20(4D), 2000
  3. 김상익, 김형문, 서한손, 안병진, 여성칠, 이석구, 이윤동, Minitab(ver.14)을 이용한 통계학의 이해와 응용, 민영사, 2005
  4. 김선민, 경영 시뮬레이션, 한경사, 2002
  5. 김시모, 우경선, 박성수, 초고층 아웃리거 벨트트러스 시스템의 연쇄붕괴 해석, 대한건축학회지회연합회 논문집, 12(4), 2010
  6. 김정진, 초고층 건축공사의 양중계획 시스템에 관한 연구, 명지대학교 건축공학과 박사학위논문, 2002
  7. 김주헌, 유위성, 조훈희, 강경인, 퍼지 기법을 이용한 타워크레인 양중작업의 안전성 평가, 대한건축학회 학술발표대회논 문집, 29(1), 2009
  8. 신윤석, 최희복, 이웅균, 안성훈, 강경인, 초고층 건축공사의 바닥판 거푸집시스템 선정에 관한 연구, 대한건축학회논문집 구조계, 22(2), 2006
  9. 안홍락, 이세헌, 정삼룡, 타워크레인 양중분석 시스템 개발 및 적용, 한국건설관리학회 학술발표대회논문집, 9, 2009
  10. 이성호, 주진규, 이군재, 김선국, 타워크레인 주요 작업의 안전성에 관한 기초 연구, 한국건축시공학회학술.기술논문발표회 논문집, 11(2), 2011 11
  11. 이종렬, 전용석, 박찬식, 고층건축공사 타워크레인 양중시간 예측모델, 한국건설관리학회 학술발표대회논문집, 5, 2004
  12. 이웅균, 김재엽, 서덕석, 강경인, 유전자 알고리즘 모델을 활용한 양중계획 합리화 방안: 타워크레인을 중심으로, 대한건축학회논문집, 20(2), 2004
  13. 조지훈, 조흥구, 프로젝트 공사기간과 연계된 극 초고층 타워 크레인 최적화 선정에 관한 연구, 한국건축시공학회 논문집, 9(6), 2009.
  14. 허담, 이덕찬, 손창백, 신현식, 고층 건축공사의 양중계획 최적화 방안에 관한 연구(I) - Half-PC 아파트 현장을 중심으로", 대한건축학회 학술발표대회논문집, 14(2), 1994
  15. 호종관, 한갑규, 김선국, 타워크레인 기초설계 및 안정성 검토 모델, 한국생태환경건축학회논문집, 7(6), 2007
  16. Chang, D., RESQUE, Ph.D. Dissertation, The Univ. of Michigan, 1987
  17. Halpin, D. W., An Investigation of the use of simulation networks for modeling construction operations, Ph.D. Disser tation, The Univ. of Illinois at Urbana-Champaign, 1973
  18. Leung, A. W. T. and Tam, C. M., Model for assessing hoisting times of tower cranes, Journal of Construction Engineering and Management, 125(6), 1999
  19. Leung, Arthur W. T., Tam, C. M. and Liu, D. K., Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes, Building and Environment, 36, 2001
  20. Kelton, W. D., Sadowski, R. P. and Sturrock, D. T., Simulation with ARENA : 4th Edition, McRraw Hill, 2007
  21. Kim, K. J., and Gibson Jr, G. E., Interactive simulation modeling for heavy construction operations, Automation in Construction, 12(1), 2003
  22. Martinez, J. C., STROBOSCOPE : State and Resource Bas ed Simulation of Construction Process, Ph.D. Dissertation, The Univ. of Michigan, 1996
  23. Paulson, B. C. Jr., Interactive graphics for simulation construction operations, Journal of Construction Division, 104(1), 1978
  24. Rodriguez Ramos, W. E., Quantitative techniques for construction site layout planning, Ph.D. Dissertation, The Unive rsity of Florida, 1982
  25. Tom, C. M. and Tong, Tomas K. L., GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction, Construction management and economics, 21(3), 2003
  26. Zhang, P., Harris, F. C., Olomolaiye, P. O. and Holt, G. D., Location optimization for a group of tower cranes, Journal of construction engineering and management, 125(2), 1999