Abstract
The study presents the way to maximize the functionality and the effectiveness of the BIM model, and the type of information used in the overall process of construction projects. If the designing process is the generator of architecture information, then the step-by-step BIM model created in the process is the container for formation and property information. BIM written rules and methods are proposed in order for the architectural BIM model structured in the early stages of designing to go through a process of review and collaboration, and to be seamlessly linked to the basic designing steps. Accordingly, the BIM model construction and operation strategy suggested will substantially reduce the work of designing, structuring, and collaborating, that will be shared and linked.