References
- 문병로 (2008). 쉽게 배우는 유전 알고리즘, 초판, 한빛미디어, 서울, pp.23-34
- Alarcon, L. (1993). Modeling waste and performance in construction. Lean Construction, A.A. Balkema, The Netherlands, pp. 51-66.
- Akinci, B., Fischer, M. and Kunz, J. (2002). "Automated Generation of Work Space Required by Construction Activities." Journal of Construction Engineering and Management, 128(4), pp.306-315. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(306)
- Cheng, M. Y., and O' Connor, J. T. (1996). ""ArcSite: Enhanced GIS for construction site layout"" Journal of Construction Engineering & Management, 122(4), pp. 329-336 https://doi.org/10.1061/(ASCE)0733-9364(1996)122:4(329)
- El-Rayes, K. and Said, H. (2009). "Dynamic Site Layout Planning Using Approximate Dynamic Programming." Journal of Computing in Civil Engineering, 23(2), pp. 119-127. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:2(119)
- Goldberg, D. E. (1989). Genetic Algorithms in Search, Optimization, and Machine Learning, Addison-Wesley, U.S.A., pp. 1-24.
- Guo, S. (2002). "Identification and Resolution of Work SpaceConflicts in Building Construction."Journal of Construction Engineering and Management, 128(4), pp. 287-295. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(287)
- Hegazy, T., and Elbeltagi, E. (2009)." EVOSITE: Evolution- Based Model for Site Layout Planning."Journal of Computing in Civil Engineering, 13(3), pp. 198-206.
- Jang, H. (2003) "Construction Materials Allocation with Genetic Algorithm." Architectural Research, 5(1), pp.77-83.
- Jang, H. Lee, S., and Choi, S. (2007). "Optimization of floor-level construction material layout using Genetic Algorithms."Automation in Construction, 16, pp.531-545. https://doi.org/10.1016/j.autcon.2006.09.006
- Li, H., and Love, P. E. D. (1998)." Site-level facilities using genetic algorithms."Journal of Computing in Civil Engineering, 12(4), pp.227-231. https://doi.org/10.1061/(ASCE)0887-3801(1998)12:4(227)
- Li, H., and Love, P. E. D. (2000). "Genetic search for solving construction site-level unequal area facility layout problems." Automation in Construction, 9, pp.217-226. https://doi.org/10.1016/S0926-5805(99)00006-0
- Rilett, L. R. and Park, D. (2001). "Incorporating uncertainty and multiple objectives in real-time route selection." Journal of Transportation and Engineering. 127(6). pp.531-539. https://doi.org/10.1061/(ASCE)0733-947X(2001)127:6(531)
- Sanad, H. M., Ammar, M.. A., and E. lbrahim, M. (2008). "Optimal Construction Site Layout Considering Safety and Environment Aspects."Journal of Construction Engineering and Management, 134(7), pp.536-544. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(536)
- Serpell, A., Venturi, A., and Contreras, J. (1995). Characterization of waste in building construction projects. Lean Construction, A.A. Balkema, The Netherlands, pp.67-77.
- Thomas, H. R., Horman, M. D., de Souza, U., and Zavoski, I. (2002). "Reducing variability to improve performance as a lean construction principle."Journal of Construction Engineering and Management, 128(2), 144-154. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(144)
- Tommelein, I. D., Levitt, R. E., and Hayes-Roth, B. (1992). "Sight Plan model for site layout."Journal of Construction Engineering and Management, 128(3), pp. 220-231
- Zouein, P. P., and Tommelein, I. D. (1999)." Dynamic Layout Planning Using a Hybrid Incremental Solution Method."Journal of Construction Engineering and Management, 125(6), pp.400-408. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(400)
- Zouein, P. P., and Tommelein, I. D. (2001). "Improvement Algorithms for Limited Space Scheduling."Journal of Construction Engineering and Management, 127(2), pp.116-124. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(116)
- Zouein, P. P., Harmanani, H., and Hajar, A. (2002). "Genetic Algorithm for Solving Site Layout Problem with Unequal-Size and Constrained Facilities." Journal of Computing in Civil Engineering, 16(2), pp.143-151. https://doi.org/10.1061/(ASCE)0887-3801(2002)16:2(143)
Cited by
- 4D BIM based Workspace Planning Process in Building Construction Project vol.14, pp.5, 2013, https://doi.org/10.6106/KJCEM.2013.14.5.175