Planning of Integrated Test for Propulsion System of Space Launch Vehicle

우주 발사체 추진기관 종합 시험 계획 수립

  • 조상연 (한국항공우주연구원 발사체추진기관팀) ;
  • 김상헌 (한국항공우주연구원 발사체추진기관팀) ;
  • 베르샤데스키 (한국항공우주연구원) ;
  • 오승협 (한국항공우주연구원 발사체추진기관팀)
  • Received : 2011.07.04
  • Accepted : 2011.08.19
  • Published : 2011.10.30

Abstract

Korea Space Launch Vehicle II (KSLV-II) planned to launch in 2021 is 3 stage rocket which can inject 1.5 ton satellite in low earth orbit. KSLV-II will adapt the newly developed liquid rocket engines for its propulsion system of each stage. For the evaluation of development level for rocket engine, integrated system test performed in appropriate facility is needed. In this study, test article and major parameters for certifying the propulsion system of KSLV-II were reviewed and optimum test cycle and test duration for satisfying system reliability requirement were illustrated.

2021년 발사를 목표로 개발이 진행 중인 한국형 발사체는 1.5톤 급의 실용 위성을 지구 저궤도에 올릴 수 있는 3단형 로켓으로 각 단별로 독자적으로 개발된 액체 추진기관 시스템을 적용하게 될 계획이다. 새로운 액체 추진기관의 개발 수준을 평가하기 위해서는 적절한 시험 설비에서 수행되는 시스템 종합시험이 반드시 필요하다. 본 논문에서는 한국형 발사체의 개발을 위한 추진기관 시스템의 개발 인증을 위해 추진기관 시스템의 개발 단계별로 요구되는 시험의 종류와 반드시 확인해야 할 변수들을 검토하고 전체 시스템의 신뢰도 만족을 위해 적절한 시험의 횟수 및 시험 시간을 결정하는 내용을 정리하였다.

Keywords

References

  1. 박창수, "한국형 발사체 시스템 요구조건 검토회의(SRR) 발표자료 및 회의록," RT0KSDBK00012010, 한국항공우주연구원, 2011
  2. 조상연, "추진기관시스템 종합시험계획," DN6PSG0K0001, 한국항공우주연구원, 2011
  3. P. Pempie, and H. Vernin, "Liquid rocket engine test plan comparison," AIAA 2001-3256, 2001
  4. SAE, Liquid rocket engine reliability certification, technical standard ARP-4900, 1996
  5. Alcadia, "Consultancy services for reliability of propulsion system," Final report No.10-114/17, 2011