Abstract
This study conducted the research on the method of grouting quality management and the improvement effect by applying grouting construction's quality management technology to automatic injection management equipment through measure of liquefaction based on the case of reinforcement applying grouting at the region where liquefaction happened at section 12 site of highway construction. The pressure(p), speed(q), grouting penetration radius(R) value from injection pressure, injection speed, characteristics of grain size, and characteristics of viscosity through p-q-t chart analysis was applied to the automatic grouting system which could improve the quality management of grouting. Standard penetration test results after injection showed that N values represented 5-20 and the prevention of liquefaction became possible.
기존의 액상화 방지를 위한 그라우팅은 부정확한 계측장비를 사용하고 시공 품질관리를 경험에 의존하는 단점이 있다. 본 연구는 ${\bigcirc}{\bigcirc}{\bigcirc}$ 고속도로 건설현장 내 말뚝기초 주변의 지반을 그라우팅으로 보강한 사례를 분석하여 액상화 대책공법으로서 그라우팅 보강효과에 대한 연구를 실시하였다. p-q-t 도표 유형분석을 통해서 결정된 주입압, 주입속도 및 주입대상지반의 입도특성, 주입재의 점도특성으로부터 도출한 결과를 그라우팅 자동관리시스템에 적용하여 그라우팅의 주입효과를 높였다. 주입 후 SPT 시험을 실시한 결과 N값이 5-20까지 증가하여 액상화에 대하여 안전한 것으로 나타났다.