Abstract
The simulator models for 500MW fossil power plant have been developed, and interconnected with the turbine control system to test and validate the digital instrumentation & control (I&C) systems before they are implemented in operating power plants. When the performance of a selected digital I&C system is tested, the corresponding simulator model is replaced by the plant digital I&C systems which is considered as a non-tunable system. The input/out variables of simulator models and control systems were mapped using the LabView in interface systems. This paper describes the interconnection method between the simulator model and the digital I&C system, and summarizes the validation test results performed at the condition of steady-state operation, normal evolution, and malfunction. The integrated validation method of digital I&C systems using the simulator models showed that the simulator can be used as a test bed for the implementation of digital I&C systems in power plants.
디지털 계측제어계통을 발전소에 적용하기 전에 시험 및 검증하기 위하여 500MW급 표준화력발전소 시뮬레이터 모델을 개발하고 터빈 제어시스템과 연계하였다. 선택된 디지털 계측제어계통의 성능시험 시, 해당되는 시뮬레이터 모델은 조정할 수 없는 발전소 디지털 계측제어계통과 교체된다. 시뮬레이터 모델 및 제어시스템의 입출력은 연계장치에 있는 LabView 프로그램을 사용하여 연결되었다. 본 논문에서는 시뮬레이터 모델 및 디지털 계측제어계통을 연계하는 방법론에 대하여 기술하고, 정상운전, 과도상태 및 고장인가 시 수행된 검증시험 결과를 제시하였다. 시뮬레이터 모델을 사용한 디지털 계측제어계통의 종합검증을 통하여 시뮬레이터가 디지털 제어시스템을 발전소에 적용하기 위한 시험장치로 사용될 수 있는 방법론을 개발하였다.