Abstract
Underground compressed air energy storage (CAES) system in a lined rock cavern is considered one of the promising large-scale energy storage technologies. In this study, permeabilities of concrete lining block and its construction joint, which are the major components of an air tightness system of the undeground CAES, were measured from a model experiment. From the experiment, it was found that intrinsic permeability of construction joint was larger than that of concrete block by the order scale of $10^1{\sim}10^4$, so that it would be very important to control the quality of construction joints in-situ in order to secure air tightness of storage system. And the permeability of construction joint could be decreased as low as that of the concrete block by pasting an acryl-type adhesive on bonding surfaces. Higher degrees of water saturation of the concrete block resulted in the lower permeability, which is more preferable in the viewpoint of air tightness of storage cavern.
대용량 전력에너지저장시설로서의 복공식 압축공기 지하저장시설의 기밀시스템을 구성하는 콘크리트 라이닝 및 현장 타설 과정에서 발생하는 시공이음부의 투기특성을 파악하고자 콘크리트 블록시료를 이용한 모형실험을 수행하였다. 시공이음부의 투과계수는 콘크리트 블록보다 약 $10^1{\sim}10^4$ 배 정도의 투과성이 큰 것으로 파악되어, 현장 타설과정에서 시공이음부의 품질관리가 저장시설의 기밀성능 확보 관점에서 매우 중요함을 확인하였다. 또한, 접합면에 아크릴계 접착제를 타설함으로써 시공이음부의 투과계수를 콘크리트 블록 수준까지 감소시킬 수 있었으며 콘크리트 블록의 초기 수분함량이 높을수록 투과계수가 감소하여 기밀성능을 향상시킬 수 있음을 확인하였다.