Abstract
The sewage treatment plants to be built to improve the water quality of the Mankyung River will total 11, of which combined capacity will reach $39,850m^3/day$, and saying in detail, 5 at Gunsan city, 2 at Iksan city, 1 at Kimje city and 3 at Wanju gun, The scenario for water quality improvement was developed, considering the conditions of plant operation ratio and the accomplishment of the water quality target (BOD 4.4 mg/L, T-P 0.356 mg/L) at the end of the watershed of Mankyung B was predicted, making use of QUAL2E model. As a result of prediction using QUAL2E model based on scenarios with 70% and 100% of operation ratio, respectively, at 11 plants in 2010, the water quality at the watershed of Mankyung B was estimated at 4.322 mg/L which was lower than the target of BOD 4.4 mg/L, indicating the target water quality was achieved, when it comes to 70% of operation ratio, But in case of T-P, it was estimated at 0.565 mg/L, which was higher than the target. When it comes to 100% of operation ratio, T-P also was 0.563 mg/L which exceeded the target, 0.356 mg/L. As indicated above, the effect of water quality improvement appeared very insignificant, which was attributable to the limit of small scale sewage treatment plant in total reduction capacity. Hence, the measures for additional reduction in a bid to achieve the target water quality of T-P at the designated location need to be taken, and the measures to build the Sewage treatment facilities at the place where the pollution is significantly caused by T-P appeared to be required as well.