Abstract
The purpose of this study was to investigate the performance of precast segmental PSC bridge columns with precast concrete footings. The proposed system can reduce work at a construction site and makes construction periods shorter. The precast concrete footings is intended to support precast segmental PSC bridge columns and provides an alternative to current cast-inplace systems, particularly for areas where reduced construction time is desired. Shortened construction time, in turn, leads to important safety and economic advantages when traffic disruption or rerouting is necessary. A model of precast segmental PSC bridge columns was tested under a constant axial load and a cyclically reversed horizontal load. In the companion paper, the experimental and analytical study for the performance assessment of precast segmental PSC bridge columns with precast concrete footings is performed.
이 연구의 목적은 조립식 기초부를 갖는 프리캐스트 세그먼트 PSC 교각의 성능을 파악하는데 있다. 제안된 프리캐스트 교각 시스템은 현장에서의 작업을 줄이고 공사기간의 단축을 가져올 수 있다. 조립식 기초부는 프리캐스트 세그먼트 PSC 교각의 현장타설 기초부를 대체할 목적을 갖고 있다. 공사기간의 단축은 교통차단이나 교통우회가 필요한 공사의 안전성과 경제성에 직결된다. 프리캐스트 세그먼트 PSC 교각 실험체에 일정 축하중 하에서 횡방향 반복하중을 가하는 준정적 실험을 수행하였다. 연계논문에서는 조립식 기초부를 갖는 프리캐스트 세그먼트 PSC 교각의 성능평가를 위해 실험 및 해석적 연구를 수행하였다.