Abstract
The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.
최근 국내에서 많이 시행되고 있는 BTL(Build Transfer Lease)사업은 수익성이 낮은 문화, 교육, 복지부문의 사회기반시설을 조기에 확충함으로써 국민들의 삶의 질을 높여주는 역할을 한다. 그러나 현재까지 BTL사업의 공사비는 초기공사비에 중점을 두고 있으며, 상대적으로 운영비 산정에 대한 합리적 기준이 정해져 있지 않아 비효율적인 낮은 운영비 관리체계가 되고 있다. 저가 운영비는 사업완공 후 시설 운영시 서비스의 질을 저하할 수 있고, 사업의 성과에도 큰 영향을 미친다. 따라서 본 연구에서는 기존 하수처리시설의 운영부문에 대한 실적자료를 이용하여 사업계획 초기에 운영비와 운영인력을 산정하는 방안을 제시한다. 이러한 연구는 향후 BTL사업으로 시행되는 하수처리시설의 계획시 시설 규모에 따른 개략적인 운영비 산정에 활용성을 갖을 것으로 기대되며, 타 시설물의 BTL사업 운영비 산정체계 구축시 참고 자료가 될 수 있다.