DOI QR코드

DOI QR Code

Process Improvements for Elevating Pre-outfitting Rate of FPSO

FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구

  • Shin, Sung-Chul (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University) ;
  • Cho, Jong-Burm (SAMSUNG HEAVY INDUSTRIES CO.,LTD) ;
  • Shin, Ki-Young (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University) ;
  • Kim, Soo-Young (Department of Naval Architecture & Ocean Engineering, Graduate school, Pusan National University)
  • 신성철 (부산대학교 조선해양공학과) ;
  • 조종범 ((주)삼성중공업) ;
  • 신기영 (부산대학교 조선해양공학과) ;
  • 김수영 (부산대학교 조선해양공학과)
  • Published : 2009.06.20

Abstract

Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

Keywords

References

  1. Bae, M.H., Kim, S.J. and Moon, J.Y., 2007, 'The Optimum Design of Green Water Protector for FPSO,' Special Issue of the Society of Naval Architect of Korea, pp. 94-98
  2. Lee, J.W. and Kim, H.J., 1995, 'Erection Process Planning & Scheduling using Genetic Algorithm,' Transactions of the Society of Naval Architecture of Korea, Vol. 32, No. 1, pp. 9-16
  3. Min, S.G., Lee, S.H., Kim, J.O., Ha, S.J. and Choi, T.H., 2005, 'A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System,' Special Issue of the Society of Naval Architect of Korea, pp. 159-164
  4. Park, J.H. and Hwang, O.J., 2007, 'The Current Situation and Development Direction about FPSO,' Journal of the Society of Naval Architects of Korea, Vol. 44, No. 2, pp. 43-50
  5. Sim, W.S., Moon, J.S. and Shin, H.S., 2004, 'Fatigue design practice in shortened project schedule,' Journal of the Society of Naval Architects of Korea, Proceedings of the Annual Autumn Meeting The Society of Naval Architects of Korea, pp. 902-907
  6. Son, H.J., Kim, T.H. and Park, C.S., 2007 Offshore Engineering, Sunhack publishing company, Incheon

Cited by

  1. A Study on the Hole-Plan system combined with 3D CAD vol.13, pp.1, 2012, https://doi.org/10.5762/KAIS.2012.13.1.1