References
- Anily, S., 'Single-Machine Lot-Sizing with Uniform Yields and Rigid Demands : Ro bustness of the Optimal Solution,' lIE Transactions, Vol.27, No.5(1995), pp.625-633
- Billington, P.J., 'The Classic Economic Production Quantity Model with Setup Cost as a Function of Capital Expenditure,' Decision Sciences, Vol.18, No.1(1987), pp.25-42. https://doi.org/10.1111/j.1540-5915.1987.tb01501.x
- Cheng, T.C.E., 'An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Process,' lIE Transactions, Vol.23, No.1 (1991), pp.23-28 https://doi.org/10.1080/07408179108963838
- Cheng, T.C.E., 'An Economic Production Quantity Model with Flexibility and Reliability Considerations,' European Journal of Operational Research, Vol.39, No.2(1989), pp.174-179 https://doi.org/10.1016/0377-2217(89)90190-2
- Cheng, T.C.E., 'EPQ with Process Capability and Quality Assurance Considerations,' Journal of the Operational Research Society, Vol.42, No.8(1991), pp.713-720 https://doi.org/10.1057/jors.1991.137
- Chiang, A.C., Fundamental Methods of Mathematical Economics, 2nd edition, McGraw- Hill, New York, 1974
- Crosby, P., Quality Is Free, McGraw-Hill, New York, 1979
- Deming, W.E., Quality, Productivity, and Competitive Position, MIT Press, Cambridge, 1982
- Fine, C.H., 'Quality Improvement and Learning in Productive Systems,' Management Science, Vol.32, No.10(1986), pp.1301-1315 https://doi.org/10.1287/mnsc.32.10.1301
- George, M.L., Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, McGraw- Hill, New York, 2002
- Guu, S. and A.X. Zhang, 'The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs,' European Journal of Operational Research, Vol. 145, No.3(2003), pp.635-644 https://doi.org/10.1016/S0377-2217(02)00217-5
- Hall, R., Zero Inventories, Dow Jones-Irwin, Homewood, 1983
- Juran, J,M. and F.M. Gryna Jr., Quality Planning and Analysis, 2nd edition, McGraw- Hill, New York, 1980
- Kim, C.H., Y. Hong, and S.Y. Chang, 'Optimal Production Run Length and Inspection Schedules in a Deteriorating Production Process,' IIE Transactions, Vol.33, No.5(2001), pp.421-426 https://doi.org/10.1080/07408170108936840
- Kim, D. and W.J. Lee, 'Optimal Joint Pricing and Lot Sizing with Fixed and Variable Capacity,' European Journal of Operational Research, Vol.109, No.1 (1997), pp.212-216 https://doi.org/10.1016/S0377-2217(97)00100-8
- Kim, D., 'Optimal Two-Stage Lot Sizing and Inventory Batching Policies,' International Journal of Production Economics, Vol.58, No.3(1996), pp.221-234 https://doi.org/10.1016/S0925-5273(98)00057-7
- Kim, D., V.A. Mabert, and P.A. Pinto, 'Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System,' Decision Sciences, Vol.24, No.1(1993), pp. 126-147 https://doi.org/10.1111/j.1540-5915.1993.tb00466.x
- Kim, S. and B. Arinze, 'A Knowledge Based Decision Support System for Setup Reduction,' Decision Sciences, Vol.23, No.6(1992), pp.1389-1407 https://doi.org/10.1111/j.1540-5915.1992.tb00455.x
- Lee H.L. and M.l. Rosenblatt, 'A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay,' IIE Transactions, Vol.21 , No.4(1989), pp.68-75 https://doi.org/10.1080/07408178908966243
- Lee H.L. and M.J. Rosenblatt, 'Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System,' Management Science, Vol.33, No.9 (1987), pp.1125-1136 https://doi.org/10.1287/mnsc.33.9.1125
- Lee J.S. and K.S. Park, 'Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production,' Journal of the Operational Research Society, Vol.42, No.9(1991), pp.775-783 https://doi.org/10.1057/jors.1991.148
- Lee, W.J., D. Kim, and A.V. Cabot, 'Optimal Demand Rate, Lot Sizing and Process Reliability Improvement Decisions,' lIE Transactions, Vol.28, No.1(1996), pp.941-952
- Leung, K.F., 'A Generalized Geometric Programming Solution to 'An Economic Production Quantity Model with Flexibility and Reliability Considerations',' European Journal of Operational Research, Vol.176, No.1(2007), pp.240-251 https://doi.org/10.1016/j.ejor.2005.06.049
- Liou, M., S. Tseng, and T. Lin, 'The Effects of Inspection Errors to the Imperfect EMQ Model,' lIE Transactions, Vol.26, No.2(1994), pp.42-51 https://doi.org/10.1080/07408179408966595
- Porteus, E.L., 'lnvesting in Reduced Setups in the EOQ Model,' Management Science, Vol.31, No.8(1985), pp.998-1010 https://doi.org/10.1287/mnsc.31.8.998
- Porteus, E.L., 'Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction,' Operations Research, Vol.34, No.1(1986), pp.137-144 https://doi.org/10.1287/opre.34.1.137
- Rahim, M.A. and M. Ben-Daya, 'Joint Determination of Production Quantity, Inspection Schedule, and Quality Control for an Imperfect Process with Deteriorating Products,' Journal of the Operational Research Society, Vol.52, No.12(2001), pp.1370-1378 https://doi.org/10.1057/palgrave.jors.2601238
- Rahim, M.A., 'Joint Determination of Production Quantity, Inspection Schedule and Control Chart Design,' lIE Transactions, Vol.26, No.6(1994), pp.2-11 https://doi.org/10.1080/07408179408966632
- Robinson Jr., E.P. and F. Sahin, 'Economic Production Lot Sizing with Periodic Costs and Overtime,' Decision Sciences, Vol.32, No.3(2001), pp.423-452 https://doi.org/10.1111/j.1540-5915.2001.tb00966.x
- Rosenblatt M.J, and H.L. Lee, 'Economic Production Cycles with Imperfect Production Processes,' lIE Transactions, Vol.21 No.1(1986), pp.48-55 https://doi.org/10.1080/07408178608975329
- Salarneh, M.K and M.Y. Jaber, 'Economic Production Quantity Model for Items with Imperfect Quality,' International journal of Production Economics, Vol.64, No.1-3(2000), pp.59-64 https://doi.org/10.1016/S0925-5273(99)00044-4
- Schonberger, R.J., Japanese Manufacturing Techniques, The Free Press, New York, 1982 https://doi.org/10.1080/13594329408410486
- Schwaller R.L., 'EOQ under Inspection Costs,' Production and Inventory Management, Vol.29, No.3(1988), pp.22-24
- Shingo, S., Modem Approaches to Manufacturing Improvement: The Shingo System Robinson A (ed), Productivity Press, Cambridge, 1990
- Spence, A.M. and E.I. Porteus, 'Setup Reduction and Increased Effective Capacity,' Management Science, Vol.33, No.10 (1987), pp.1291-1301 https://doi.org/10.1287/mnsc.33.10.1291
- Suzaki, K, The New Manufacturing Challenge : Techniques for Continuous Improvement, The Free Press, New York, 1987
- Szendrovits, A.Z., 'Non-Integer Optimal Lot Size Ratios in Two-Stage Production! Inventory Systems,' International Journal of Production Research, Vol.21, No.3 (1983), pp.323-336 https://doi.org/10.1080/00207548308942363
- Tripathy, P.K, W. Wee, and P.R. Majhi, 'An EOQ Model with Process Reliability Considerations,' Journal of the Operational Research Society, Vol.54, No.5(2003), pp.549- 554 https://doi.org/10.1057/palgrave.jors.2601540
- Vickson, R.G., 'Optimal Inspection Sublots for Deteriorating Batch Production,' IIE Transactions, Vol.30, No.11(1998), pp.1019-1024 https://doi.org/10.1023/A:1007551512215
- Voros, J., 'Lot Sizing with Quality Improvement and Setup Time Reduction,' European Journal of Operational Research, Vol.113, No.3(1999), pp.568-574 https://doi.org/10.1016/S0377-2217(97)00447-5
- Womack, J.P., D.T. Jones, and D. Ross, The Machine that Changed the World, Rawson, New York, 1990
- Yano, C.A. and H.L. Lee, 'Lot Sizing with Random Yields: A Review,' Operations Research, Vol.43, No.2(1995), pp.311-334 https://doi.org/10.1287/opre.43.2.311
- Yeh, RH. and T. Chen, 'Optimal Lot Size and Inspection Policy for Products with Warranty,' European Journal of Operational Research, Vol.174, No.2(2006), pp.766- 776 https://doi.org/10.1016/j.ejor.2005.02.049
- Yoo, S.H., 'Collaborative and Integrative Models for Cost and Quality Capability Improvement in a Supply Chain,' Korea University Business School, Unpublished Ph.D. dissertation (2009)
- Zhang X. and Y. Gerchak, 'Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield,' IIE Transactions, Vol.22, No.1 (1990), pp.41-47 https://doi.org/10.1080/07408179008964156